ML20203J115
| ML20203J115 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/30/1986 |
| From: | Standerfer F GENERAL PUBLIC UTILITIES CORP. |
| To: | Travers W Office of Nuclear Reactor Regulation |
| References | |
| 0056P, 4410-86-L-0131, 4410-86-L-131, 56P, NUDOCS 8608050183 | |
| Download: ML20203J115 (1) | |
Text
GPU Nuclear Corporation Ngg gf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057-0191 717 944-7621 TELEX 84 2386 Writer's Direct Dial Number:
(717) 948-8461 4410-86-L-0131 Document ID 0056P July 30,1986 TMI-2 Cleanup Project Directorate Attn: Dr. W. D. Travers Director US Nuclear Regulatory Commission c/o Three Mile Island Nuclear Station Middletown, PA 17057
Dear Dr. Travers:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 TMI-2 Appendix B Technical Specification 3.2.1 Notification Pursuant to GPU Nuclear letter 4410-86-L-0124 dated July 22, 1986, GPU Nuclear is providing the following information concerning environmental sample location M1-2 which was installed on July 22, 1986.
Location Distance and Direction This station is located west 0.5 miles WSW 241o of TMI on an unnamed island between Beach Island and Shelley Island.
Additionally, environmental sample location Pl-2, which was described in the above referenced letter, also was installed on July 22, 1896.
Sincerely, 8608050183 860730 A)
PDR ADOCK 05000320 44 sgy P
PDR F. R. Standerfer Vice President / Director, TMI-2 FRS/RDW/eml
[s GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation