F l-VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT
)
l REPORT NO. 86-01 APPROVED BY:
ggy STATION AIANAGER AD K
J h
m-o 1
Section Page Operating Data Report - Unit No. I 1
Operating Data Report - Unit No. 2 2
Unit Shutdowns and Power Reductions - Unit No.1 3-4 Unit Shutdowns and Power Reductions - Unit No. 2 5
Load Reductions Due to Environmental Restrictions - Unit No.1 6
Load Reductions Due to Environmental Restrictions - Unit No. 2 7
Average Daily Unit Power Level-Unit No.1 8
Average Daily Unit Power Level-Unit No. 2 8
Summary of Operating Experience 9 - 10 Facility Changes Requiring NRC Approval 11 Facility Changes That Did Not Require NRC Approval 11 Tests and Experiments Requiring NRC Approval 12 Tests and Experiments That Did Not Require NRC Approval 12 Other Changes, Tests and Experiments 13 Chemistry Report 14 Description of AllInstances Where Thermal Discharge Limits Were Exceeded 15 Fuel Handling 16 - 17 Procedure Revisions That Changed the Operating Mode Described in the FSAR 18 Description of Periodic Tests Which Were Not Completed Within the Time Limits Specified in Technical Specifications 19 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit No.1 - Mechanical Maintenance 20 - 28 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit No.1 - Electrical Maintenance 20 -28 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit No.1 -Instrument Maintenance 20 - 28
11 Section Page Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit No. 2 - Mechanical Maintenance 28 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit No. 2 - Electrical Maintenance 28 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit No. 2 -Instrument Maintenance 28
gpg 49 Page 1 of 28 AC ACW.ENT 5 Page 1 of 3 OPERATING DATA REPORT FEB C 2 584 DOOKET NO. 50-280 DATE n ?-n s-8 6 COMPLETED BY V.Tnnes
" r* HONE f R041357-318 OPERATING STATUS 1.
Unit Name:
Unit #1 (Surrv)
Notes 2.
Reporting Period:
01-01-86 to 01-31-86 3.
Licensed Thermal Power (MWt):
2441 4
Nameplate Rating (Gross MWe):
R4 7_ s 5.
Design Electrical Rating (Net MWe):
788 6.
Maximum Dependable Capacity (Gross MWe): 820 7.
Maximum Dependable Capacity (Net MWe):
781 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Rastricted, If Any (Net MWe):
- 10. Reasons For Rastrictions, If Any:
This Month Tr.-to-Date Cummulative
- 11. Eours In Reporting Period 744.0 744.0 114936.0 12.
Number of Bours Reactor Was Critical 543.1 543.1 72855.2
- 13. Reactor Reserve Shutdown Hours 0-0 3774.5 14.
Hours Generator On-Line 520.7 520.7 71359.2
- 15. Unit Reserve Shutdown Hours 0
0 3736.2 16.
Gross Thermal Energy Generated (MWE) 1174444.7 1174444.7 165057067.4
- 17. Gross Electrical Enargy Generated (MWE) 383080.0 383080.0 53155013.0
- 18. Not Electrical Energy Generated (MWE) 362604.0 _
362604.0 5.0395947.0 19.
Unit Service Factor 70.0%
70.0%
62.1 %
20.
Unit Available Factor 70,n' 7 0. 0*z 65.3 %
.21.
Unit Capacity Factor (Using MDC Nat) 62.4 %
62.4 %
56.8 %
22.
Unit Capacity Factor (Using DER Net) 61.8 %
61.f, %
55.6 %
23.
Unit Forced Rate 8.0%
8.0%_
18.8%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelin g 09 48 days 25.
If Shut Down At End Of Report Period Estimated Date of Startup: 02-05-86 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIld, ELECTRICITY COMMERCIAL OPERATION (8/77)
i:.~ -- ?
Page 2 of 28
,,-,, x ----
~
? age. cf 3 OPEFJ.!!NG DATA F.T. PORT U C2 DOCKE~ NO. 50-281 DATE 02-05-86 COXFLE*ID BY v..Tnnes F " HONE IRnd1357-318 0?IRATING STA~US 1.
Unit Name:
Unit #2 (Surrv)
Notes 2.
Reporting Period:
01-01-86 to 01-31-86 3.
Licensed Therr.al Power (Et): 2441 4
Naneplate Rating (Gross W e): 847.5 5.
Design Electrical Rating (Net W e): 788 1
6.
Maximum Dependable Capacity (Gross MWe): 811 7.
Maximum Dependable Capacity (Net MWe):
775 l
S.
If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This rienth Tr.-to-Date
.Cummulative 11.
Ecurs in Reporting Period 744.0 744.0 111816.0 12.
Number of Hours Reactor Was Critical 744.0 744.0 72686.7 13.
Reactor Reserve Shutdown Hours 0-0 328.1 14.
Ecurs Generator On-Line 744.0 744.n 715n9.4
~
15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (WH) 1814339.6 1814339.6 167121370.2 17.
Gross Riectrical Energy Generated (MWE) 597260.0 597260.0 54185564.0 i
18.
Net Electrical Enargy Generated (MWE) 567880.0 567880.0 51354463.0 19.
Unit Service Factor 100.05 100.0 g 64.0 $
l 20.
