Forwards SER on 970408 Proposed Change Request to QA Program as Described in Section 17.2 of FSAR for Vogtle Electric Generating Plant,Units 1 & 2.Review of Submittal Determined Change Request Does Not Conform to 10CFR50,App B
ML20203H949
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/23/1998
From: Jaffe D
NRC (Affiliation Not Assigned)
To: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20203H952 List:
References
TAC-M98512, TAC-M98513, NUDOCS 9803030369
Download: ML20203H949 (3)


Text

- . .__ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

?

!. l Mr. C. K. McCoy February 23,~1998-g pg Southem Nuclear Operating.

Company, Inc.

Post Office Box _1205 Birmingham, Alabama 352011295 .

SUBJECT:

PROPOSED CHANGES TO THE QUALITY ASSURANCE PROGRAM -

VOGTLE ELECTRIC GENERATING PLANT, UN!TS 1 AND 2 (TAC NOS. Mg8512 AND Mg8513)'

Deer Mr. McCoy:-

By letter dated April 8,1997, Southem Nuclear Operating Company requested a change to the Quality Assurance (QA) Program as described in Section 17.2 of the Final Rafety Analysis Report -

(FSAR) for Vogtle Electric Generating Plant, Units 1 and 2.

- We have reviewed this submittal and dotermined it does not conform to 10 CFR Part 50, Appendix B regulatory requirements and quality assurance commitments previously accepted by the NRC.

The proposed deletion from the QA program description of the FSAR Section 17.2.3.G

- requirement to verify or control unverified design output prior to use for subsequent design -

' or support activities, such as procurement, manufacturing, or installation is not acceptable. The proposed change would permit the use of uncontrolled, unverified design output to be used in subsequent design activities and support activities, such as procurement, manufacture, or construction. Although the requirement to complete design verification prior to reliance on an item's function would be retained, the practice of using unverified design output in subsequent

- activities would unacceptably reduce the level of assurance of the design besis.

- The_ enclosed Satety Evaluation provides the details of our review.

Sincerely,-

hvN. JaN,TenNr Project Manager Project Directorate ll 2 __

Division of Reactor Projects.1/II -

Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50 425

Enclosure:

As stated i

cc w/ encl: See next page '

DISTRIBUTION: JZwolinski y& m _ ,,

Docket File K. Heck, NRR PUBLIC ACRS~

d.c a; b~+ "M" *Q. ',"1 PD ll-2 Rdg DJaffe HBerkow - LBery Reyes,Rll . PSkinner, Ril

[

DOCUMENT N4ME: _ _g To receive a copy of this document leadicate in the boni "Q" = Copy without enclosures "E" = Copy with enclosures fN" = No capr OFFICE PM:PDil 2\M a LA:PDil-2 \1 / PD:PDil-2 O G C,-/=

NAME DJaffe: cal t \V \g LBerry AfD HBerkow(VC'.T C '7M cM "

DATE 0215798 r 024<ge - \. 02izyg8 v letn 2/ n /'18

,g -\

OFFICIAL RECORD CQj8Y -

9003030369 990223 PDR ADOCK 05000424 '

P PDR 4

+

j

o s.* 28ev jye t UNITED STATES -

N NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3000H001 k*..* February 23, 1998 Mr. C. K. McCoy Vice President Southem Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 352011295

SUBJECT:

PROPOSED CHANGES TO THE QUALITY ASSURANCE PROGRAM .

- VOGTLE ELECTRIC GENERATING Pt. ANT, UNITS 1 AND 2 (TAC NO3. M98512:

AND M98513)

Dear Mr. McCoy; l

By letter dated April 8,1997,' Southem Nuclear Operating Company requested a change to the ,

Quality Assurance (QA) Program as described in Section 17.2 of the Final Safety Analysis Report (FSAR) for Vogtle Electric Generating Plant, Units 1 and 2.

We have reviewed this submittal and determined it does not conform to 10 CFR Part 50, Appendix B regulatory requirements and quality assurance commitments previously accepted by

. the NRC.

The proposed deletion from the QA program description of the FSAR Section 17.2.3.G '

requirement to verify or control unverified design output prior to use for subsequent design --

or support sctivities, such as procurement, manufacturing, or installation is not acceptable.-The proposed change would permit the use of uncontrolled, unverified design output to be used in-subsequent design activities and support activities, such as procurement, manufacture, or construction.- Although the requirement to complete design verification prior to reliance on an item's function would be retained, the practice of using unverified design output in subsequent activities would unacceptably reduce the level of assurance of the design basis.

The enclosed Safety Evaluation prov; des the details of our review.

rely,

\ \-

David H. J , Senior Project Manager Project Directorate ll-2 Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

As stated cc w/ encl: See next page

1

= Vogtle Electric Generating Plant -

cc: Harold Rebels, Director Mr. J. A. Bailey - Department of Natural Resourc6s Manager, Licensing 205 Butler Street, SE. Suite 1252.

. Southem Nuclear Operating . Atlanta, Georgia 30334 Company, Inc.

P. O. Box 1295 ' - Attomey General Birmingham, Alabama 35201 1295 = Law Department 132 Judicial Building Mr. J. B. Beasley- - Atlanta, Georgia 30334 General Manager, Vogtle Electric Generating Plant . Mr. R. D. Barker Southem Nuclear Operating Program Manager _

Company, Inc. Fossil & Nuclear Operations P. O. Box 1600 Oglethorpe Power Corporation Waynesboro, Georgia 30830 2100 East Exchange Place .

P. O. Box 1349 Regional Administrator, Region ll Tucker, Georgia 30085-1349 U. S. N.uclear Regulatory Commission Charles A. Patrizia, Esquire Atlanta Federal Center - Paul, Hastings, Janofsky & Walker 61 Forsyth Street, SW.~, Suite 23T85 10th Floor Atlanta, Georgia 30303 1299 Pennsylvania Avenue <

Washington, DC 20004-9500 i Office of Planning and Budget

' Room 615B Arthur H. Domby, Esquire 270 Washington Street, SW. Troutman Sanders Atlanta, Georgia 30334 NationsBank Plaza

- 600 Peachtree Street, NE.

Mr. J. D. Woodard suite 5200 Executive Vice President Atlanta, Georgia 30308-2216 Southem Nuclear Operating Company, Inc. Resident inspector .

P, O. Box 1295 = . Vogtle Plant Birmingham, Alabama 352011295 8805 River Road Waynesboro, Georgia 30830 Steven M. Jackson Senior Engineer- Power Supply Office of the County Commissioner Municipal Electric Authority Burke County Commission of Georgia Waynesboro, Georgia 30830 4 1470 Riveredge Parkway, NW.

Atlanta, Georgia 30328-4684

_ _ _ . _ _ _ _ _ . _