ML20203F915

From kanterella
Jump to navigation Jump to search
Forwards Inservice Insp Repts for Interval 2,Period 1,Outage 1 & Interval 1,Period 3,final Outage
ML20203F915
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 04/17/1986
From: Pliml G
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20203F921 List:
References
NUDOCS 8604280181
Download: ML20203F915 (1)


Text

v-9

'D thh o

Commonwealth Edison Zion G:n; rating Station Ap L./

Shiloh Blvd. & Lake Michigan U

"/

Zion, Illinois 60099 Telephone 312/746-2084 FRIORITY COUTING gp April 17, 1986

/a--w nq+ l sMD.

J R

$[ Mh-Mr. James G.

Keppler

'2; Regional Administrator flLF Office of Inspection and Enforcement Region III U.

S. Nuclear Regulatory Commission Glen Ellyn, IL 60137

Dear Mr. Keppler,

Attached are two reports of inservice inspections performed at Commonwealth Edison Company, Zion Unit 2 from September 5, 1985 through January 22, 1986.

One report covers the Interval 1 Final inspections.

This report is submitted to you in compliance with the requirements of Article IWA-6000 of Section XI of the ASME Boiler and Pressure Vessel Code 1974 Edition through 1975 Addenda.

The other report covers the Interval 2 Period 1 Outage 1 inspections.

This report is submitted to you in compliance with the requirements of Article IWA-6000 of Section XI of the ASMS Boiler and Pressure Vessel Code 1980 Edition through Winter 1981 Addenda.

Both of these reports are in compliance with the requirements of Zion Technical Specifications 4.3.4.C. and 6.6.3.C.

If there are any additional questions, please contact Mr.

M.P.

Madigan at Zion Station.

Sincerely,

)d G.

J. Pliml Station Manager Zion Station GJP/M M/rmm cc:

R. Cascarano/A. Ockert (w/o attachment)

T. Rieck (w/o attachment)

M. Holzmer (w/o attachment)

P.

LeBlond (with attachment)

R. Tamminga (with attachment)

Master File (with attachment)

B604280181 860417 PDR ADOCK 05000304 G

PDR Apg 2 21986 lh 1T o /