Unit Available Factor 100.0 %
100.0 %
64.0 %
.21.
Unit Capacity Factor (Using MDC Net) 98.5 %
98.5 %
59.0 %
22.
Unit Capacity Factor (Using DER Net) 96.9%
96.9 %
58.3 %
23.
Unit Forced Rate 0
0 13.4 %
1 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of I.ach):
Rnnhhnr inannctinn - n2-2R-RR - 10 dnvc 25.
If Shut Dosn At End Of Report Period Esti=ated Date of Startup:
26.
Units in ~est Status (Prior to Conmercial Operation):
Forecast Achieved i
IMITIAL CRITICALITY l
INITIAL ELICTRICITY COMMERCIAL OPERATION Lo M
DOCKET NO.
50-280 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Unit #1 DATE 02-05-86 g,
COMPLETED BY Tnnac REPORT MONTig January - 1986 w.
E E
jE 3
j E5 Licensee Eg Eq Cause & Corrective E
Action to W.
Date i
5g i
2sE Event g?
y5 5
jgg Report 87 mo Eu Prevent Recurrence H
g d
86-03 01-24-86 F
4.8 A
2 86-005 Turbine rampdown and subsequent 86-006 manual reactor trip due to fire in "C" phase bus duct caused by ground straps arcing.
Repaired ground straps.
86-04 01-24-86 S
177.8 B
4 Commenced cooldown for planned outage originally scheduled for 2-14-86.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event ReporI (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G Operational Error (Explain)
Eshibit I - Same Source
(*8/77) llother (Explaml
i N
l 50-281 DOCKETNO.
UNIT SIlUII) OWNS AND POWER REDUCTIONS UNil NAML Unit #2 O
DAIE 02-0 5-8 B COMPLET ED itY
- v..Innsic REPOR T MONIll Januarv - 1986 1EllrilONE (804) 357-3184 yg "s
) E.;
E Ceuse & Conective 1.itensee
,g 3g 4
.2 s 5 Event gy pO Attiun to W.,
Date r-Psevent Recurrence yE 3 gg c Repost #
to O H
ou e
o i
86-01 01-02-86 F
0.0 A
4 86-001 Turbine runback, channelI, caused by 86-002 loss of power to vital bus I, Initiating cause was loss of "E" transfer bus. Turbine at 350 MW's, with reactor at 100 % power with steam dumps controlling temperature.
l No rod movement due to urgent failure in logic cabinet.
Repaired 252 breaker which is the feeder to "E" transfer bus.
l 1
t 3
4 i
2 Method:
E mhibii G - Inst ructions F: Forced Reason:
l Manual for Pseparation ul paia S. Scheduled A.I.quipment Failure (Explain)
B. Maintenance of Test 2-Manual Sciam.
1.niry Shecis for 1.icensee 3 Automatic Scram.
Event Repuis (LER)l'ile (NtlHl.G-C Itefacimg D Regulatoey Hesisection 4 Oihes (Emplaini 01611 E-Operatur Tsaining & License Examination 5
F-Adnumstr ative Esinini I S.ime Source G Operational 1.rror (Explain) ps/17 )
II.Ot he r (li splJm)
~
L s
9
Pagn 6 of 28 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 1 MONTH:
January - 1986 i
DATE TIME HOURS LOAD, MW REDUCTIONS, MW MWH REASON NONE DURING THIS REPORTING PERIOD.
i e
1 4
MONTHLY TOTAL
m
'Paga 7 of 28 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 2 MONTH: January - 1986 i
DATE TIME HOURS LOAD, MW REDUCTIONS, MW MWH REASON NONE DUR:NG THIS REPORTIN G PERIOD,
l I'1 I
i a
I I
MONTHLY TOTAL 6_
I Wept 0 avFgabF DAILv UNII POaE R L E vF L SuRkv power STATION PN0bpAP NOS12681 02/P)/86 14.35.41 REPORilNG MONTH -
JANUARY 1990 00CAFI NO.
5*-2d*
00LMtf AG. 50-481 DATE FEekUARf 3,
1v86 C OM PL E T E D e r
- v. JONES uN 1 i O Pt E ON 1 i T w0 AWEdaGC OAILY PUwER LE%EL avEHA6F DAILY P0mED LEVEL DAV
-MwE-NFT-
-Mai-NFT-1 740.4 767.5 4
737.9 7*2.3 3
F39.9 70%.3 4
742.4 705.6 5
744 0 765."
6 741 0 704.3 7
649.5 762.2 e
138.7 757.9 9
709.9 762."
10 736 0 762.8 11 T43 1 765."
(
12 T40 5 765.1 15 F40.4 764 3 14 738.7 762.4 15 F39.7 7o5.3 le 739.0 766.P 17 739 1 766.5 Is T39 2 765.9 19 394 8 76F.3 20 70 4 703.1 21 346 3 703.1 24 130 4 763.1
?3 740.8 7o9.5 2*
220.0 758*.9 25 00 762.3 20 00 762.2 27 03 701.5 26 00 707.7 29 00 768.2 30 00 763.3 l
11 0.0 763.n
+e m$
cD
~
llD
l l
SUMMARY
OF OPERATDiG EXPERIENCE Pagn 9 of 28 MONTH / YEAR January - 1986 Listed below in chrono 4gical sequence by unit is a summary of operating experiences for this month which I tuired load reductions ar resulted in significant non-load related incidents.
