ML20203E164

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to PECO-COLR-P2C12, COLR for Pbaps,Unit 2, Reload 11,Cycle 12. COLR Submitted to NRC in Accordance W/ Pbaps,Unit 2 Tech Specs Section 5.6.5.d
ML20203E164
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 02/13/1998
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20203E168 List:
References
NUDOCS 9802260273
Download: ML20203E164 (1)


Text

i

  • t s

a

,. A TS 5.6.5.d

=sy:y

".EECO NUCLEAR iiw i ~ c~~

as ce#wtm+ tuu+ s A Unit of PECO Energy wve 8* 19:*7 %9$

1 February 13,1998 i

l Docket No. 50 277 License No. DPR 44 U.S. Nuciaar Regulatory Commissio, Attention: Document Control Desk Washington DC 20555

Subject:

Peach Bottom Atomic Power Station, Unit 2 Issuance of the Core Operating Limits Report for Reicsd 11 Cycle 12, Revision 3

Dear NRC Officials:

Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atom'c Power Station (PBAPS), Unit 3, Reload 11, Cycle 12 (Revision 3), Revision 3 of this reart incorporates an additional reference to a MAPLHGR document and corrects typograph cal errors in the COLR text associated with the fe'Jres.

This COLR is being submitted to the 14RC in accordance with PBAPS, Unit 2 Technical Specircations (TS) Section 5.6.5.d.

If you have any questions, please do not hesitate to contact us.

Very truly yours, j

]

Director Licensing Enclosure Sj dM cc:

H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure)

A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) 986226027'3 90021'3 ADOCK 050002 7 llll lllll-l lll hDR

_. _..