r p Rico g*
4 UNITED STATES g
j NUCLEAR REGULATORY COMMISSION C
WASHINGTON, D.C. 205S4001
- ,o February 12, 1999 MEMORANDUM TO: Francis M. Akstulewicz, Acting Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
Stewart L. Magruder, Project Manager M 'T A Generic issues and Environmental Projects Branch
(
Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF JANUARY 20,1999, MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) REGARDING DESIGN BASIS INFORMATION On January 20,1999, representatives of the Nuclear Energy Institute (NEI) met with representatives of the Nuclear Regulatory Commission (NRC) at the NRC's offices in Rockville, Maryland. The purpose of the meeting was to discuss a letter from the NRC to NEl dated January 4,1999, that forwarded draft criteria for determining design basis information as defined in 10 CFR 50.2. Attachment 1 provides a list of meeting attendees.
The representatives from NEl opened the meeting by stating that the draft criteria should be helpfulin reaching a common understanding of what constitutes design basis information. They noted that the industry believes that reaching agreement with the staff on this issue is important because the proposed revisions to the NRC reactor oversight process acknowledge that design/
issues are difficult to assess and added emphasis on inspection will be required. In addition, a clear understanding of design basis information is important to the discussion of the content of
/
updated final safety analysis reports, the proposed revisions to 10 CFR 50.59, and license renewal.
O The group next discussed the draft general guidance provided in the letter. The NEl representatives stated that they thought that the industry would support this general guidance.
They noted that the industry design basis task force is scheduled to meet in mid-February and that task force members had been provided copies of the NRC draft criteria and would be prepared to provide specific comments then.
9902170331 990212 PDR REVGP ERGNUM C rr e 1700W gggg e n Mii n
4
F. Akstulewicz February 12, 1999 The draft spec:fic guicance was discussed next. The NEl representatives stated that some of the specific guidance was consistent with their thoughts but some of it was too detailed. The group then had a lengthy discussion of the level of detail required for design basis information as defined in 10 CFR 50.2. No consensus was reached, however, it was agreed that the NRC staff would attend a portion of the industry design basis task force meeting on February 18, 1999, to continue discussion on this issue.
Project No. 689 Attachments: As stated cc w/att: See next page l
4
l l
F. Akstulewicz February 12, 1999 The draft specific guidance was discussed next. The NEl representatives stated that some of the specific guidance was consistent with their thoughts but some of it was too detailed. The group then had a lengthy discussion of the level of detail required for design basis infoimation i
as defined in 10 CFR 50.2. No consensus was reached, however, it was agreed that the NRC staff would attend a portion of the industry design basis task force meeting on February 18, 1999, to continue discussion on this issue.
Project No. 689 Attachments: As stated cc w/att: See next page DISTRIBUTION: See attached page Document Name: g:\\SLM1\\msum0120.wpc OFFICE PM:PGEB (A)BC:Pfgh -
NAME SMagrudeddw" FAksMhicz DATE 2/\\9/99 2/ JW99 i
t I
NRC/NEl MEETING ON DESIGN BASIS LIST OF ATTENDEES January 20,1995 NAME ORGANIZATION Tony Pietrangelo NEl Russ Bell NEl Scott Newberry NRC/NRR Bob Dennig NRC/NRR l
Frank Akstulewicz NRC/NRR Eileen McKenna NRC/NRR Tom Bergman NRC/NRR Stewart Magruder NRC/NRR John Tappert NRC/NRR Nancy Chapman SERCH/Bechtel Larisa Helfer Winston & Strawn Chris Smith NUS-IS l
Nuclear Energy Institute Project No. 689 cc:
Mr. Ralph Beedle Ms. Lynnette Hendricks, Director Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy Institute Nuclear Energy institute Suite 400 Suite 400 1776 i Street, NW 1776 I Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, Director Programs Washington Operations Nuclear Energy Institute ABB-Combustion Engineering, Inc.
i Suite 400 12300 Twinbrook Parkway, Suite 330 4
1776 i Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 i
4 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3709 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute Suite 400 1776 l Street, NW Washington, DC 20006-3708
.l Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Activities Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director
. Operations Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708
e-Distribution: Mtg. Summary w/ NEl Re Design Basis Dated February 12, 1999 Hard Cooy Central Files PUBLIC PGEB R/F OGC AGRS SMagruder EMail SCollins/RZimmerman BSheron BBoger WKane DMatthews SNewberry FAkstuiewicz RDennig EMcKenna TBergman JTappert GTracy, EDO l