UNIT ONE 01-01-86 0000 This reporting period begins with the unit at 97 % power, 780 MW's.
01-07-86 2104 Reactor trip. Initiating signal was "A" S/G low level with a feed flow / steam flow mismatched. Cause was loss of instrument air.
01-08-86 0514 Reactor critical.
1420 Generator on the line, increasing power at 50 MW's/hr.
01-09-86 0541 Holding power at 97%, 780 MW's due to the "A" drains cooler being passed.
01-19-86 1240 Dropped rod. Turbine runback.
1250 Started rampdown at 150 MW/hr, reactor at 60% power, 510 MW's.
1256 Manually tripped reactor, due to inoperable rod control coincident with 4 dropped rods.
2251 Reactor critical.
01-20-86 1226 Generator on the line.
1300 Holding power at 30 %,160 MW's for chemistry.
01-21-86 0423 Commenced powerilncrease at 3%/hr.
01-22-86 0500 Holding power at 97 %,780 MW's.
01-24-86 0435 Commenced power reduction at 150 MW's/hr. due to arcing of phase bus duct by "C" main transformer.
0745 Holding power at 300 MW,42 % reactor power.
r 4 0925 Manually tripped reactor to preclude potential main generator damage.
,a 1410 Commenced plant cooldown, commencing planned outage
)
originally scheduled for 02-15-86, 2035 RCS < 3500F,450 psig.
SUMMARY
OF OPERATING EXPERIENCE Page 10 of 28 MONTH / YEAR January - 1986 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
IfNIT ONE [ continued]
01-25-86 0905 RCS < 2000F.
01-27-86 1215 RCS drained to mid-nozzle.
01-31-86 2400 This reporting period ends with the unit at CSD on RHR for snubber outage.
UNIT TWO 01-01-86 0000 This reporting period begins with the unit at 100 % power, 805 MW's.
01-02-86 1458 NIS turbine runback, channel I, caused by loss of power to V B-I.
Initiating cause was loss of "E" transfer bus. Turbine at 350 MW's reactor at 100 % power with steam dumps control-ling temperature. Rods did not move in due to an urgent failure on the logics cabinet.
1520 Plant stabilized at 88 % power, 700 MW's.
Steam dumps closed, rod control returned to service.
1950 Commenced powerincrease at 150 MW/hr.
2055 Unit at 100% power,805 MW's.
01-31-86 2400 This reporting period ends with the unit at 100 % power, 805 MW's.
i l
FACILITY CHANGES REQUIRING Page 11 of 28 NRC APPROVAL MONTH / YEAR January - 1986 NONE DURING THIS REPORTING PERIOD.
FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL
~
DC 85-14 Fuel Assembly 162 This design changes allows the once burned assemblies containing failed fuel rods to be reused without raising the core coolant activities. 'The failed rods were removed from the assembly and replaced by solid zircaloy dummy rods.
Summary of Safety Analysis The reconstituted fuel assemblies meet essentially the same design requirements, satisfy the same design criteria as the original fuel assembly. Also, use of the assemblies will not result in a change to existing safety criteria and design limits.
DC 81-06 Electrical Penetration Replacement 2
This design change replaces Amphenol spare containment penetrations with Conax pene-trations. This provides the new penetrations with pigtails on the feed-throughs long enough to permit splicing to the corresponding calbe in the cable trays.
Summary of Safety Analysis This modification has no effect on the proposed change on station operation and the operation of safety-related equipment.
m.
m
TES'IS AND EXPERIMENTS REQUIRING NRC APPROVAL l
MONTH / YEAR JANU ARY - 1986 NONE DURING TIIIS REPORTING PERIOD.
l TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL l
l NONE DURING THIS REPORTING PERIOD.
l 1
l l
l l
1 l
)
Page 13 of 28 OTHER CHANGES, TESTS AND EXPERIMENTS MONTH / YEAR JANUARY - 1986 NONE DURING THIS REPORTING PERIOD, D
s-
v PG' 28-06
- N M'E Page 14 of 28 SURRY POWER STATIO!
