ML20203D024

From kanterella
Jump to navigation Jump to search
Submits Plan for NRC Review & Evaluation of Isap Iii.D, Preoperational Testing. Section Numbers Refer to Sections of NRC Evaluation to Be Produced by Listed Individuals
ML20203D024
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/14/1986
From: Noonan V
Office of Nuclear Reactor Regulation
To: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20198J235 List:
References
FOIA-86-272, FOIA-86-454 NUDOCS 8604210343
Download: ML20203D024 (2)


Text

,j t,

/ 'o,, UNITED STATES

! c. NUCLEAR REGULATORY COMMISSION l;; E WASHINGTON D. C. 20$55

  • s.,*****} APA 14 g MEMORANDtH FOR: B. Grimes, Director Division of Quality Assurance, '

hl) [t Vendor and Technical Training Programs, IE E. Johnson, Director Division of Reactor Safety and Projects, Region IV R. Ballard, Chief Engineering Branch Division of PWR Licensing-A, NRR F. Rosa, Chief Electrical, Instrumentation and Control Systems Branch Division of PWR Licensing-A, NRR FROM: Vincent S. Noonan, Director PWR Project Directorate No. 5 Division of PWR Licensing-A, NRR

SUBJECT:

EVALUATION OF COMANCHE PEAK ISAP ISAP No. III.d

Title:

Pre-Operational Testing The plan for NRC review and evaluation of this ISAP is as outlined below.

Section numbers refer to sections of the NRC evaluation to be produced by those persons identified below:

Lead Project Manager: C. Tramel lead Technical Reviewer: W. Smith Person

Section Title Introduction W. Smith 1.0 W. Smith 2.0 CPRT Approach 3.0 Evaluation Evaluation of CPRT Approach W. Smith 3.1 W. Smith 3.2 Evaluatio_n of ISAP Implementation Conclusio'n W. Smith 4.0 j(p([ .

^

. yo j.}_L-

o X

f Person j

g IE contact as required: 3. Norkin 9 '

i Region IV contact as required: T. Westennan NRC Consultant: J. Malonson (Teledyne)

Schedule: (Date of receipt of report - April 14,1986)

April 24 (10 days following receipt):

Identify any additional information needed to Comanche Peak lead project manager.-

May 9 (25 days following receipt):

Evaluation inputs as shown above completed and signed out by E. Rossi (NRR), E. Johnson (Region IV) and B. Grimes (IE) as appropriate.

May 12 (26 days following receipt):

Meeting between technical reviewers, section leaders, PM, and OELD to discuss issuance of evaluation at day 45 (or other schedule) and prepare notice to Licensing Board at day 30.

May 29 (45 days following receipt):

Evaluation to be issued to all parties (normally, unless an exception is identified at the meeting).

. ,D R Projec Dire torate No. 5 Division of PWR Licensing-A cc: H. Denton l*.N CIiAIidfiTF J. Taylor G. Mizuno D. Eisenhut R. Bachmann R. Vollmer A. Vietti-Cook R. Martin, R-IV C. Early T. Novak C. Tramell E. Rossi I. Barnes, R-IV E. Christenbury G. Bagchi J. Scinto D. Jeng L. Shao J. E. Knight.

T. Westerman, R-IV D. Norkin J. Calvo