Forwards Insp Repts 50-454/97-20 & 50-455/97-20 Between 970909 & 1016 & Nov.Violations Re Failure to Incorporate TS Into Controlled Copies of Control Room Books as Required & Visitor That Was Left Unescorted for About 30 Minutes
ML20203D186
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/04/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Graesser K
COMMONWEALTH EDISON CO.
Shared Package
ML20203D191 List:
References
50-454-97-20, 50-455-97-20, NUDOCS 9712160131
Download: ML20203D186 (4)


See also: IR 05000454/1997020

Text

, - _ _ _ _ _ _ . _ _ _ .

-

e

) ga pse uf UtifiED STATES

$'o

g NUCLEAR REGULATORY COMMISSION

n HE GtOld 111

<

$ B01 WAHREtNILLE nOAD

i

  • tISLE. IllitJO!S 6053N351

't,

        • ' December 4, 1997

Mr. K. Graessor

site Vice President

Byron Station

Commonwealth Edison Company

4450 N. German Church Road

Byron,IL 01010

SUBJECT: NRC INSPECTION REPORT No. 50-454/97020(DRP); 50455/97020(DRP) AND

NOTICE OF Vict.ATION

Daar Mr. Groessor:

On October 16,1997, the NRC completed an inspection at your Byron 1 arw 2 reactor facilities.

The enclosed report presents the inspection results.

During a Unit 1 startup and shutdown, and following a Unit 2 trip, operator performance was

excellent in panel attentiveness and communications, which were clear and formal. In addition,

station management made safety conscious, conservative decisions related to control of

operator work activities during an unplanned dual unit outage beginning on October 9,1997.

However, based on the results of the inspection, the NRC has determined that two violations of

'

NRC requirements occurred. The vlotations are cited in the enclosed Notice of Violation (Notice)

cnd the circumstances pertaining to the violations are described in detailin the enclosed report.

The first violation identified that technical specification amendments were not incorporated into

the controlled copies of control room books as required. This is a concem due to the resultant

unavailability of the current technical specifications for operator reference. Technical

specification compliance is both a significant safety and regulatory concem in that operators

cannot ensure technical specification compliance without up-to date documents.

Piease note that you are required to responce to this violation and abould follow the instructions

specified in the enclosed Notice when prepa,ing your response. The NRC will use your

response, in part, to determine whether furtaer enforcement action is necessary to ensure

compliance with regulatory requirements.

The second violation discusses an incident where a visitor was left unescorted for about

30 minu., .,. This is a concem because it was identified by the NRC and shov,ed a lack of

sufficient knowledge of security escort requirements by both a visitor and are escott.

The NRC has concluded that Information regarding the reason for the second violation, the

corrective actions taken and planned to correct the violation, and prevent recurrence is

cddressed in Section 88 of the enclosed report. Thereforo, you are not required to respond to

[D k

9712160131 971204

,

,

. . .

_ _ _ , . _ . _ _ _ . . . . . _ _ . _ _ . _ _ _ _ . _ . _ _ _ . _ _ _ _ _ _ . .

_

. _ _ . - _ . . _ . . _ _ _ _

.

.

6

W.Graesser 2- I

this violation unless the information in the enclosed report does not accurately renect your [

correceive adions or your position, or if you choose to provide additional information.

l

!

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its >

enclosures, and your response will be placed in the NRC Public Document Room. l

t

Sincerely,  !

I. MDirector,

Division of Reactor Pr.4emts i

\

Endoeures: 1. Notice of Violation >

2. Inspection Report

No. 50 454/97020(DRP);

i

No. 50 455/92020(DRP)

oc w/encia: O. Kingsley, Nuclear Generation Group

Presiderd and Chief Nuclear Omoer

M. Wallace, Senior Vios

President, Corporate Services

H. O. Stanley, Vm President i

PWR Operations -

Liaison ofrar, NOC-BOD

D. A. Sager, Vice Presiderd, ,

Generation Support

D. Farrar Nuclear Regulatory  !

Services Mana9er

1. Johnson, Licensing

operations Man ow ,

Document Control Desk-Licensing

'

K. Kofron, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economist

Omco of the Attomey General

State Liaison omoer ,

State Liaison Offmer, Wisconsin

Chairman, lilinois Commerce

,.

Commission

i, SEE PREVIOUS CONCURRENCES

DOCUMENT NAME: RD4SPRPTSPOWERS$YROWYR97020.DRP

v. . w w c . , - , . e.,, -

r.-

l OFFICE Rlli l Rlli - ,

s16 Rlli l Rill l

NAME Pirtle/ Creed /co Jordan Grant

"

Sec. S.8.1 '.

Ltr.4Nov. Item #2 1A  !

'

DATE 12/ /97 12/3/97' 124 Mf > 12/ /97

'

OFFICIAL RECORD COPY

r

>

. _ , . . - . . . . , - . . , ~ , . . - ,. . . ~ _ , . - . - - - . - . ~ . - , , , . - . , , - , , - . . ., . -- ,,,-,--.,-. . , . - , - . . . , , - , , . ,

_ _ _

._ __-_ ___-_-__ - -

.

W. Groesser -2-

this violation unless the information in the enclosed report does not accurately reflect your

corrective actions or your position, or if you dase to provide additional information.

in accordance with 10 CFR 2.790 of the NRC's * Rules of Practice," a copy of this letter, its

{ enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

Geoffrey E. Grant, Director,

-

Division of Reactor Projects

Enclosures: 1. Notics of Vmlation

2. Inspection Report

No. 50 454/g7020(DRP);

No. 5N55/g2020(DRP)

cc w/encis: O. Kingsley, Nucleer Generation Group

President and Chief Nuclear Offcer

M. Wallace, Senior Vice

Passident, Corporate Services

H. G. Stanley, Vce President

PWR Operations

Liaison offcer, NOC-BOD

D. A. Sager, Vce President,

Generation Support

D. Farrar, Nuclear Regulatory

Services Manager

1. Johnson, Ucensing

Operations Manager

Document Control Desk Ucensing

K. Kofron, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

State Ualson Officer

State Walson Officer, Wisconsin

Chairman, Illinois Commerce

Commission

DOCUMENT NAME: RNNSPRPTSPOWERS$YROBYR97020.DRP

t.%..m.em.

y.w ,

m.we w w.c.cmm.m - r omm w w

' OFFICE Ritt r .

Rlli l Rlll ] Rlli

NAME girtle/ Creed /c8' Jordan g Grant

kSecM.81 g\J

Ltr.&Nov, item #2

DATE 11/$/97 11/d /97 11/ /97 11/ /97

~'

_.

OFFICLAL RECORD COPY

9

. . . . . -- .. _ - - - . - . _ _ - . - . _ - - . . . . . -. .- _ _ , -

. .

I

l

w. armsw ->

,.

l

Dia m a no:

Docket File w/oncis DRP wfenols '

OCFO/LFAR8 w/ ends TSS w/encis

PU80C IE 01 wfends DRS (2) wfenois

'

A. Beach w/encls Rlli PRR w/encis

Deputy RA w/ ends l

RAC1 (E-Mail)

Rlli Enf. Coord. w/oncis CAA1 (E-Mali)

SRI Byron w/oncis DOCDESK(E-Mail)

Project Mgr., NRR w/encis

4

5

1

.,

I

I

y - . w -