ML20203E987
| ML20203E987 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/09/1998 |
| From: | Imbro E NRC (Affiliation Not Assigned) |
| To: | Bowling M NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20203E993 | List: |
| References | |
| 50-336-97-211, NUDOCS 9802270173 | |
| Download: ML20203E987 (4) | |
See also: IR 05000336/1997211
Text
-
.
.-
.
_
-.
. -.
-.
_ _ _ _ _ . _ _ - ___
_-_ _
p .y\\
UNITED STATES
p:
]
NUCLEAR REGULATORY COMMISSION
WASHINGTON, D.C. Spee6 40M
k ..l...
l
February 9, 1998
Mr. M. L. Bowling, Recovery Officer, Unit 2
c/o Patricia A. Loftus, Director- Regulatory
Affairs for Millstone Station
Northeast Nuclear Energy Company
P.O. Box 128
Waterford, CT 06385
Dear Mr. Bowling:
SUBJECT:
INSPECT;ON REPORT PARSONS POWER INDEPENDENT CORRECTIVE
ACTION VERIFICATION PROGRAM (ICAVP) (NRC INSPECTION REPORT
NO. 50-336/97 211)
,
The Special Projects Office (SPO) of the U.S. Nuclear Regulatory Commission (NRC) initiated
a plan to monitor Parsons Power Group inc. (Parsons) implementation of the Independent
Corrective Action Verification Program (ICAVP) for the duration of the effort. The plan
encompassed the assessment of Parsons' project manual and associated project instructions,
the evaluation of the technical experience of project personnel, scheduled inspections of
implementation activities, and planned and reactive supplemental reviews of ICAVP products
and activities. The SPO conducted inspections of Parson's ICAVP implementation activities
during the periods of August 25-29, September 2 5, and December 15,1997.
l
The results of the inspection were presented to the staff of Parsons and Northeast Nuclear
l
Energy Company (NNECO) during a public exit meeting on December 5,1997. The team
!
found that the implementation of the Parsons ICAVP was in its middle stages. As discussed in
'
the enclosed report, the inspection team identified severalissues that warranted corrective
action. During the inspections the team made several observations regarding the ICAVP
,
'
process and scope. Each observation was discussed with Parsons ICAVP management, and
corrective actions w3re initiated as necessary. Parsons appears t bwe adequately addressed
each issue. Based upon the review of completed and in-process w a products , the team
concluded that Parsons was adequately implementing the NRC approved ICAVP audit plan and
project procedures.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room (PDR).
l
'l
,,,
l
V\\
\\
l
l
9802270173 900209
l
Il
"
ADOCK 05000336
- * * *
- * *
O
_
_
.
--
-.
-
-- .-J
.
.
.
- _ .
-.
Mr. M. L Bowling
2
Sheuld you have any questions concoming the enclosed inspection report, please
at (301) 415-2379 or Ralph Architzel, the Unit 2 team leader at (301) 415-2804.
Sincerely,
?
j
a
d Eugene V. Imbro, De
Director
Specla! Projects Office
Office of Nuclear Reactor Regulation
'
Docket No. 50-336
Enclosure: Inspection Report 50-336/g7 211
cc w/enchsure:
M. H. Brothers, Vice President - Millstone, Unit 3
D. M. Goebel, Vice President, Nuclear Oversight
J. K. Thayer, Recovery Officer, Nuclear Engineering and Support
P. D. Hinnenkamp, Director, Unit Operations
F. C. Rothen, Vice President, Work Services
'
J. Stankiewicz, Training Recovery Manager
R. Johannes, Director - Nuclear Training
L. M. Cuoco, Esquire
J. R. Egan, Esquire
V. Juliano, Waterford Library
J. Buckingham, Department of Public Utility Control
S. B. Comley, We The People
State of Connecticut SLO Designes
D. Katz, Citizens Awareness Network (CAN)
,
R. Bassilakis, CAN
J. M. Block, Esquire, CAN
S. P. Luxton, Citizens Regulatory Commission (CRC)
Representative T. Concannon
E. Woo".acott, Co-Chairman, Nuclear Energy Advisory Council (NEAC)
.
.
I
~
$
_ _ .
. - _ .
- - . - . . - - ~
--
.
. . -
-
Mr. M. L. Bowling
3
Should you have any questions concerning the enclosed inspection report, please contact me at
(301) 415-2379 or Ralph Architzel, the Unit 2 team leader at (301) 415 2804.
,
Sincerely,
l
/s/ S. Reynolds for
Eugene V. Imbro, Deputy Director
Special Projects Office
Office of Nuclear Reactor Regulation
'
Docket No. 50-336
Enclosure: Inspection Report 50-336/97-211
clencl: see next page
.
- Technical Editor reviewed the document on 2/5/98 and comments are included.
'
DOCUMENT NAME: G: ash 2.rpt
'
To recetre e cory of th6s document, Ind6cate in the bom "C" e copy wtthout attach /enci"E" a copy with attach /enci *N" a peo copy
ICAV{
ICAVP/SPO _
'
ICAVP/SPO
0/S
OFFICE
ICAVP/SPO
E
NAME
RMcIntyre
RArchitzel
SReynolds _'4%
Elmbro A.
/7.
o
DATE
2/ 8 /98
2/6 /98
2/ 6/98
2/ $ 198
2/g/98
OFFICIAL RECORD COPY
.
i
.-
._
. . _ -
-
_-.
-
.
.
Distribution w/ encl:
Region i Docket Room (with copy of concurrences)
i
Nucles.r Safety Information Center (NSIC)
PUBL4
-
.
-
FILE CENTER, NRR (with Oriainal concurrences)
NRC Resident inspector
W. Axelson, DRS (Inspection Reports)
B. Jones, PIMB/ DISP
M. Kalamon, SPO, RI
W. Lanning, SPO, RI
D. Screnci, PAO
W. Travers, SPO, NRR
.
'
Distribution w/enet (VIA E MAIL):
R. McIntyre (RPM 1) - SPO, NRR
M. Callahan, OCA
R. Correla, NRR
W, Dean, OEDO
E. Imbro, SPO, NRR
,
P. McKee, SPO, NRR
S. Reynolds, SPO, NRR
P, Narbut, SPO, NRR
R. Architzel, SPO, NRR
H. Eichenholz, SPO, RI
D. Serenci, PAO -
Inspection Program Branch (IPAS)
DOCDESK (Inspection Reports Only)
Distribution w/ encl:
L J. Callan, EDO
S. Collins, NRR
D. Coe, NRR
DCD (OWFN P137)(Dist. Code #lE10)
S. Richards, NRR/ DORS /EAB
T. Martin, AEOD
g ()O'1
.
-'
.
e