Forwards Semi-Annual FFD Program Performance Data Rept for Union Electric Callaway Nuclear Plant for Reporting Period Jul-Dec 1997,IAW 10CFR26.71(d)
ML20203H409
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/25/1998
From: Peevy J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3745, NUDOCS 9803030217
Download: ML20203H409 (5)


Text

-

4' Union EI:ctric PO Ikst G20 canaway /wr Fulton, MO fA251 February 25,1998 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Washington, DC 2055.' 0001 ULNRC-3745 Gentlemen:

DOCKET NUMilER 50-483 N

CALLAWAY PLANT UNIT I

((ffg[$$

FACILITY OPERATING LICENSE NPF-30 g

Semi-Annual Fitness For Duty Pronram Performance Data Report for Union Electric Callaway Plant F

Enclosed is the Semi Annual Fitness For Duty Program Performance Data Report for Union Electric's Callaway Nuclear Plant in accordance with 10CFP,26.71(d). This report applies to the period beginning July 1,1997 and ending on December 31,1997.

The enclosure includes the following:

Attachment A - Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (2 pages):

Attachment B - Fitness For Duty Management Action with egard to (1 page):

Initiatives Taken e

Lessons 14 uned Reportable Fitness For Duty Events Under 10CFR26.73.

e If you have any questions in regard to the Performance Data Report, please contact me at (573)676 8245.

Sincerely, ames R. Peevy Manager, Emergency Preparedness JRP/RGIUlh,/rmm i

Ao}/

Enclosure

/

jn um aggg

~'

.f,,f,f.lfff.flf PDR

.u.

UI.NRC-3745 February 25,1998 Par-2 U. S. Nuclear Regulatory Commission (Original and 1 copy) cc:

Attn: Document Control Desk Mail Stop Pl-137 Washington, DC 20555-0001 Mr. Ellis W. Merschoff Regional Administrator U S. Nuclear Regulatory Commission Region IV 61i Ryan Plaza Drive, Suite 400 Arlington, TX 76011 8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Barry C. Westreich (2 copies)

Acting 1 '.ensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13L 6 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Scrvice Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Bax -

Shaw, Pittman, Potts, & T.:wbridge 2300 N. Street N.W.

Washington, DC 20037

ULNRC-3745 February 25,1998 Attachmerit A Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (NUM ARC Rev. Date 1/92)

Union Electric July - December 1997 Company 6 Months 3

Callaway Plant 1 ocation Patricia Davis, R. N.

(573) 676-4300 Contact Name Phone (include Area Code)

Cuttoffs: Screen / Coni'irmation (ng/ml)

Appendix A to 10CFR26

(

Marijuana 20/ 15 Amphetamires 1000 / 250 Barbiturates 300 /150 Cocaine 300/150 Phencyclidine 25 / 25 Benrodiazepines 300 / I50 Opiates 300/150 Alcohol

(.04% BAC)

Long-Term Short-Term Testing Results 1.icensee Employees Contractor-Personnel Contractor-Personnel Average Number with Unescorted Access 848 133 45 Categories Tested Positive Tested Positive T sted Positive 7

Pre-Access 14 0

0 0

Ii1 0

Post Accident 0

0 0

0 0

0 Observed Behavior 0

0 0

0 0

0 Random 235 1

39 1

27 0

Follow-up I

0 0

0 1

0 Other 0

0 0

0 0

0 Total 250 1

39 139 0

i I

ULNRC-3745 February 25,1998 Attachment A Breakdown of Confirmed Positive Tests for Specific Substances "A

Refinal

Ig

~0+"2-

  • Marijuana Cocame

- Opiates)

  • Amphecarnines Phencyclidine.' ; Alcohol y Test Barbnurates M

.n y

Licensee';

1 Employees x

lLong>

1

Term' 2

Contractor

-i s -

2 Six>rt-f

. Term..

Contractor 3..

~ TOTAL:

0 0

1 0

0 0

0 0

1 0

0 0

l

  • Left Side Record of test results that would have been Positive at the NRC cutofflevel.

Right Side Record of MRO confirmed positives based on Union Electric's more stringent cutofflevel.

a.

~*.

ULNRC-3745 February 25,1998 Attachment B initiatives Taken 1

The Axsym, from Abbott Laboratories, was installed in the on-site testing facility to improve the overall effectiveness of the badging process.

Lessons Learned On December 1,1998 a blind proficiency specimen spiked with Benzodiazepines was submitted to the DilllS Certified Laboratory for testing. The DlHIS Laboratory reported the specimen as

- negative. This specimen had previously screened positive for Benzodiazepines in the on-site testing facility. An investigation was initiated to determine the cause for the difference in the results. This concern was reported to the NRC in accordance with 10 CFR 26, Appendix A, 2.8(e).- The investigation determined that the cause of the false negative result was a clerical error

. at the Dillis Laboratory.

Reportable Fitness for Duty Events Under 10 CFR 26.73 There were no reportable Fitness for Duty events during this reporting period.

_.___-_____m._____2__.-.___