Text
_ --- _ _---___ -.
UNITED STATES
pe2 N%,'o
NUCLEAR REGULATORY COMMISSION
+
'. g
8
REGION itt
n
)
(
{,1
(101 WAnhENVILLE~ HOAD
g
o
- :-i
f
LISLE,IlllNOIS 60532 4351
December 9, 1997
Mr. L W. Pearce
Site Vice President
Quad Cities Station
Commonwealth Edison Company
22710 206th Avenue North
Cordova, IL 61242
SUBJECT:
NRC INSPECTION REPORT NO. 50-254/97021(DRP); 50 265/97021(DRP)
Dear Mr. Pearce:
This refers to the inspection conducted on September 23 through November 3,1997, at the
Quad Cities Nuclear Power Station. The purpose of the inspection was to determine whether
activities authortzed by the license were conducted safely and in accordance with
NRC requirements. During this period, routine resident inspections were performed. The
enclosed report presents the results of this inspection. Based on the inspectors' findings, overall
performance at the Quad Cities Station was safe. At the conclusion of the inspection, the
findings were discussed with those members of your staff Identified in the enclosed repoit.
Operators demonstrated good control during complex plant manipulations. Even though the
improvements made to the maintenance and planning process have decreased work raquest
backlogs, equipment problems continued to affect unit operations and availability of supporting
equipment. You identified procedures which allowed operators to bypass the primary
containment supprossion pool function during inerting or de-inerting activities, but failed to report
instances when Technical Specifications (TS) were not met in this area. You also identified
additionalinstances where TS required surveillances were missed. This is a continuation of a
problem we identified in previous inspections. You should apply appropriate management
attention to ensure surveillance testing is accomplished in the required time intervals. Additional
occurrences of inadequate procedures to implement safe shutdown actions in the event of a fire
were identified, and will be reviewed in a separate inspection report.
I
\\
i
m29BhuE!!)k
G
4
T. .E. .IN. . All
-- .
_
^
l
l
!
L Pearce
c2a
{
!
t
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the
enclosure will be placed in the NRC Public Document Room.
,
Sincerely,
p{G.C G+wr
,
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos: 50 254;50-265
Enclosure:
Inspection Report
No. 50 254/g7021(DRP);
50 265/g7021(DRP)
cc w/ encl:
O. Kingsley, Nuclear Generation Group
President and Chief Nuclear Officer
M. Wallace, Senior Vice
President, Corporate Services
,
E. Kraft, Vice President
BWR Operations
D. A. Sager, Vice President,
,
Generation Support
<
D. Farrar, Nuclear Regulatory
Services Manager
'
1. Johnson, Licensing
Operations Manager
Document Control Desk Licensing
D. Cook, Quad Cities Station Manager
C. C. Peterson, Regulatory Affairs
Manager
,
'
Richard Hubbard
Nathan Schloss, Economist
Office of the Attomey General
-
State Liaison Officer
Chairman, Illinois Commerce
Commission
W. D. Leech, Manager of Nuclear
MidAmerican Energy Company
See Attached Distribution
DOCUMENT NAME: G;! QUAD \\ QUAG 7021.DRP
v.
- . . n . w. m
i
i
w. c . con m
m
r - c.n mai .n ii
o
n . m.
/
OFFICE
Rlll
le
Rlli
le
Rlil
l
Rlli
M'
,'
NAME
RLearch W4
MRingOhO
GGranfAM
/
DATE
14+ -/97
44f-/97
1M/M (\\
- f/ /97
.
r'/7
14WICIAL RECORD COPY
>
m
m a
w.,.-,,-4.e-o--
.-e-.q-%-m--mm
--
s
,e
w--,,
,a-
m
-.,.-.ss
v
yw
-
pva
pw--
._,..._,,.wmn,,-.,.,-m-
m.%%ec--yn on..w,_a-
r-
g
--we
aser-
,4ym,y--r--
,w
y-----
L. Paaroe
2-
In accordanos with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the
enclosure will be placed in the NRC Public Document Room.
Sincerely,
,
G
'ff
QDim .ar.nsW,
g
of Reactor Projects
Docket Nos: 50 254;50 265
Enciosure:
Inspection Report
No. 50 254/g7021(DRP);
50 265!g7021(DRP)
cc w/onu:
O. Kingsley, Nuclear Generation Group
President and Chief Nuclear Officer
M. Wallace, Senior Vice
President, Corporate Services
E. Kraft, Vice President
BWR Operations
D. A. Sager, Vice President,
Generation Support
D. Farrar, Nuclear Regulatory
Services Manager
l. Johnson, Licensing
Operations Manager
Document Control Desk Licensing
D. Cook, Quad Cities Station Manager
C. C. Peterson, Regulatory Affairs
Manager
Richard Hubbard
Nathan Schloss, Economist
.
Office of the Attomey General
State Liaison Officer
Chairman, Illinois Commerce
Commission
W. D. Leech, Manager of Nuclear
MidAmerican Energy Company
--
.
.
-
.
.
.
. .
_____________-_____;
.-
_ _ - _ _ _ - _ _ _ _ _ _ _ _ _
L. Pearce
3-
Distribution:
Docket File w/encls
DRP w/encls
OC.FOILFARB w/encls
TSS w/encls
PUBLIC IE 01 w/encls
DRS (2) w/ enc!s
A. Beach w/ ends
Rlli PRR w/encls
Deputy RA w/ ends
RAC1 (E-Malf)
Rlli Enf. Coord w/encls
CAA1 (E-Mall)
SRI Quad Cities w/encls
DOCDESK (E Mall)
Project Mgr., NRR w/encls
i
--- _.-__ _ __ _