ML20203D589

From kanterella
Jump to navigation Jump to search
Forwards Amend 23 to FSAR for Vogtle Electric Generating Station Units 1 & 2.Itemized Listing of Ltrs & Updates & Instructions for Inserting FSAR Changes Also Encl
ML20203D589
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/17/1986
From: Conway R
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20203D594 List:
References
GN-868, NUDOCS 8604220208
Download: ML20203D589 (2)


Text

_

Gmg a Fwr Ccroam 333('xc w t A mnue Av.ta G., erg:a 3t' OS

%;*ye 4N 526 6724 Ma/c,g AJSets Pcist owe fics 4545

.M' Ant 3 G w;3 MC2

% <,,y n n, t< c t,ssem R. E. Conway Se cr 1 m Prc% ten:

April 17, 1986 j

Director of Nuclear Reactor Regulation File: X7N00-23 Attention:

Mr. B. J. Youngblood Log:

GN-868 PWR Project Directorate iP4 Division of PWR Licensing A U.S. Nuclear Regulatory Commission Washington, D.C.

20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 VOCTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 FSAR AMENDMENT NUMBER 23 j

Dear Mr. Denton:

~

Georgia Power Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton,' Georgia, hereby submits Amendment 23 to the Vogtle Electric Generating Plant (VEGP) Final Safety Analysis Report (FSAR)

"Diis amendment consists of revised pages for the FSAR and provides revisions as documented in previous correspondence with the NRC, design and/or operational updates, and closure of SER items. A listing of the letters and updates are itemized in Attachment 1.

Also included are instructions for inserting the Amendment 23 FSAR changes.

In accordance with the requirements of 10 CFR 54.30(b) and (c), three (3) signed originals and sixty (60) copies of Amendment 23 are submitted for your use.

Should you have any questions on the enclosed submittals, do not hesitate to Yours truly, 3*r R. E. Conway SWORN AND SUBSCRIBED BEFORE ME, THIS

/M DAY OF d

1986 NU $O00k $$ooM24

~#

K PDR

@ry ic, Georda State at Wge MY COMMISSION EXPIRES APRIL 11.1988

i i

I Georgia Power 1 Director of Nuclear Reactor Regulation File: X7N00-23 April 17, 1986 Log:

GN-868 Page 2 xc:

M. A. Miller R. A. Thomas G. Bockhold, Jr.

L. T. Gucwa J. E. Joiner, Esquire B. W. Churchill, Esquire B. Jones, Esquire H. H. Gregory, III D. C. Teper W. C. Ramsey Vogtle Project File 0362V