ML20203H816

From kanterella
Jump to navigation Jump to search

Forwards Revised Exhibits 17 & 18 of Author to Resolve Open Issue 3 Re Inadequate Core Cooling.Equipment Installed & Final Connections Being Made.Equipment Will Be Filled & Calibr by End of Sept 1986
ML20203H816
Person / Time
Site: Beaver Valley
Issue date: 07/31/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Harold Denton, Tam P
Office of Nuclear Reactor Regulation
References
2NRC-6-075, 2NRC-6-75, TAC-62872, NUDOCS 8608050101
Download: ML20203H816 (4)


Text

e

}Vs

'Af 2NRC-6-075 Beaver Valley No. 2 Unit Project organization Telecopy ( 1 ) 643 Ext.160 S E.G July 31, 1986

,, Bo 2 Shippingport, PA 15077 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Open Issue No. 3, Inadequate Core Cooling

REFERENCE:

Letter from J. J. Carey to H. R. Denton, Dated April 11, 1986 Gentlemen:

Figure III and Exhibits 17 and 18 of Reference (a) have been revised and are attached to resolve this item.

DLC has also been asked to address the schedule for installation of this system.

The equipment is currently inst alled and final connections are being made.

It is scheduled to be complete (filled and calibrated) by the end of September,1986.

DUQUESNE LIGHT COMPANY By Jf)l($4 rey

(/

Wte President GLB/ijr NR/INAD/ CORE AR/NAR Attachments cc:

Mr. R. Karsch

- w/ attachments Mr. L. Prividy, Resident Inspector

- w/ attachments Mr. W. Troskoski, Resident Inspector - w/ attachments 0h 0

l u,i, 8608050101 860731

\\

PDR ADOCK 05000412 A

PDR

(

d

'=

as s

a "m

v

=

"A.

GN IWARD E= m LE T V U EO "o

YLY n

E n

A o

Er F LL vA I

E t

i t

L l

o ASD E

I VS U R E L U RVF G E

IF VR N AO O ETI BCT A A E T R NE M

UR m

4 TS m

N I

m I

\\

\\

^

L ESSEV l

9 PAGE 2 DETAIL DATA

?4/02/>8 0=:02:?1 UPPR FULL D'.'N AM I C RNG DP RNG DP HD DP TE1313 LT1310 LT1311 LT1312

" E

  • F XXXXXX B Ill M

THI Itt XXMMMX e Iti LI 1311

~

isTE1314 J

1-NNXN B,*F 3gg L

J T

LIS1310 0FFSCALE TE1315 TE1318 LID XXX8B'F 3

LIT 1312 TE1316

XXXXB F m

TE1317 OFFSCALE no

  • F RV LVL RCPS OFF STATIC HD UPPR RNG

%Lvt STATIC HD FULL RNG


%LVL DYNAMIC HD

%LIO THDT ILD

'F UR PRESS ILD PSIG AlltlUt1CIATORS RPU STATUS DPU-A DPU-B SOURCE PSS I-M I I I-1[

N1-i[

Ei]

Hil DPU-A NUC RVL CDR P-T II-Ei]

IV-M is===mung EXIIIBIT 17

i PAGE 3 DETAIL DATA

?4/02/>8 0=:02:?4 UPPR FULL DYNANIC RNG DP RNG DP HD DP TE1323 LT1320 LT1321 LT1322

" XXXX B *F M

THI Its XXXXXXeIn M 1HI Its r-oi LIS1321

]

nTE1324

_J 3.

MX)

  • F ISD 1

I T

l a

LIS1320 0FFSCALE TE1325 TE1328 1.5-.U.

ND

  • F 3

TE1326,Fn LIS1322 MX-m TE1327 DFFSCALE KHMN B *F PV LVL RCPS OFF STATIC HD UPPR RNG

%LVL STATIC HD FULL RNG

%LVL DYNAlilC HD

%LIO THDT ALD

  • F UR PRESS ALD PSIG ANNUNCIATORS RPU STATUS DPU-A OPU-B SOURCE PSS II-@uu I-

]

III-H N1-40 Ei]

Hil DPU-A NUC RVL CDR P-T l

IV-Gi]

]FFLINE isummmena EX11IBIT 18