CHEMIS"'RY PZPORP January 19 86 LiIT NO. 1 UNIT NO. 2 ANALYSIS MAXIM.E MDIIFE AVERIGE MAXD2 MINDE AVERAGE Gross Radioact., uCi/ml 1.56E+0 1.19E-1 9.38E-1 1.78E-1 6.30E-2 1.06E-1 Suscended Solids, pczn 0.0 0.0 0.0 0.0 0.0 0.0 Gross Tritiun, uCi/ml 1.84E-1 6.26E-2 1.08E-1 2.17E-1 1.51E-1 1.84E-1 131 Icdine
, uCi/:nl 1.7 0 2.35E-3 4.11E-1 5.59E-4 6.04E-5 1.84E-4 131 131 I
/I 0.44 0.18 0.30 0.35 0.07 0.14 (2)
Hydrocen, cc/kg 39.0 4.9 21.6 35.9 25.2 29.3 Lithiun, c:rn 0.86 0.46 0.62 1.25 1.01 1.11 Boron-10, can*
250 34 77 138 112 119 0xY en, (D.O. ), can 6-0.005
@.005 40.005 6 0.005 6 0.005
- 0.005 Chloride, ocen 40.01 40.01 g0.01 6 0.01 6.0.01
- 0.01 oH @ 25'C 6.95 5.74 6.55 6.56 6.33 6.44
- Baron-10 = Total Boron x 0.196 RD 7.RKS: (1) Due to unit trip, 01-07-86 (2) Depressurized RCS for snubber outage, 01-24-86 LiOH additions: U-1 01-08-86: @l145 300g; 02245 275g - due to unit trip U-1 01-20-86: 90940 324gr
@l900 210g - due to unit trip U-1 01-21-86: @l540 320g U-2 01-13-86: 01355 180g - low in band U-2 01-19-86: @0550 350g - low in band (5% ranp)
CAT Bed not placed in service on either unit in January 1
3 I
DESCRIPTION OF ALL INSTANCES WHERE Page 15 of 28 THERMAL DISCHARGE LIMITS WERE EXCEEDED MONTfi/ YEAR J ANU ARY - 1986 NONE DURING T111S REPORTING PERIOD.
m j
i 1
l I
1 i
i T
i
m
~,
FUEL HANDLING Page 16 of 28 UNIT #
1 MONTH / YEAR J ANU ARY - 1986 DATE NO. OF ANSI NO.
NEW OR SPENT FUEL
-3 HIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL NONE DURING THIS REPORTING PERIC D.
l t
l
v FUEL HANDZXNG Page 17 of 28 UNIT #
2 MONTH / YEAR JANU ARY - 1986 DATE NO. OF ANSI NO.
NEW OR SPENT FUEL HIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL NONE DURING THIS REPORTING PERIOl l.
l l
i l
I i
W
~
m
\\
Page 18 of 28 i
PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR MONTH / YEAR JANUARY - 1986 NONE DURING THIS REPORTING PERIOD.
O Z
I
u Page 19 of 28 DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH / YEAR JANU ARY - 1986 NONE DURING THIS REPORTING PERIOD.
L e
1 e
l l
1
m Page 20 of 28 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 1 MONTH / YEAR January - 1986 The below listed codes denotes the following departments:
0228 or R03 Mechanical 0229 or R04 Electrical 0237 or T22
- Instruments l
1 l
v
+
Pags 21 of 28 TCO
' SeVETr FILATED I(RING REDUCED FUWER SORTED BY LNIT AND IiFARThENT FROC4AM WPTOHt60 02/04/04 9:47 PAGE FR0n 01/08/06 1MU 01/08/86 UNIT 01 SURRY RETURED TO WO EPT SERVICE MARK MJMIER NUMBER WO TlILE HISTORY
SUMMARY
)229 01/08/86 01-MS -MISC-NA 029068 FiftACE N2 BOTTLE FOR 9N-hS-1 INSTALLED N2 BOTTLE 02A E b
>237 01/09/06 01-CS -LI -100C 029072 READS 1% LUWER THAN CHMNEL I ADJUSTED INDICATOR FOR FfitFER c 11 INDICATION. OP SAT FT SENT TO ENG
)237 01/09/06 01-RC -LC -1475 029058 OUTFUT 10F LC-1-475 COMPARATOR REFLACED TE ERRATIC DUAL COMPARATO TRIPPING ERRATIC R INSTALLED ANOTER OE. CHECKED THE CALIIRATION USING 1-PT-2.5A (L-1-475) OPERATION CECKS SAT.
PT SENT TO ENGIEERING
)237 01/06/86 01-RPI-CB -F-12 02Y187 IkIFTING FLACED IOMMY BISTAKE IN F-12 AT OFS FE0 VEST PT 5ENT TO ENGINEERING
(
4
Pags 22 of 28 FEO.
- SAFETf RELATED DURING FEDUCED KNER SORTED Bf UNIT MD IEFARTMENT FROCAM LFT09960 02/04/96 9:57 FAGE FROM 01/19/86 Tmu 01/21/96 LNIT 01 SURRY RETURNED TO WO EPT SERVICE MARK NUNIER HUMIER WO TI1LE HISTORY
SUMMARY
228 01/20/86 01-FH -CRN -15 024494 REFtACE AUX HUUh CABLE: REBUILD CABLE FEFLACED AND WOR %ING FROFERtY SHEAVE BLOCK C NOT HOOK 228 01/20/06 01-FW f
-2 029554 CHANGE N2 BOTTLE REMOVED EMPTY BOTTLE, INSTALLED NEW BOTTLE 2100 PSI, CEChED FITTING S FOR LEAKS. TEST SAT.
