Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _
b.
8 UNITED STATES 1
NUCLEAR REGULATORY COMMISSION 3
E WASHINGTON, D. C. 20555 s
April 28, 1986 Docke't No. 99900225/85-01 The Foxboro Company ATTN: Mr. J. W. Graham Vice President 38 Neponset Avenue Foxboro, Massachusetts 02035 Gentlemen:
This refers to the inspection conducted by Mr.- J. J. Petrosino of this office on December 9-13, 1985, of your facility at East Bridgewater, Massachusetts and to the discussions of our findings with Mr. M. J. Berberian and members of your staff at the conclusion of the inspection.
The purpose of this inspection was to review the circumstances surrounding the conductor insulation degradation of a 15 conductor retractable cable. This cable was a part of the Foxboro supplied "E line" controllers. Areas examined during the inspection and our findings are discussed in the enclosed report.
Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During the inspection it was found that the implementation of 'your QA program failed to meet certain NRC requirements.
Inadequate implementation of your QA procedures was apparent in the areas of indoctrination, 10 CFR Part 21 procedures, internal in-process audits, and a lack of 10 CFR Part'21'reportability evalua-i tions for several NRC licensee.related problems which were recorded on Foxboro failure analysis reports. The most significant of these was the failure of The Foxboro Company to perform the' required 10 CFR Part 21. notifications. This was evidenced by a'1979 Foxboro report (ref. #CFA-28), in which the conductor insulation disintegrated on all-15 conductors of an "E line," interconnection cable set. This insulation disintegration problem was identified to Foxboro in the fall of 1978. The specific findings and' references to the pertinent requirements are identified in the enclosures to this letter.
The enclosed Notice of Violation is sent to you pursuant to the provisions of.
Section 206 ~ of the Energy Reogranization Act of 1974.. 'You are required to submit to this office within 30 days from the date.of this letter a written statement containing:
(1) a description of steps that have been or will be taken to correct these items;-(2) a description of steps that have been or will be taken to prevent recurrence;.a'nd-(3) the dates your corrective actions and preventive ceasures were or'will be completed. Consideration may be given to extending your response time for good'cause shown.
8604300048 860428' PDR GA999 EMVFOXB 99900225 PDR M
.t.
The Foxboro Company April 28,1986 3
You are also requested to submit a similar written statement for each item which appears in the enclosed Notice of Nonconformance.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with'you.
Sincerely, 4
A Gary G. Zech,' Chief Vendor. Program Branch.
Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement f
Enclosures:
1
' Appendix A-Notice of Violation 2.
Appendix B-Notice of Nanconformance 3.
Appendix C-Inspection Report No. 99900225/85-01 i
4.
Appendix D-Inspection Data Sheets (2 pages) cc: Mr. Michael Berberian The Foxboro Company 38 Neponset Avenue Foxboro, Massachusetts 02035 4
1 l
l
. i
- l I
a e
1 r-T e
w q--
s.
The Foxboro Company April 28, 1986 You are also requested to submit a similar written statement for each item which appears in the enclosed Notice of Nonconformance.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,.
Wnst 4**
any S 1#
Gary G. Zech, Chief i
Vendo'r Program Branch Division-of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement t'
Enclosures:
1.
Appendix A-Notice of Violation 2.
Appendix B-Notice of Nonconformance 3.
Appendix C-Inspection Report No. 99900225/85-01 4.
Appendix D-Inspection Data Sheets (2 pages)-
cc: Mr. Michael Berberian The Foxboro Company 38 Neponset Avenue Foxboro, Massachusetts 02035 Vru xeading.
DQAVT Reading
.RVollmer JStone i
RLBaer l
Region II EMerschoff-JPetrosino(2)
.i EYachimiak RPaolino, Region I CAnderson, Region I TMurley, RI JNelson Grace, RII JKeppler, RIII RMartin, RIV 4
-JMartin, RV r.
}
- See previous.page for concurrences.
I VPB:DQAVT SC/VPB:DQAVT BC/VPB:DQAVT
. DIR:DQAVT -
JPetrosino:tt* EMerschoff*
GZech* -
BGrimes*
03/06/86 03/26/86 04/22/86
.04/24/86-
. -