ML20203K090

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Quarterly Rept Re Implementation Status of Compliance Plan for Period of 970901-1130.Encl Withheld Per 10CFR2.790(d)(1) & 9.17(a)(4)
ML20203K090
Person / Time
Site: Portsmouth Gaseous Diffusion Plant, Paducah Gaseous Diffusion Plant
Issue date: 12/15/1997
From: Toelle S
UNITED STATES ENRICHMENT CORP. (USEC)
To: Pierson R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19317C805 List:
References
GDP-97-0208, GDP-97-208, NUDOCS 9712220203
Download: ML20203K090 (2)


Text

-

y USEC A oion.nn.,sy comp.or i

December 15,1997 i

. Mr. Robert C. Pierson SEIUAL: GDP 97-0208

- Chief, Special Projects Branch Division of Fuel Cycle Safety i

and Safeguards, NMSS United States Nuclear Regulatr Commission Washington, D.C. 20555-0001 Paducah Gascous Diffusion Plant (PGDP)

Portsmouth Gaseous Diffusion Plant (PORTS)

Docket Nos. 70-7001 and 70-7002 Quarterly Compliance Plan Report i

INFORMATION TRANSMITTED HEREWITH IS PROTECTED FROM PUBLIC DISCLOSURE AS CONFIDENTIAL COMMERCIAL OR FINANCIAL INFORMATION AND/OR TRADE SECRETS PURSUANT TO 10 CFR 2.790(d)(1) AND 9.17(a)(4) i

Dear Mr. Pierson:

In the Introduction section of the PGDP and i 'RTS Compliance Plans, the United States Enrichment Corporation (USEC) committed to provide the Nuclear Regulatory Commission (NRC) with quarterly reports on the imphmentation status of the Compliance Plans. The quarterly Compliance Plan Report for the period September 1,1997 through November 30,1997 is enclosed. As required by the Compliance Plan, enclosed is the following information: 1) an executive summary; 2) tables listing completed / closed Compliance Plan issues and Compliance

(

Plan issues that are scheduled to be completed during the next quarter; and 3) a detailed listing, sorted by noncompliance, of the individual commitments within each Compliance Plan issue.

In accordance with 10 CFR 76.33(e), and consistent with the NRC's December 18,1995 letter, the information related to Compliance Plan issues A.1 through A.5 for PORTS, and A.1 through A.7 for PGDP is considered to be proprietary commercial and financial information pursuant to 10 CFR 2.790(d)(1) and 9.17(a)(4) an ' is exempt from public disclosure. These Compliance Plan issues have been clearly identified as proprietary infomiation.

l

-9712220203 971215

{DR ADOCK 07007001 PDR N

6903 Roddedge Drive, BetFeula, MD 20817-1818 Telephone 301-564-3200 Fax _301-56&M01 http://www.usec.com Omces in Livermore, CA Paducah, KY Pr

>uth, OH Washington, DC m

Mr. Robert C. Pierson December'15,1997 GDP 97-0208, Page 2 Updates to the Executive Summary of this section cithis report are indicated by change bars in the right hand margin. If you have any questions or require additional information concerning the enclosed report, please contact Russ Wells at (301) 564 3245. There are no new commitments contained in this submittal.

Sincerely, 8~-

S.A.

1 Steven A. Toelle Nuclear Regulatory Assurance and Policy Manager

Enclosures:

As stated cc:

NRC Region 111 Office NRC Resident inspector - PGDP and PORTS DOE Regulatory Oversight Manager i