. VERMONT YANKEE M
NUCLEAR POWER CORPORATION 185 Old Ferry Road, Brattleboro, VT 05301 7002 (802) 257 5271 February 23,1998 BVY 9814 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 References (a) NRC Generic Letter 96-01, NVY 96-08, dated January 10,1996 (b) Letter, VYNPC to USNRC, BVY 96-51, dated April 18,1996 (c) Letter, VYNPC to USNRC, BVY 97124, dated September 30,1997
Subject:
Response to NRC Generic Letter 96 01, " Testing of Safety Related Logle Circuits" Vermont Yankee Nuclear Power Station License No. DPR 28 (Docket 50 271)
Generic Letter 96-01, Reference (a), requested licensees complete certain actions prior to startup from the first refueling outage commencing one year after the issuance of the letter.
In response to the Generic Letter, Vermont Yankee previously transmitted the following correspondence:
Reference (b) which described a proposed action plan and schedule for completion.
Reference (c) was submitted to provide subsequent !aformation as follows:
e
- 1. ' completion notification for the logic review required by Reference (a),
2.
a revised schedule for implementation of surveillance procedure modifications resulting from the logic review, and 3.
a revisod schedule for the final completion response requested by Reference (a).
This letter provides the confirmation of completion for the surveillance procedure modifications and the final completion response requested by Reference (a). The procedure revisions resulting from the logic review have been comploted and all procedures issued. Testing to satisfy technical specification requirements has been performed.
We trust that this response is satisfactory; however, should you have any questions or desire additional information, please contact ihis office.
Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION
[c (% :
lif
'D Donald A. Reid 9803020057 900253 Senior Vice President, Operations
~
PDR ADOCK 05000271 p
.. _ - - ~.
_ VERMONT YANKEE NUCLEAR POWER CORPORATION i: ? '
Docket No. 50-271 BVY 9814 -
Page 2 of 2 cc:
USNRC Project Manager, VYNPS USNRC Region I, Administrator USNRC Resident inspector, VYNPS VT Department of Public Service
+
1 STATE OF VERMONT )
jos WINDHAM COUNTY )-
Then personnally appeared before me, Donald A. Reid, who, being duly sworn, did state that he is Senior Vice President, Operations, of Vermont Yankee Nuclear Power Corporation, that he is duly authorized to execute and file the foregoing document in the name and on behalf of i
Vermont Yankee Nuclear Power Corporation, and that the statements therein are true to the best of his knowledge and belief.
~-