229 01/21/86 01-CH -e0V -1275A 01V575 GREASE MOV AND REFLACE AS OVEFtMULED LIMITOR90E IAW FROCEDURE PER MOVATS N<'
IN 229 01/21/86 01-CS -h0V -101A 029453 LIMITOROUE N0 TOR BOLT IS MISSIN0 INSTALLED BOLT ON 1-CS-MnV-101A INSTALL BOLT C M 1/21/86 s
r 9
m Pags 23 of 28 PCO
- SAFETY RELATED IGING REDUCED POWER SORTED BY UNIT AND DiFMTMENF FROGRAM IJT09S60 02/04/86 10:06 FAGE FROM 01/24/86 THRU 01/31/66 UNIT 01 SURRY RETURNED TO WO EPT SERVICE MARK NUMBER NUNIER WO TITLE HISTORY
SUMMARY
228 01/27/06 01-CS -MOV -102B 029728 REFLACE 5 STUDS WHICH ARE 1/27/86 REFtACED STUDS IN NUMERIAL SEQUENCE AND TOROUED TO 150 FT LBS MARKED WITH YELLOW WITH B-7 AFTER ALL 8 STUDS WERE PEFtACED MATERIAL AND TOR 00ED. FINAL TORGUE TO 150 FT
/LBS IN NUNFRICAL ORIER WAS MAIE 1228 01/27/96 01-hS -
-7 020192 PACKING GLAND LEAK FOUND GLAND FOLLOWER BOTTOMED OUT.
FEh0VED BONNET FROM VALVE BODY TO ALLOW REMOVAL OF PACKING. REMOVED 4 RINGS OF OLD PACKING.ALOS FOUND HAN!GEEL BUSHING LOOSE IN YOKE 228 01/27/86 01-SHP-HSS -26 029723 REPOSITION SLEEVES TO FROPER 4" V-0503 INSTALLED WASHER ON BOTH POSITION PIFE AND STRUCTURE SIDE OF SNUBBER OUTSIIE CLEVIS AND REPOSITIONED CLEVIS PIN.
>228 01/29/86 01-SI -h0V -1864A 029798 CHANGE ALL 18 STUDS WITH REMOVED OLD STUDS AND INSTALLED CARBON STEEL STUOS NEW B-7 STUDS ONE AT A TIE.
TOROUED TO SPECS AS PER FROCEImE SOC-1470 3/4" TOROUE WRENCH 228 01/29/E6 01-SI -MOV -1890A 029175 REFtACE BONNET STUDS (ONE AT A REMOVED OLD BOLTING MATrRIAL AND TIME] WITH B7 MATERIAL.
ONE STUD AT A TIE AND RLMACED WITH NEW BOLTING MATERIAL.Kl. OLD BOLTING MATERIAL IS IN TE BArM1.
OH 27' LEVEL OF VALVE PIT IN YELiOW 228 01/29/86 01-SI -NOV -1890C 029174 FiFLACE BONNET STUDS (ONE AT A EDGED OLD BOLTING ONE STUD AT A TIME] WITH B7 MATERIAL TIE AND REFtACED WITH EW RTING MATERIAL.N_L OLD BOLTING MATERIAL IS IN TE BARREL ON 27' LEVEL OF VALVE PIT IN PURFtE BAGS.
>228 01/30/86 01-CH -FNG -78 029531 FLANGE LEAKING REMOVED OLD GASKET. INSTALLED EW GASKET. TRANSFERRED TO INST SHOP ON WO 9029966
>228 01/30/86 01-CH -HCV -1200A 022766 REPACK TIGHTENED PACKING GLAND NUTS ON 1-CH-HCV-1200A
>228 01/30/86 01-CS -
-8 027539 VALVE BINDING-DIFFICULT TO DISASSEMRED VALVE FOUND GREASE THA OPERATE T HAD GOTTON HARD OVER YEARS CLEANE D REASSEMBLED INSTALLED VALVE WITH NEW B/ BONNET GASKET. BLUE SEAT ON GATE 100% OVERHAUL AS FER FROCEDURE
.]
v Page 24 of 28 PCO
' SAFETY RELATED DURING FIDUCED POWER SORTED BY UNIT AND DEPARTMENT PROGFM WPT09560 02/04/96 10:06 FAGE FROM 01/24/86 Tmu 01/31/86 UNIT 01 SURRY RETURNED TO WO EPT SERVICE MARK NUMBER NUMER WU TIfLE HISTORY
SUMMARY
e
.228 01/30/96 01-SI -
-46A 029776 CHANGEOUT 9 0F THE 20 S.S.
FEFLACED ALL STUDS AND NUTS. 20 STUDS 40 NUTS IAW MMP-C-G-001 2 1
-228 01/30/86 01-SI -fCV -1898 006053 AIR LEAK UN DIAPHRAGM REN)VED OLD DIAPHRAGi AND INSTALLED NEW ONE CLEANED AFIA 228 01/31/06 01-BS -CRN -5 029782 PM - ON DEMAND FERFORMED PM IAW PROCEIORE 228 01/31/06 01-CC -HSS -341 029726 FILL FiSER90lR TO 90%
FILLED RESERVOIR TO 90% LEVEL l
FOUND 9 60% TIGHTENED VENT PLUG 2 1/2" V-0400 a228 '01/31/86 01-CH -HSS -301 029722 FILL FiSERNOIR VERIFY V-4410 1 1/2" FILLED RESER90 IR WITH FLUID. MILLER CYLINDER 90% FULL
'228 01/31/86 01-FW -h0V -151D 030010 PM - ON IEMAND AS FOUND: GREASE IN LIMITORutE HARD. REMOVED OLD GREASE CLEAED OUT INTERNALS WIT}N SOLVENT. REFILLED WITH EP-0 GREASE 4 LBS.0FERATING SAT.
