ML20203J718
| ML20203J718 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 12/12/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Subalusky W COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 9712220052 | |
| Download: ML20203J718 (5) | |
Text
... _.. _.
jt** U8g UNITED STATES
{
+
o, NUCLEAH REGULATORY CO*AMISSION 6
8 HEGIOf4 til
(
801 WARREtNitLE ROAD e
LISLE. ILLINOIS 60$32-4351 k 'a e *' /
Docuter 12, 1997 j
f i
Mr. W. T. Subalusky, Jr.
Site Vios President LaSalle County Station Commonwealth Edson Company l
2001 North 21st Road Marseilles,IL 61341 l
SUSJECT: Pt. ANT PERFORMANCE REVIEW (PPR)- LASALLE COUNTY STATION i
l Dear Mr. Subalusky;
. On Odober 20,1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of LaSaue County Nuclear Stauon. The staff conducts them reviews for mN opwating nuclear power plants to develop en integrated understanding of safety pavormanos. The ruults are i
used by NRC management to faclillate planning and abocation of inspection resources. The PPR for LaSate County Staden involved the participation of a8 technical evisions in evaluaung lupoction results and safety performanos informauon for the period Aptt through I
4 September 1997. Ptard Performance Reviews provide NRC mana0ement with a current summary of bloonsee performance and serve as inputs to the NRC Systematic Assessment of Uoensee Performance (SALP) and senior management meeting (8MM) reviews.
in our [[letter::05000373/LER-1997-012, :on 970410,low-low Setpoint Function of Ms S/R SRVs Have Not Been Tested IAW TS Sr.Caused by Inadequate Procedure.Procedures Revised to Functionally Test LLS Logic & ADS Logic|letter dated May 9,1997]], following out previous, PPR, we indicated that the NRC Oversight Panel for LaSalle County Stauon would continue its review of your staffs preparations for LaSalle County Station twtart and your continued implementation of omformance improveman initiatives for Units 1 and 2. The NRC staff is cunently developing an NRC Restart Plan for LaSalle County 8tation which wlN reflect guidance in NRC Manual Chapter 0350, Staff Guidelines for Restart i
Approval? Inspection and oversight activities by the NRC wlN progress in accordance with that Plan.
This letter advises you of our planned inspection effort resulting from the LaSalle County Station PPR review, it is provided to minim 3 e the resource impact on your staff and to allow for 2
scheduling cot.Aicts and personnel avaliabliity to be resolved in advance of inspedor anival onsi6e. The enclosure details our inspection plan for gir; the next 6 months. The redonale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident and region based project engineer inspecuons are not listed due to their ongoing and continuous nature. - in addition, a dedicated NRC en0 r,eering inspector has been assigned to su0 ment the resident i
inspedor staff.
I k
i
-)7{D1 A
\\
i 9712220052 971212 PDR ADOCK 05000373 G
PDR 1
n
W. Subalusky, Jr.
-2 We will inbrm you of any changes to the inspection plan. N you have any questions, please contact Mr. A. Vogel at (630) 829-9628.
- Sincerey, 4M#t.WntDir.aor i
Division of Reactor Projects Docket Nos.: 50-373, 50 374 Ucense Nos.: NPF41, NPF-18 finclosure: Inspection Plan cc w/ encl:
O. Kingsley, Nuclear Generation Group President and Chief Nuclear Officer M. Wallace, Senior Vice President, Corporate Services E. Kraft, Vice President BWR Operations Watson Officer, NOC BOD D. A. Sager, Vice President, Generation Support D. Farrar, Nuclear Regulatory Services Manager
- 1. Johnson, Ucensing Operations Manager Document Control Desk Ucensing F. Decimo, Plant General Manager P. Bames, Regulatory Assurance Supervisor Richard Hubbard Nathan Schloss, Economist Office of the Attomey General State Usison Officer Chairman, Illinois Commerce Commission DOCUMENT NAME: R:\\lNSPECT.PLN\\LASALLE\\LAS-PPR.597 To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy I OFFICE Rlll I t' Rlli l
Rlli i r)
Rill I/d Rlli
[N NAME Hills /co N@
Leach ////
Duncan O M d Gavuta 00()
Gardner 0Y W DATE 11/ 97 W2/97 11/
11// /97V 11/J#97 4A muummusum uma monummmmum um um l
OFFICE Rint, \\
(v Rlli Rill 6
Rill Rlli l
NAME Cr M i" Shear /P/<v Vogel 14 Grant (4f j
DATE 11/ki97 11/ # 97 11M/97 illIV9M V 11/ /97 l
OFFICIAL RECORD COPY i
l
~
W. Subalusky, Jr.
2 We will inform you of any changes to the inspection plan if you have any questions, please conted Mr. A. Vogel at (630) 829 9628.
