Discusses Analysis of Prompt Alert & Notification Sys,Per FEMA 44CFR350,App 3 to NUREG-0654,Rev 1 to FEMA-REP-1 & FEMA-43.Sys Satisfies Requirements.Caveat on Alert & Notification,Contained in 840912 44CFR350 Approval,Removed
ML20203H888
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/03/1986
From: Speck S
Federal Emergency Management Agency
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20203H879 List:
References
RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8608050123
Download: ML20203H888 (1)


Text

\\

( Federal Emergency Management Agency

)

Washington, D.C. 20472 Taylor o

Cys: Cover letter 3 g#

only:

7['if' IN 3 1986 stello R

N Roe Mr. Victor Stello, Jr.

f Rep niezek Executive Director for Operations hsMhi U.S. Nuclear Regulatory Cmmission s

u n ngham Washington, D.C.

20555 pt Ner

Dear Mr. Stello:

The Federal Dnergency Management Agency (FEMA) has cmpleted an analysis of the prmpt alert and notification system for the Byron Nuclear Power Station in Byron, Illinois. 'Ihis review has been cmpleted pursuant to FEMA rule 44 CFR 350, selected evaluative criteria and Appendix 3 in NUREG-0654/ FEMA-REP-1, Rev. 1; and FEMA-43, the " Standard Guide for the Evaluation of Alert and Notification Systems for Nuclear Power Plants" (now published as FEMA-REP-10).

'Ihe enclosed report entitled " Byron Nuclear Power Station Site-Specific Offsite Radiological Dnergency Preparedness Alert and Notification System Quality Assurance Verification" summarizes the engineering design review, incorporates the results of the telephone survey of the public conducted innediately following activation of the alert and notification system on Decanber 3,1985, and confirms the adequacy of the applicable evaluative criteria fran NUREG-0654/ FEMA-REP-1, Rev.1, and FEMA-43.

Based on the engineering design review and the results of the telephone survey, FEMA has determined that the alert and notification system installed around the Byron Nuclear Power Station satisfies the requirements of NURED-0654/

FEMA-REP-1, Rev.1, and FEMA-43. 'Iherefore, there is reasonable assurance that the system is adequate to prouptly alert and notify the public in the event of a radiological emergency at the site. 'Ihe caveat on the alert and notification contained in the 44 CFR 350 approval dated Septanber 12, 1984, is now removed. Governor James R. 'Ihompson of Illinois has been advised of this approval.

Sincerely,

& Y.

f f amuel W. Speck Jasociate Director State and Iocal Programs and Support Enclosure yjtl 11 N 8608050123 860730 PDR ADOCK 05000454 F