ML20203E390
| ML20203E390 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 02/20/1998 |
| From: | Ruland W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Feigenbaum T NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| Shared Package | |
| ML20203E395 | List: |
| References | |
| 50-443-97-09, 50-443-97-9, EA-98-097, EA-98-97, NUDOCS 9802270038 | |
| Download: ML20203E390 (4) | |
See also: IR 05000443/1997009
Text
.
-
-.-
.-
. -- - . - - - - -_ - --
--
-
- -
- .
- - _ . .
1
- -
.
.
February 20, 1998
EA #90 097
Mr. Ted C. Feigenbaum
Executive Vice President and Chief Nuclear Officer
Seabrook Station
North Atlantic Energy Service Corporation
i
c/o Mr. Terry L. Harpster
P.O. Box 300
-
Seabrook, NH 03874
SUBJECT:
NRC INSPECTION REPORT NO. 50-443/97 09, NOTICE OF VIOLATION
Dear Mr. Feigenbaum:
'
On January 21,1998, the NRC completed an inspection of the adequacy of the measuring
and test equipment (M&TE) calibration program at Seabrook Station. The enclosed report
presents the results of that inspection.
i
s
The inspection found that the M&TE calibration program at Seabrook Station was
acceptable with the exception of two violations. The first violation involved your revision
'
of procedure MA 2.3, " Control and Calibration of Measuring and Test Equipment," without
,
performing a 10 CFR 50.59 evaluation. The second violation involved a failure to control,
' -
calibrate, and adjust certain M&TE at specified periods tn maintain accuracy within
necessary limits.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice of Violation (Notice) when preparing your response in your response, you
'
should document the specific actions taken and any additional actions you plan to prevent
recurrence. Your response may reference or include previous docketed correspondence, in
the correspondence adequately addresses the required response. After reviewing your
'
response to the Notice, including your proposed corrective actions and the results of
'
- future inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
Also, the inspector found that you had not completed your review of the overall impact of
revised M&TE accuracies. Please include your expected completion date for this review in
- your response to the above Notice.
r
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room (PDR). To the extent
possible, your response should not include any personal privacy, proprietary, or safeguards
information so that it can be placed in the PDR without redaction.
/
/
/ HOI
9802270038 980220
ADOCK 05000443
s()lll!@yll;
'
,
.
.
,
.- _ _ _ ~ . . -.__.._._._ _._ _ ._____ _ _ .. _ . _ . ___. _ __....__ _ _ _ _ _
,
e
.
Mr. Ted C. Feigenbaum
2
Thank you for your cooperation. Please call me at (610) 337 5376if you have any
questions.
Sincerely,
ORIGINAL SIGNED BY:
..
William H. Rutand, Chief -
Electrical Engineering Branch
1
Division of Reactor Safety
0
Docket No. 50-443
,
Enclosures:
1. NRC Inspection Report 50-443/97-09
2. M&TE Change Management Plan from Licensee
cc w/encis:
B. D. Kenyon, President - Nuclear Group
D. M. Goebel, Vice President - Nuclear OversigM
.
W. A. DiProfio, Station Director Seabrook Station
R. E. Hickok, Nuclear Training Manager - Seabrook Station
L. M. Cuoco, Senior Nuclear Counsel
W. Fogg, Director, New Hampshire Office of Emergency Management
D. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass
'
R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire-
D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency
Management Agency
F. W. Getman, Jr., Vice President and General Counsel- Great Bay Power
Corporation
R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts
-
Feacoast Anti-Pollution League
O. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
S. Comley, Executive Director, We the People of the United States
l
-
_ -
--
- - . . - . - . - _ .
_ - - .
. - - -
. _ __
. . . - .
.
.
.
'
Mr. Ted C. Felgenbaum
3
- Distribution w/encI:
Region i Docket Room (with concurrences)
PUBLIC
Nuclear Safety information Center (NSIC)
NRC Resident inspector
'
H. Miller, RA/W. Axelson, DRA
C. Cowgill, DRP
R. Summers, DRP
C. O'Daniell, DRP
K. Young, DRS
W. Ruland, DRS
,
DRS File
Distribution w/enci (VIA E MAIL):
'
B. McCabe, OEDO
i
R. Correia, NRR (RPC)
F. Talbot, NRR
D. Screnci, PAO, ORA
Inspection Program Branch, NRR (IPAS)
DOCDESK
.
1
'
DOCUMENT NAME: A:\\ SEA 9709. INS
pk
'
. To reedve a copy of this document. Indicate in the box: "C'=
it
tachment/ enclosure
- E* * Copy with attachment / enclosure
- N"=
g
No copy
.
OFFICE
DRS/RI
DRP/RI gL 4 l
DRS/RI
l
l
NAME
KYoung
py
CCowgN!'
WRutand
'
DATE
02/12/98
02()/98
02/ /98
02/ /98
02/ /98
'
OFFICIAL RECORD COPY
ffd
-
. - -
. -
_
. - - . - _ _ _
. .-
.
.-.
-
..
.- - -
-
- ____
_-
.
4
Mr. Ted C. Felgenbaum
3
Distribution w/ encl:
Region i Docket Room (with concurrences)
PUBLIC
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
H. Miller, RA/W. Ax6l son, DRA
C. Cowgill, DRP
R. Summers, DRP
C. O'Daniell, DRP
K. Young,DRS
W. Ruland, DRS
DRS File
Distribution w/enci (VIA E-MAIL):
B. McCabe, OEDO
R. Correia, NRR (RPC)
F. Talbot, NRR
D. Screnci, PAO, ORA
Inspection Program Branch, NRR (IPAS)
R. Zimmerman, ADPR, NRR
F. Davis, OGC
A. Nicosia, OGC
J. Lieberman, OE (OEMAIL)
D. Holody, EO, RI
,
T. Walker, Rl
DOCDESK
DOCUMENT NAME: A:\\ SEA 9709. INS
Ts recolve a copy of this document. Indcate in the box: 'C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
- N'=
No c py
l OFFICE
DRS/RI
l
DRP/RI
DRS/RI
l6
l
lNAME
'KYoung-
- CCowgill
WRuland/jfgf
lDATE
O2/20/98
02/ /98
02f6/98 - ' 'T
'
02/ /98
02/ /98
OFFICIAL RECORD COPY
'See Previous Concurrence Page