Forwards Insp Repts 50-254/97-21 & 50-265/97-21 on 970923-1103.Insp Concluded That Overall Preformance at Plant Was Safe.No Violations Were Identified
ML20203D320
Person / Time
Site: Quad Cities  
Issue date: 12/09/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Pearce L
COMMONWEALTH EDISON CO.
Shared Package
ML20203D325 List:
References
50-254-97-21, 50-265-97-21, NUDOCS 9712160164
Download: ML20203D320 (4)


See also: IR 05000254/1997021

Text

_ --- _ _---___ -.

UNITED STATES

pe2 N%,'o

NUCLEAR REGULATORY COMMISSION

+

'. g

8

REGION itt

n

)

(

{,1

(101 WAnhENVILLE~ HOAD

g

o

- :-i

f

LISLE,IlllNOIS 60532 4351

December 9, 1997

Mr. L W. Pearce

Site Vice President

Quad Cities Station

Commonwealth Edison Company

22710 206th Avenue North

Cordova, IL 61242

SUBJECT:

NRC INSPECTION REPORT NO. 50-254/97021(DRP); 50 265/97021(DRP)

Dear Mr. Pearce:

This refers to the inspection conducted on September 23 through November 3,1997, at the

Quad Cities Nuclear Power Station. The purpose of the inspection was to determine whether

activities authortzed by the license were conducted safely and in accordance with

NRC requirements. During this period, routine resident inspections were performed. The

enclosed report presents the results of this inspection. Based on the inspectors' findings, overall

performance at the Quad Cities Station was safe. At the conclusion of the inspection, the

findings were discussed with those members of your staff Identified in the enclosed repoit.

Operators demonstrated good control during complex plant manipulations. Even though the

improvements made to the maintenance and planning process have decreased work raquest

backlogs, equipment problems continued to affect unit operations and availability of supporting

equipment. You identified procedures which allowed operators to bypass the primary

containment supprossion pool function during inerting or de-inerting activities, but failed to report

instances when Technical Specifications (TS) were not met in this area. You also identified

additionalinstances where TS required surveillances were missed. This is a continuation of a

problem we identified in previous inspections. You should apply appropriate management

attention to ensure surveillance testing is accomplished in the required time intervals. Additional

occurrences of inadequate procedures to implement safe shutdown actions in the event of a fire

were identified, and will be reviewed in a separate inspection report.

I

\\

i

m29BhuE!!)k

G

4

T. .E. .IN. . All

-- .

_

^

l

l

!

L Pearce

c2a

{

!

t

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

,

Sincerely,

p{G.C G+wr

,

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos: 50 254;50-265

License Nos: DPR 29; DPR 30

Enclosure:

Inspection Report

No. 50 254/g7021(DRP);

50 265/g7021(DRP)

cc w/ encl:

O. Kingsley, Nuclear Generation Group

President and Chief Nuclear Officer

M. Wallace, Senior Vice

President, Corporate Services

,

E. Kraft, Vice President

BWR Operations

Liaison Officer, NOC BOD

D. A. Sager, Vice President,

,

Generation Support

<

D. Farrar, Nuclear Regulatory

Services Manager

'

1. Johnson, Licensing

Operations Manager

Document Control Desk Licensing

D. Cook, Quad Cities Station Manager

C. C. Peterson, Regulatory Affairs

Manager

,

'

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

-

State Liaison Officer

Chairman, Illinois Commerce

Commission

W. D. Leech, Manager of Nuclear

MidAmerican Energy Company

See Attached Distribution

DOCUMENT NAME: G;! QUAD \\ QUAG 7021.DRP

v.

  • . . n . w. m

i

i

w. c . con m

m

r - c.n mai .n ii

o

n . m.

/

OFFICE

Rlll

le

Rlli

le

Rlil

l

Rlli

M'

,'

NAME

RLearch W4

MRingOhO

GGranfAM

/

DATE

14+ -/97

44f-/97

1M/M (\\

  1. f/ /97

.

r'/7

14WICIAL RECORD COPY

>

m

m a

w.,.-,,-4.e-o--

.-e-.q-%-m--mm

--

s

,e

w--,,

,a-

m

-.,.-.ss

v

yw

-

pva

pw--

._,..._,,.wmn,,-.,.,-m-

m.%%ec--yn on..w,_a-

r-

g

--we

aser-

,4ym,y--r--

,w

y-----

L. Paaroe

2-

In accordanos with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

Sincerely,

,

G

'ff

QDim .ar.nsW,

g

of Reactor Projects

Docket Nos: 50 254;50 265

License Nos: DPR 29; DPR-30

Enciosure:

Inspection Report

No. 50 254/g7021(DRP);

50 265!g7021(DRP)

cc w/onu:

O. Kingsley, Nuclear Generation Group

President and Chief Nuclear Officer

M. Wallace, Senior Vice

President, Corporate Services

E. Kraft, Vice President

BWR Operations

Liaison Officer, NOC BOD

D. A. Sager, Vice President,

Generation Support

D. Farrar, Nuclear Regulatory

Services Manager

l. Johnson, Licensing

Operations Manager

Document Control Desk Licensing

D. Cook, Quad Cities Station Manager

C. C. Peterson, Regulatory Affairs

Manager

Richard Hubbard

Nathan Schloss, Economist

.

Office of the Attomey General

State Liaison Officer

Chairman, Illinois Commerce

Commission

W. D. Leech, Manager of Nuclear

MidAmerican Energy Company

--

.

.

-

.

.

.

. .

_____________-_____;

.-

_ _ - _ _ _ - _ _ _ _ _ _ _ _ _

L. Pearce

3-

Distribution:

Docket File w/encls

DRP w/encls

OC.FOILFARB w/encls

TSS w/encls

PUBLIC IE 01 w/encls

DRS (2) w/ enc!s

A. Beach w/ ends

Rlli PRR w/encls

Deputy RA w/ ends

RAC1 (E-Malf)

Rlli Enf. Coord w/encls

CAA1 (E-Mall)

SRI Quad Cities w/encls

DOCDESK (E Mall)

Project Mgr., NRR w/encls

i

--- _.-__ _ __ _