>228 01/31/86 01-RC -HSS -106 029870 COTTERPIN MISSING ON SNUB KR 1 1/2" V-0415 INSFECTED MISSING COTTER PIN FOUND OUT IT WAS THE WRONG SIZE REPLACED PIN WITH FROPER SNUBER PIM W/1/4" COTTER PIN HOLES INSTALLED 2 NEW 1/4" COTTER PINS
>228 01/31/86 01-Rt -HSS -117 029955 FLUID IN RESERVOIR IS LOW CHECKED AND FOUND RESERVOIR IS MOUNTED ON SIDE OF SNUBBER. FILLED AS FAR AS VENT HOLE WOLLD ALLOW 228 01/31/86 01-Rt -HSS -138 029862 FILL RESER90IR TO 100%
FILLED RESER90IR TO 100% W/ 5000 FLUID D228 01/31/86 01-RC -HSS -142 029856 FILL RESERVOIR TO 100%
FILLED RESERVOIR TO 100% W/ "A00 FLUID
)
228 01/31/86 01-Rt -HSS -154 029861 FILL SNUBBER RESERVOIR TO 100% TOFfED TO 100%
228 01/31/86 01-RC -HSS -158 029859 FILL RESER9OIR TO 400 %
TOFfED TO 100%
)228 01/31/86 01-RH -HSS -102 029872 LOW FLUID LEVEL VENT FtuG ON SIIE RESEK90IR WOULDN'T TME ANY MOFE SF 1154
)228. 01/31/86 01-S W -HSS -10 029844 LOW FLUID LEVEL, FITTINGS LEAK TIGHTENED FITTINGS AND FILLED RESER9OIR.
)228 01/31/86 01-S W-HSS -13A 029843 LOW FLUID LEVEL 4" V-0495 FILLED RESERVOIR TIGHTENED FITTINGS
)228 01/31/86 01-SHP-HSS -14A 029721 FILL FiSER90IR TO 80% LEVEL 4" V-0606 FILLED RESERVOIR TO 95%
LEVEL
)228 01/31/86 01-S W -HSS -14B 029719 FILL RESER910R TO 90% LEVEL FILLED RESERVOIR TO 90% LEVEL 1228 01/31/86 01-SW -HSS -21 029720 REFOSITION 4" V-0498 REPOSITIONED SLEEVES TO FROPER POSITION AND ADIED WASERS TO CUTSIIE OF CLEVIS.
Page 25 of 28 PCO
' SAFETY RELATED DURIrG REDUCED POWER SORTED BY LNIT AND IEFARTnENT FROCSAM WPT09860 02/04/86 10:06 PAGE FROM 01/24/86 THRU 01/31/86 UNIT 01 SURRY RETURNED TO WO EPT SERVICE MARK NUMBER NUMBER WO TIlLE HISTORY
SUMMARY
'229 01/31/86 01-SW-HSS -24 029724 REFOSITION SLEEVE 4" V-0501 INSTALLED WASKES ON BOTH ENDS OF CLEVIS / PIPE END AND REPOSIT 10ED CLEVIS PIN
>228 01/31/96 01-SHP-HSS -3B 029848 LOW FLUID LEVEL, LEAKING TIGHTENED ALL FITTINGS RESERVOIR FITTING FILL TO 100%
SIIE MOUNTED FILLED TO 80%
'228 01/31/86 01-SW-HSS -32 029751 FILL FLUID LEVEL TO 90%
FILLED EESERVOIR TO 95% FtLL ESERVOIR WAS FOLHD AT 80%
2228 01/31/86 01-SHP-HSS -5B 029845 LOW FLUID LEVEL, FITTINGS LEAK FILLED PESERVOIR. TIGHTENED FITTINS NOTE... THIS SNUB ER NEEDS SPACERS SD CLEVIS BRACKET,PIFE IS BENT BAItY. PIN IS ALSO DISCOLORED TO BLUE SHAIE. WR SUBMITTED 4331370
>220 01/31/96 01-SI -HSS -100 029725 REBUILT RESERVOIR AND FILL FILLED RESERVOIR TO 90% VERIFY V-0537 MILLER CYLINIER 1 1/2".
REPAIRED VENT FILTER. FOUND SNUBE R AT ABOUT 80% FILLFD AND A MJILD LP 0F BORIC ACID ON VALVE BODY. SPACER 1228 01/31/86 01-SI -HSS -20 029869 FLUID LEAK AT FITTING ON BACK TIGHTENED FITTINGS AND FILLED TO 90%
$228 01/31/86 01-WFP-HSS -1 029840 LOW FLUID LEVEL FILLED RESERVOIR TO 90% FOLND RESERVOIR LOOSE AND TIGHTEED IT.
NOTE... THIS SNUBER NEEDS SPACERS AND PINS. REFtACED BOTH PINS AND INSTALLED TWO 1/8" SPACERS ON
>228 01/31/86 01-WFP-HSS -11 029842 FLUID LEVEL LOW, LEAKS ON FEMOVED SNUBBER IAW 130 V4 0556 CYLINDER HEAD AND TRANSPORTED TO TEST AREA. TESTED V-0556 SNUBBER MANUALLY FOR BINDAGE ENTIRE 5" STROKE OF SNUBBER IN TENSION AND COW. DIR. SET SNUBIER
>228 01/31/86 01-WFP-HSS -14 02Y841 LOW FLUID LEVEL, LEAKING FIT-FILLED RESERVOIR TIGHTENED FITTINGS 7ing NOTE THIS SMJBBER NEEIED COTTER PIN REPLACED COTTER PIN j
4228 01/31/86 01-WP-HSS -3 029846 LOW FLUID LEVEL FILLED RESERVOIR AND TIGHTEED FITTINGS.
