ML20203D024
| ML20203D024 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/14/1986 |
| From: | Noonan V Office of Nuclear Reactor Regulation |
| To: | Grimes B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20198J235 | List: |
| References | |
| FOIA-86-272, FOIA-86-454 NUDOCS 8604210343 | |
| Download: ML20203D024 (2) | |
Text
,j t,
UNITED STATES
/
'o,,
NUCLEAR REGULATORY COMMISSION c.
WASHINGTON D. C. 20$55 l;;
E
- s.,*****}
APA 14 g MEMORANDtH FOR:
B. Grimes, Director hl) [t Division of Quality Assurance, Vendor and Technical Training Programs, IE E. Johnson, Director Division of Reactor Safety and Projects, Region IV R. Ballard, Chief Engineering Branch Division of PWR Licensing-A, NRR F. Rosa, Chief Electrical, Instrumentation and Control Systems Branch Division of PWR Licensing-A, NRR FROM:
Vincent S. Noonan, Director PWR Project Directorate No. 5 Division of PWR Licensing-A, NRR
SUBJECT:
EVALUATION OF COMANCHE PEAK ISAP ISAP No.
III.d
Title:
Pre-Operational Testing The plan for NRC review and evaluation of this ISAP is as outlined below.
Section numbers refer to sections of the NRC evaluation to be produced by those persons identified below:
Lead Project Manager:
C. Tramel lead Technical Reviewer:
W. Smith Section Title Person 1.0 Introduction W. Smith 2.0 CPRT Approach W. Smith 3.0 Evaluation 3.1 Evaluation of CPRT Approach W. Smith 3.2 Evaluatio_n of ISAP Implementation W. Smith 4.0 Conclusio'n W. Smith j(p([
^
yo j.}_L-
o X
f Person j
g IE contact as required:
- 3. Norkin 9
i Region IV contact as required:
T. Westennan NRC Consultant:
J. Malonson (Teledyne)
Schedule:
(Date of receipt of report - April 14,1986)
April 24 (10 days following receipt):
Identify any additional information needed to Comanche Peak lead project manager.-
May 9 (25 days following receipt):
Evaluation inputs as shown above completed and signed out by E. Rossi (NRR), E. Johnson (Region IV) and B. Grimes (IE) as appropriate.
May 12 (26 days following receipt):
Meeting between technical reviewers, section leaders, PM, and OELD to discuss issuance of evaluation at day 45 (or other schedule) and prepare notice to Licensing Board at day 30.
May 29 (45 days following receipt):
Evaluation to be issued to all parties (normally, unless an exception is identified at the meeting).
,D R Projec Dire torate No. 5 Division of PWR Licensing-A cc:
H. Denton l*.N CIiAIidfiTF J. Taylor G. Mizuno D. Eisenhut R. Bachmann R. Vollmer A. Vietti-Cook R. Martin, R-IV C. Early T. Novak C. Tramell E. Rossi I. Barnes, R-IV E. Christenbury G. Bagchi J. Scinto D. Jeng L. Shao J. E. Knight.
T. Westerman, R-IV D. Norkin J. Calvo