Sincerely, 5
c.
Goodwy E. Grant, Diredor Division of Roador Projects Docket Nos.: 50 373, 50 374 Ucense Nos.: NPF-11, NPF 18 Endosure: Inspection Plan oc w/ encl:
O. Kingsley, Nudear Generation Group Presiderd and Chief Nuclear Offloor i
M. Wausos, Senior Vloe i
Presiderd, Corporate Services E. Kraft, Vice Presiderd BWR Operations Unison Of6cer, NOC-800 D. A. Sager, Vice President, Generation Support D. Farrar. Nuclear Regulatory Services Manager
- 1. Johnson, uoensing operations Manager Document Control Desk-Ucensing F. Daoimo, Pferd General Manager P. Barnes, Regulatory Assurance Supervisor Richard Hubbard Nathan Schloss, Economist Of6ce of the Attomey General State Uaison Officer Chairman, Illinois Commerce Commission i
(
i l
- w. subakaky, Jr.
4 Estribution:
Docket Fue Wenci DRP w/end OCFO/LFARS Wenci T88 w/onal PUBLIC IE 01 w/onal DRS (2) w/enci A. Beach Wenol Rill PRR w/enci Deputy RA Wenci RAC1 (E Mail) l Rlli Enf. Coord. Wend CAA1 (E-Mail)
BRI LaSaNo Wend DOCDESK(E-Mail)
Project Mgr., NRR Wenci I
l
E I
Enclosure l
LASALLE COUNTY STATION INSPECTIONfACTMTY PLAN IP-Inspects Procedure Ti-Temporary instructm Core inspechon - Minimum NRC lospechon Picy e (mandatory at plants)
INSPECTIONI TITLEI NUMBER OF NRC PLANNED TYPE OF l
l ACTMTY PROGRAM AREA INSPECTORS (
DATES WiSPECTIONIACTMTY-INDMDUALS COMMENTS l
IP 62706 Maintenance Rule 6
January 12-16 RegonalInit' trve e
IP 82701 Operational Status of 1-2 February 9-13 Regmal initiatwe*
Emergency Preparedness Program l
IP 84750 Chemistry 1-2 February 2344 arch 2 Core inspection IP 37500 Engineenng and Technical 4-5 March 9-27 Regional trwbatwe*
support inspection safety IP 40500 Assessment and Quality l
Venfication inspection
[
IP 93802 Restart Reediness 4
Dependent on Regional frutatwe*
Assessment Team Licensee Restart l
Inspection Schedule j
i IP 82301 Reviewof Or-c eicy 1-2 March 9-13 Core inspechon r -
Preparedness (EP) Exercise IP 82302 Review of EP Scenario IP 83750 Occupatmal Radiation 1-2 April 6-10 RegionalInihative*
Fvnne rn
- RegionalInitiatives Based Upon Previous Performance 2
f
J Endosure LASALLE COUNTY STATION INSPECTKNACTMTV PLAN IP-Inspection Procedure T1-TemporaryInstruchon Core inspecSon - Minimum NRC Inspechon Prvvi.e. (mandatory a5 plants) 1 INSPECTION /
TITLE /
NUMBER OF NRC
- PLANNED TYPE OF ACTMTY PROGRAM AREA INSPECTORSI DATES INSPECTION /ACTMTY-INDMDUALS COMMENTS i
IP 83750 Occupational ~ Radiation 1-2 June 8-12 Reponal Inst.ative*
1:-cire j
r
- RegionalInitiatives Based Upon Previous Performance l
I r
i 3
i f
l 1
i 1
i
- -