NOTE... THIS SNUBBER HAS PINS WITH SNAP RINGS AND NEEDS SPACERS. REPLA CED PIN WITH NEW ONES AND ADIED 228 01/31/86 01-WFP-HSS -9 029847 LOW FLUID LEVEL, FITTINGS LEAK 2 1/2 V-0554 FILLED RESERVOIR TIGHTENED FITTINGS
>228 01/31/86 01-WGC-HSS -02 029871 LOW FLUID LEVEL FILLED TO 90% W/SF1154 FLUID 1 1/2" V-0568
>229 01/25/86 01-CH -P
-2A 029529 DISCCNNECT STRIP KATERS FOR REMOVED BOXES CONTAINING STRIP
' MECH. RECONNECT WHEN REQUESTED EATERS. LEADS ERE MARKED GI EAST BOX BEFORE THEY WERE REMOVED FROM BOX 1/21/86 REINSTALLED STRIP HEATER 1/25/66 TESTED SAT
)229 01/27/86 01-CH -MOV -1370 014148 REPACK REFLACE BONNET GASNET ADJUSTED PACKING GLAND NUTS 3 FLATS CLEAN OFF BORIC ACIO LEAKAGE AFfROX 3/4" ADJJSTENT LET.
REMOVED BORIC ACID CRYSTALS FROM VALVE. UNABLE TO DETERMINE LEAKAGE ICE TO SYSTEM BEING TAGGED OUT.
)229 01/29/86 01-BD -TV -100F 029894 REMOVE / REPLACE LIMIT SWITCHES MECH WEEE ABLE TO PERFORM THIS WORK WITHOUT REMOVAL OF LIMIT SWITCHES
v Page 26 of 28 FC0
' SAFErY ELATED DURING FIDUCED FTNER SORTED BY UNIT AND IEPARTMENT PROGRAh WPT00960 02/04/86 10:06 FAGE FROM 01/24/86 IHRtj 01/31/86 UNIT 01 SURRY RETURNED TO WO EPT SERVICE MARK NUMBER NUrdER WO TITLE HISTORY
SUMMARY
229 01/29/06 01-CH -HT -2B136 028590 BKR TRIFfED. WONT RESET CLEAPED GROUND IN JUNCTION BOX.
WROTE ICVIATION ON CIRCUIT BECAUSE IT DID NOT FALL WITHIN TECH SPEC.
IESIGN ENGINEER D. PAIO_A IETERMINE D CIRCUIT SAT PER 1-PT-27H FEFFORME 229 01/29/86 01-RH -P
-15&lA 02Y691 CHECK fMR MOTORS AND ADD OIL NO OIL NEEDED 229 01/31/86 01-CH -MOV -1275A 026483 FM - ON IEMAND CLEANED OLD GREASE FROM LIMIT SW GEARS AND INSTALLED NEW GREASE.
11/15/85. AW AVERAGE 4.1 leilLE RUNNING. FULL LOAD AMPS 2.7. NEW MOTOR ON ORDER.WRC 298794 SUBMITTED a229 01/31/86 01-CH -MOV -1275A 027461 MOTOR DRAWS HIGH AMPS. REPAIR / DISCONNECTED MOTOR. NOTOR IN REFURB l
REPLACE MOTOR BUILDING T2 LEAD ON MOTOR EEDED TO BE SFtICED LEAD IN TWO PIECES MOTOR IN FtRFtE BAG IN REFURB KDG 12/5/
- 85. ASSEhKED MOTOR AND RAN. MOTOR G29 01/31/86 01-CH -MOV -1275A 027651 DISCONNECT / RECONNECT LIMITS DISCONNECTED LIMIT SW AND TOROUE SW. SW IN FtAY BAD ON PIFE WITH VAL VE.NEED TO REFtACE LIMIT SWITCH FLASTIC BROKEN. RECONNECTED LIMIT SW AND TOROUE SWITCH. RAN MOV AVG.
0229 01/31/86 01-EP -FE -189 029267 REftACE 2" GAUGE REPAIR LEAK REFtACED VALVE AND GUAGE.SN00 FED NO LEAKS. FILLED TO 21 FSI WAITED 15 MIN NO LEAK SAT 1/26/86
>229 01/31/86 01-EP -FE -2E 028791 GAUGE SHOWS 38 FSI ACTUAL PSI GAUGE REFLACED FILLED TO 21 FSI SHOOPED AND NO LEAKS ON 1/25/86 1500 READ GAUGE @ 0930 ON 1/26/86 STILL READS 21 PSI SAT.
229 01/31/86 01-EFW EP -1C 029201 PENET<ATION LEAKAGE.
