ML20203D186
| ML20203D186 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 12/04/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Graesser K COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20203D191 | List: |
| References | |
| 50-454-97-20, 50-455-97-20, NUDOCS 9712160131 | |
| Download: ML20203D186 (4) | |
See also: IR 05000454/1997020
Text
, - _ _ _ _ _ _
. _ _ _ .
-
e
) ga pse
UtifiED STATES
uf
$'o
NUCLEAR REGULATORY COMMISSION
g
n
HE GtOld 111
<
$
B01 WAHREtNILLE nOAD
i
tISLE. IllitJO!S 6053N351
't,
- '
December 4, 1997
Mr. K. Graessor
site Vice President
Byron Station
Commonwealth Edison Company
4450 N. German Church Road
Byron,IL 01010
SUBJECT:
NRC INSPECTION REPORT No. 50-454/97020(DRP); 50455/97020(DRP) AND
NOTICE OF Vict.ATION
Daar Mr. Groessor:
On October 16,1997, the NRC completed an inspection at your Byron 1 arw 2 reactor facilities.
The enclosed report presents the inspection results.
During a Unit 1 startup and shutdown, and following a Unit 2 trip, operator performance was
excellent in panel attentiveness and communications, which were clear and formal. In addition,
station management made safety conscious, conservative decisions related to control of
operator work activities during an unplanned dual unit outage beginning on October 9,1997.
However, based on the results of the inspection, the NRC has determined that two violations of
NRC requirements occurred. The vlotations are cited in the enclosed Notice of Violation (Notice)
'
cnd the circumstances pertaining to the violations are described in detailin the enclosed report.
The first violation identified that technical specification amendments were not incorporated into
the controlled copies of control room books as required. This is a concem due to the resultant
unavailability of the current technical specifications for operator reference. Technical
specification compliance is both a significant safety and regulatory concem in that operators
cannot ensure technical specification compliance without up-to date documents.
Piease note that you are required to responc to this violation and abould follow the instructions
e
specified in the enclosed Notice when prepa,ing your response. The NRC will use your
response, in part, to determine whether furtaer enforcement action is necessary to ensure
compliance with regulatory requirements.
The second violation discusses an incident where a visitor was left unescorted for about
30 minu., .,. This is a concem because it was identified by the NRC and shov,ed a lack of
sufficient knowledge of security escort requirements by both a visitor and ar escott.
e
The NRC has concluded that Information regarding the reason for the second violation, the
corrective actions taken and planned to correct the violation, and prevent recurrence is
cddressed in Section 88 of the enclosed report. Thereforo, you are not required to respond to
[D
k
9712160131 971204
,
,
. . .
_ _
_ , . _ . _ _ _ . . . . . _ _ . _ _ . _ _ _ _ . _ . _ _ _ . _ _ _ _ _ _ . .
. _ _ . - _ . . _ . . _ _ _ _
_
.
.
6
W.Graesser
2-
I
this violation unless the information in the enclosed report does not accurately renect your
[
correceive adions or your position, or if you choose to provide additional information.
l
!
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
>
enclosures, and your response will be placed in the NRC Public Document Room.
l
t
Sincerely,
!
I. MDirector,
Division of Reactor Pr.4emts
i
\\
Endoeures: 1. Notice of Violation
>
2. Inspection Report
No. 50 454/97020(DRP);
No. 50 455/92020(DRP)
i
oc w/encia:
O. Kingsley, Nuclear Generation Group
Presiderd and Chief Nuclear Omoer
M. Wallace, Senior Vios
President, Corporate Services
H. O. Stanley, Vm President
i
PWR Operations
-
Liaison ofrar, NOC-BOD
D. A. Sager, Vice Presiderd,
,
Generation Support
D. Farrar Nuclear Regulatory
!
Services Mana9er
1. Johnson, Licensing
operations Man ow
,
Document Control Desk-Licensing
'
K. Kofron, Station Manager
D. Brindle, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist
Omco of the Attomey General
State Liaison omoer
,
State Liaison Offmer, Wisconsin
Chairman, lilinois Commerce
Commission
,.
i,
SEE PREVIOUS CONCURRENCES
DOCUMENT NAME: RD4SPRPTSPOWERS$YROWYR97020.DRP
v.
.
w
w c .
, -
, . e.,,
-
r.-
l
OFFICE
Rlli
l
Rlli -
s16
Rlli
l
Rill
l
,
NAME
Pirtle/ Creed /co
Jordan
Grant
Sec. S.8.1
'.
!
"
Ltr.4Nov. Item #2
1A
'
DATE
12/ /97
12/3/97'
124 Mf >
12/ /97
'
OFFICIAL RECORD COPY
r
>
- -..-
. _ , . . - . . . . , - . . , ~ , . . -
,. . . ~ _ , . - .
- - - . - . ~ . - , , , . - . , , - , , - . .
., . -- ,,,-,--.,-.
. , . - , - . . . , , - , , . ,
_ _ _
._ __-_ ___-_-__ - -
.
W. Groesser
-2-
this violation unless the information in the enclosed report does not accurately reflect your
corrective actions or your position, or if you dase to provide additional information.
in accordance with 10 CFR 2.790 of the NRC's * Rules of Practice," a copy of this letter, its
{
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
Geoffrey E. Grant, Director,
Division of Reactor Projects
-
Enclosures: 1. Notics of Vmlation
2. Inspection Report
No. 50 454/g7020(DRP);
No. 5N55/g2020(DRP)
cc w/encis:
O. Kingsley, Nucleer Generation Group
President and Chief Nuclear Offcer
M. Wallace, Senior Vice
Passident, Corporate Services
H. G. Stanley, Vce President
PWR Operations
Liaison offcer, NOC-BOD
D. A. Sager, Vce President,
Generation Support
D. Farrar, Nuclear Regulatory
Services Manager
1. Johnson, Ucensing
Operations Manager
Document Control Desk Ucensing
K. Kofron, Station Manager
D. Brindle, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist
Office of the Attomey General
State Ualson Officer
State Walson Officer, Wisconsin
Chairman, Illinois Commerce
Commission
DOCUMENT NAME: RNNSPRPTSPOWERS$YROBYR97020.DRP
t.%..m.em.
m.we
w
w.c.cmm.m -
r omm w w
y.w
,
' OFFICE
Ritt
r
.
Rlli
l
Rlll
]
Rlli
NAME
girtle/ Creed /c8'
Jordan g
Grant
kSecM.81
g\\J
Ltr.&Nov, item #2
DATE
11/$/97
11/d /97
11/ /97
11/ /97
_.
OFFICLAL RECORD COPY
~'
9
. . . .
.
--
..
_
- - -
. - . _ _ - . - . _
- - . . . . . -.
.- _
_ , -
.
.
I
w. armsw
->
,.
Dia m a no:
Docket File w/oncis
DRP wfenols
'
OCFO/LFAR8 w/ ends
TSS w/encis
PU80C IE 01 wfends
DRS (2) wfenois
A. Beach w/encls
Rlli PRR w/encis
Deputy RA w/ ends
RAC1 (E-Mail)
'
Rlli Enf. Coord. w/oncis
CAA1 (E-Mali)
SRI Byron w/oncis
DOCDESK(E-Mail)
Project Mgr., NRR w/encis
4
5
1
.,
I
I
y
w
-
. w
-..
-
- .- - i ,-,