ML20203K115

From kanterella
Jump to navigation Jump to search
Forwards Draft Completion Review Rept for Remedial Action at Slick Rock,Co U Mill Tailings Remedial Action Project Sites
ML20203K115
Person / Time
Issue date: 12/12/1997
From: Joseph Holonich
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rael G
ENERGY, DEPT. OF
Shared Package
ML20203K120 List:
References
REF-WM-86 NUDOCS 9712220211
Download: ML20203K115 (2)


Text

- - _ _ _

December 12, 1997

. Mr. George Rael, Director.

U.S. Department of Energy o

Albuquerque Operations Office ERD /UMTRA P.O. Box 5400

' A1buquegue NM 87185-5400 SUB IECT: DRAFT COMPLETION REVIEW REPORT FOR THE SLICK ROCK, COLORADO, UMTRA PROJECT SITES

Dear Mr. Rael:

The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE's) Completion Report (dated June 1997) for the Uranium Mill Tailings Remedial Action Project sites at Slick Rock, Colorado, as transmitted to NRC by letter dated June 16, 1097. The NRC staff's review of the geotechnical engineering, surface water hydrology and erosion protection, and groundwater protection seas of the remedial action is documented in the enclosed draft Completion Review Report (CRR), which discusses the staff's evaluation of DOE's completion of the actions at the Slick Rock sites against the previously-approved plans and specifications. The staff's review of the radiation cleanup and control results is not included as part of this draft CRR, and will follow under a separate cover at a later date.

Based on its review of the Completion Report, staff has identified several open issues in the areas of cleanup and control of residual radioactive materials and in groundwater protection.

The open issue related to groundwater protection is discussed in Section 2.2.4 of the CRR. This issue, along with other issues to be identified in the forthcoming Radiation Cleanup and Control Review Results section of the CRR, will need to be resolved before NRC can concur in the completion of the remedial action at the Slick Rock sites, if you have any questions conceming this letter or the enclosed CRR, please contact the NRC Project Manager, Charlotte Abrams, at (301) 415-5808.

Sincerely, Original Signed By Joseph J. Holonich, Chief Uranium Recovery Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards J

P/ @

,j cc: S. Arp, DOE Alb i

F. Bosiljevac, DOE Alb dLi l

j E. Artiglia, TAC Alb

Enclosure:

As stated h

DISTRIBUTION w/ Encl.:

File'Conter~

NMSS r/f URB r/f PUBLIC ACNW w/o Encl.: MFederlina MLayton DRom TJohnson DOCUMENT NAME: S:\\DWM\\URBURP\\ SLICK.LTR OFC URB

_A' N

UR O /_

6 U R b /f7 JHoibnich ^

_NAME CAbre cc DG DATE-

-12/ O'/97 f/

12/ l L/97 H

12/(L/97 OFFICIAL RECORD COPY 9712h2 m W

11 971212 get-84 PDR

__Aa

.ea_%__au_-

m

_.m~u p,as.as_a,a,a J mm 4Am em-..'.MA-4eam.M4.m.m..+ae m,._-

-e-a d-aha2-aA.

maa - - - - -

-e--

44 di_+=

..---W.4 s e m-i t

- e i

e Y

g

/

8 a

4 a

f f

1 h

i f

il i

1 i

I I

l ENCLOSURE e

6 4

i s

1 E

4 4

4 4

4 i

l 4

i I

1

+ -,... -

...--r w

---J w

'