ML20203F796
ML20203F796 | |
Person / Time | |
---|---|
Issue date: | 04/17/1986 |
From: | Rossi C Office of Nuclear Reactor Regulation |
To: | Rahe E WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
Shared Package | |
ML20203F799 | List: |
References | |
RTR-NUREG-390 NUDOCS 8604280067 | |
Download: ML20203F796 (3) | |
Text
D6cted FM APR 17 N Mr. E. P. Rahe, Jr. , Manager Nuclear Safety Department -
Westinghouse Electric Corporation Post Office Box 355 Pittsburgh, Pennsylvania 15230
Dear Mr. Rahe:
SUBJECT:
ACCEPTANCE FOR REFERENCING OF LICENSING TOPICAL REPORT WCAP-8745(P)/
8746(NP), " DESIGN BASIS FOR THE THERMAL OVERPOWER AND THERMAL OVERTEMPERATURE AT TRIP FUNCTIONS" We have completed our review of the subject topical report submitted by the Westinghouse Electric Corporation (Westinghouse) by letter dated March 31, t 1977. We find the report to be acceptable for referacing in license applications to the extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of the report.
We do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.
In accordance with procedures established in NUREG-0390, it is requested that Westinghouse publish accepted versions of this report, proprietary and non proprietary, within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.
Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, Westinghouse and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.
Sincerely, Charles E. Rossi, Assistant Director for PWR-A Division of PWR Licensing-A
Enclosure:
As stat'iid A
- y. pt _
RSB:j, .PWR-A 5 -A PWR-A:A0 MDupenield: '
J411 son CBe linger C ssi 4M/86 4 86 4 86
{/f/86 7 8604280067 860417 PDR TOPRP EPtVWEST C PDR
APR 171985 .
DISTRIBUTION:
Central File R5B Reading POR DCS H. Thompson W. Minners C. Inomas W. Hodges R. Emch e
I
l
.- c# N UNITED STATES O h NUCLEAR REGULATORY COMMISSION j .j WASHINGTON, D. C. 20s55 y ;
/ APR 171986 Mr. E. P. Rahe, Jr. , Manager Nuclear Safety Department -
Westinghouse Electric Corporation Post Office Box 355 Pittsburgh, Pennsylvania 15230
Dear Mr. Rahe:
SUBJECT:
ACCEPTANCE FOR REFERENCING OF LICENSING TOPICAL REPORT WCAP-8745(P)/
8746(NP), " DESIGN BASIS FOR THE THERMAL OVERPOWER AND THERMAL OVERTEMPERATURE AT TRIP FUNCTIONS" We have completed our review of the subject topical report submitted by the Westinghouse Electric Corporation (Westinghouse) by letter dated March 31, 1977. We find the report to be acceptable for referencing in license applications to the extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of the report.
We do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.
In accordance with procedures established in NUREG-0390, it is requested that Westinghouse publish accepted versions of this report, proprietary and non proprietary, within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.
Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, Westinghouse and/or the applicants referencing the topical report will be expected to revise and I
resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.
Sincerely, d b Charles E. Rossi, Assistan Director for PWR-A Division of PWR Licensing-A
Enclosure:
As stated
- - _ - . - _ . _ _ _ _ _ _