,a NORTHERN STATES POWER COMPANY Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089 License No.
DPR-42/DPR 60 & SNM-2506 (Unit 1, Unit 2 & ISFSI)
Number of Personnel and Man-Rem by Work and Job Function 1997 Number of Persons > 0.100 Total Man-Rem Work / Job Function Station Utility Contract Station Utility Contract Inservice Inspection Operators 0
0 0
0.216 0.0 0.0 Maintenance 13 58 23 4.640 23.541 9.496 Supy & Engr 3
0 43 1.578 0.150 13.739 Health Physics 2
0 10 0.472 0.0 1.980 Instr & Control 0
0 0
0.099 0.0 0.084 Security 0
0 0
0.0 0.0 0.0 Routine Maintenance Operators 0
0 0
0.020 0.0 0.0 Maintenance 19 25 7
5.934 8.429 1.240 Supv & Engr 2
0 4
0.782 0.046 0.914 Health Physics 0
0 0
0.168 0.0 0.205 Instr & Control 3
0 0
1.000 0.0 0.0 Security 0
0 0
0.0 0.0 0.0 Rocctor Ops /Sury Operators 2
0 0
2.724 0.0 0.0 Maintenance 0
0 0
0.287 0.075 0.047 Supy & Engr 5
0 0
2.008 0.023 0.161 Health Physics 11 0
19 2.956 0.0 5.304 Instr & Control 3
0 0
1.389 0.0 0.0 Security 0
0 0
0.0 0.0 0.0 Page 1 of 2 9003040440 900226 PDR ADOCK 05000282 R
PDR J
1 /
i
)i i
i DPR-42/DPR-60/SNM-2506 i
Number of Persons > 0.100 Total Man-Rem
[
Work / Job Function Station Utility Contract Station Utility Contract 4
Rofueling I
i Operators 15 0
0 4.355 0.0 0.0 i
Maintenance 26 58 0
10.581 17.918 0.035 li t
Supy & Engr 2
0 0
1.075 0.025 0.016 Health Physics 0
0 3
0.344 0.0 0.556 Instr & Control 1
0 0
0.124 0.0 0.0 Security 0
0 0
0.0 0.0 0.0 l
Special Maintenance i
operators 0
0 0
0.186 0.0 0.0 i
Maintenance 10 11 10 2.707 4.821 J.179 Supy & Engr 2
0 59 0.971 0.230 29.130 Health Physics 0
0 1
0.403 0.0 1.518 l
Instr & Control 2
0 0
0.252 0.0 0.0 Security 0
0-0 0.0 0.0 0.0 Waste Processing Operators 1
0 0
0.317 0.0 0.0 M31ntenance' 6
0 1
2.816 0.229 0.331 i
Cupv & Engr 0
0 0
0.227 0.050 0.004 Health Physics 2
0 0
0.792
- 0. 0.
0.036 Instr & Control 0
0 0
0.018 0.0.
0.0 Security 0
0 0
0.0 0.0 0.0 Unassigned 1.467 0.048 0.027 Sub totals Operators 18 0
0 7.818 0.0 0.0 I
Maintenance 74 152 41 26.965 55.013 14.328 o
Supy & Engr 14-0 106 6.641 0.524 43.964 Health Physics 15 0
33 4.935 0.0 9.599 Instr & Control 9
0 0
2.882 0.0 0.084 Security 0
0 0
0.0 0.0 0.0 Unassigned 1.467 0.048 0.027 Grand Total 130 152 180 50.708 55.585 68.002 Total Dose 174.295 4
i Page 2 of 2
)
i-w
--it--F
-y*TrtTr*w-e-ryi
a-
---wgtvt-e
- rw*weeMM--e=+*Tw y&m g - p w-ri-
--p99
--Vmg e~
m
=,
4w yr r - n g r-y eym -
,w www w hery w rv'T-*
y-w-#we'v--*-
Q---*-'--'ve e
m'm
i i
i ATTACHMENT 2 i
PRAIRIE ISLAND NUCLEAR GENERATING PLANT ANNUAL REPORT OF SAFETY / RELIEF VALVE FAILURES AND CHALLENGES 1997 3
This report is made in accordance with Prairie Island Technical Specification 6.7.A.1.b i
}
and covers the period from January 1 through December 31,1997.
i Unit 1 -
No failures or challenges Unit 2 -
No failures or c,hallenges Y
i ANNEXP97, DOC
ATTACHMENT 3 PRAIRIE ISLAND NUCLEAR GENERATING PLANT ANNUAL PRIMARY COOLANT IODINE SPIKE REPORT 1997 This report is made in accordance with Prairie Island Technical Specification 6.7.A.1.c and covers the period of January 1,1997 through December 31,1997.
Prairie Island Technical Specification 3.1.D.1 was not exceeded during 1997.
ANNEXP17. DOC