REPAIRED TUBING GOING INTO FENETRAT ION. FILLED TO 24 PSI SN00 FED AND D DID NOT SEE ANY LEAKS. STAYED @ 24 FSI F0H 15 MIN SAT 1/26/86 OK
)229 01/31/86 01-RC -PCV -1455A 029828 REMOVE LIMITS FOR MECH.
INVESTIGATED AND WE DIDN'T FIND ANY LIMITS INSTRt K NT TECH ALREADY REINSTALL WHEN REQUESTED.
HAD A PENUMATIC CONTROL DISCONNECT ED D237 01/24/86 01-FP -PNL -NA 029320 RESET & UPDATE TINE & DATE, RESET BUTTON INADVERTINALLY HIT PANEL NOT OPERATING PROPERLY.
CLEARING TIE AND DATE. REINIATED TIME AND DATE. WORKS FIE. OPS SAT D237 01/25/86 01-CH -LI -1115 029493 VCT DID NOT AUTO SWAPOVER TO VERIFIED TRIP AND RESET ON COW ARAT RWST AT 3%
ORS LC-1-112B AND LC-1-115B.
INITIATED A 2 0F 2 LOLO LEVEL AND VERIFIED FUNCTIONAL OPERATION OF RWST CROSS TIE VALVES TO TE SUCTIO D237 01/27/06 01-FW -TI -154A 028341 82 IEGREE F DISCREPENCY REFLACED TERMOMETER 14936140 D237 01/27/86 01-GW -FI -101 029621 CALCULATED FLOW WAS 2.69,INDIC-CALIBRATED TRANSMITTER SAT.
ATED FLOW WAS 1.85 CPM CALIBRATE FL. FT
v
...* 'o Page 27 of 28 PC0
' SAFETY FELATED DURING REDUCED F0WER SORTED BY UNIT AND IEPARTnENT PROGRAM WPT09860 02/04/86 10:06 PAGE FROM 01/24/86 THRU 01/31/96 UNIT 01 SURRY RETURNED TO WO EPT SERVICE MARK NUhKR NUMBER WO TITLE HISTORY
SUMMARY
?237 01/30/06 01-eft-LAB -LOGIC 029540 NDN URGENT FAILURE REFLACED MAIN AND AUXILIARY 100 VOLT F0WER SLFftY, REPLACED CAPACIT OR CI.REFtACED FAILURE DETECTOR CARD IN A700 SLOT. REFLACED I/O AC AMFtIFIER CARD IN A 805 SLOT.
'237 01/30/66 01-RM -Rh5 -159 029580 FILTER PAFER WILL NOT ADVANCE REPAIRED THE SPRING CLIP THAT BROKE LOOSE FROM THE RATCET SOLEN 0ID eECHMISM.NOW TE PAFER ADVANCE MECHANISM WORKS SATISFACTORY AND THE PARTICULATE ACTIVITY RESPOND 237 01/30/86 01-RP -MON -6 026994 Fvi-A4 BIAS FEADS 10% CANNOT FOUND WIRE LOOSE AT TERMINAL STRIP ADJUST. INVESTIGATE r. REPAIR IN BOX FOR LINE DRIVER IN CONTAINE STAT!c cAUSES ALARM TO COME IN NT. RELUGGED WIRE AND REFLACED LINE DRIVER,FERFORMED HAMER TEST.
Ch SAT.
237 01/30/86 01-SI -FI -962 017142 INDICATING FLOW OF 100 GPM SWAFfED CIRCUIT CARDS DID NOT FIX FROBLEM,0 PEED ISOLATION VALVE COULD NOT BALANCE SYSTEM. TRANSMITT ER OUTFtIT STILL PEGGED HIGH. CONSTR UCTION IS TO REPLACE TE TRANSMITTE C37 01/31/86 01-MS -LI -494 029822 CA.1 "C" SG ima0W RGE LEVEL DRAINED HI SIDE TO ELIMINATE AIR IN LINE, CE CKS C@ D.
237 01/31/86 01-RC -PCU -1455A 029741 REMOVE /FEINSTALL INST. FOR MECM REINSTALLED INSTRMNTATION ON MAINT.
VALVE AND CHECKED FOR 0-100%
STROKE PART 01 EA 3661070 ELBOW
', i Page 28 of 28 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 MONTH / YEAR January - 1986 NONE DURING THIS REPORTING PERIOD The below listed codes denotes the following departments:
0228 or R03 Mechanical i
0229 or R04
- Electrical l
0237 or T22 Instruments i
i
w 1O VIHGINIA ELEcTHlc AND 180W E H C O M I'A N Y Hicianoxin,Vinoixir 20261 W.L. STEWART vics P===io===
February 13, 1986 No cLEAm ormaATIONM Mr. Maurice R. Beebe Serial No.86-078 Office of Resource Management N0/ETS:acm U.S. Nuclear Regulatory Con: mission Docket Nos.
50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32 DPR-37
Dear Mr. Beebe:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the month of January, 1986.
Very truly yours,
_ d7 W. L. Stewart Enclosure (3 copies) cc:
Mr. James M. Taylor, Director (12 copies)
Office of Inspection and Enforcement Dr. J. Nelson Grace (1 copy)
Regional Administrator Region II Mr. Donald J. Burke (1 copy)
NRC Resident Inspector Surry Power Station 9
&