Forwards Insp Repts 50-010/97-19,50-237/97-19 & 50-249/97-19 on 970828-1016 & Nov.Three Procedures Lacked Sufficient Detail to Ensure That Activities Were Properly Performed
ML20203C924
Person / Time
Site: Dresden  
Issue date: 12/04/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
COMMONWEALTH EDISON CO.
Shared Package
ML20203C930 List:
References
50-010-97-19, 50-10-97-19, 50-237-97-19, 50-249-97-19, NUDOCS 9712160047
Download: ML20203C924 (3)


See also: IR 05000010/1997019

Text

- , . .

. .-

.

- ~ .

-.. . . -

. ..

. -- -

.

. -. - -. -.

m,~

p-

' j 'H%,%j

-

UNITED STATES

'

- NUCLEAR REGULATORY COI,1 MISSION

7

- [=

REGtON lit

= r.

$~

i

801 WARRENVILLE ROAD -

LISLE, ILLINOIS 60532-4351

'

,-

o

T.

~

'

      • "

December 4,1997

,

Mr. J. 8. Perry : _ _

'

Site Vice Presided '

.

Dresden Nuclear Power Station

.

Commonwealth Edison Company

6500 North Dresden Road

Morris, IL 60450

p

SUBJECT: -

NRC INSPECTION REPORT NO. 50 010/97019(DRP); 50 237/P7019(DRP); -

,

50 249/97019(DRP) AND NOTICE OF V!OLATION

,

Dear Mr. Perry: .

l This refers to the inspection conducted on August 28 to October 16,1997, at the Dresden facility,

.

The purpose of the inspection was to determine whether activities authorized by the license were

i

conducted safely and in accordance with NRC requirements. During this period, routine resident

inspections we.e performed. The endosed report presents the results of these inspections,

j

During the period covered by this inspection, your conduct of activities at the Dresden Station

was charactertzed by a safety-conscious approach to activities. However, we are concemed

<

about two violations, with multiple examples, of NRC requirements.

F

In the first violation, three procedures lacked sufficient detail to ensure that activities were

pr porty performed. As a result of the first inadequate procedure, safety-related equipment wau

s

unnecessarily made unavailable. The second example of an inadequate procedure resulted in

an engineered safety feature aduation. The third example of an inadequate procedure resulted

in losing cooling to the spent futi pool with a subsequent small rise in pool temperature. The

NRC is issuing a violation for these self-revealing problems because of the impact the

inadequate procedures had on your operators' abilities to operate equipment important to safet'/.

,

_ The second violation was issued for operations personnel falling to follow procedures for racking-

.

out a safety-related breaker, for the out-of-service program, a'W for discrete component -

i

operations. As a consequence, the operators did not maintain correct control of equipment and

temporarily made the emergency diesel generator inoperable. - The NRC is issuing a violation for

these because two of the examples were identified by the inspectors, and the third was similar to -

^

}

one of the contributing factors of the July 1997 feedwater transient.

_

'

The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are described in detail in the subject inspection report. You are

required to respond to this letter and should follow the instructions specified in the enclosed

3

Notice when preparing your response. The NRC will use your response, in part, to determine

,

whether further enforcemer;t action is necessasy to ensure compliance with regulatory

requirements.

i

i

'

971P.160047 971204

~

PDR

ADOCK 05000010

b

'

, ,

~

.

.

.

,.

- .

. . - - . -

. . . -

.- . .-. . - ..--.-

- ...- - - .. - .

.

.

- -.

~

02

!

J. Perry

' in accordance w;th 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

. enclosures, and your response will be placed in the NRC Public Document Room.

-

Sincerely, -

.

/s/ G. -E. Grant.

,

Geoffrey E. Grant. Director

l'

Division of Reactor Projects

Docket Nos.50-010;50-237; 50 249

'

1

License Nos. DPR-02; DPR 19; DPR-25

' Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-010/97019(DRP);

50 '.67/97019(DRP);

.

,

[

50-249/97019(DRP)

cc w/encis:

O. Kingsley, Nuclear Generation Group

Distribution:

President and Chief Nuclear Officer

Docket File w/end

'

M. Wallace, Senior Vice

OC/LFDCB w/ enc'

President, Corporate Services

PUBLIC IE-01 w/enci

'

E. Kraft, Vice President

A. Beach w/end

BWR Operations

Deputy RA w/ond

1'

Liaison Officer, NOC BOD

Rlli Enf. Coord, w/enci

D. A. Sager, Vice President,

SRI Dresden w/enci

'

Generation Support

PM, NRR w/enci

,

D. Farrar, Nuclear Regulatory

PM, Unit 1, NRR w/enci

Services Manager

DRP w/enci

,

1. Johnson, U ensing

TSS w/enci

-

Operations Manager

DRS (2) w/enci

Document Control Desk-Licensing .

Rlli PRR w/enci

T Nauman, Station Manager Unit 1

RAC1 (E-Mail)

2-

M. Heffley, Station Mauger Units 2 and 3

CAA1 (E-Mail)

F, Spangenberg, Reg .latory Assurance

DOCDESK (E-Mail

.

Manager .

Richard Huboard

-

Nathan Schloss, Economist.-

Office of the Attomey General

.

State Liaison Officer

Chairman, Illinois Commerce .

Commiselon

i-

DOCUMENT NAME: .G:\\DRES\\DRE97019.DRP SEE PREVIOUS CONCURRENCE

7.

  • .. n.ew.

m.we

w

wc.e.n.w

,

r . c n .w,

'

-

v . m.

OFFICE

Rlli-

l

Alli -

l-

Rlli

l

Rlli

l-

!

NAME-

Lerch\\et -

Ring

Gavula

Grant (RQ

DATE

12/ /47

12/ /97

12/ /97

\\E M \\(-l

'

OFFICIAL RECORD COPY

'

.

4

i

_-

_

-

-

_ _ - - _ _

-

.

. - .

-

-

J. Pony

-2-

.

station has improved, the operations staff continues to be challenged by equipment deficiencies

l

that frequently place them in a reactive mode,

4

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

/s/ G. E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.50-010; 50-237; 50-249

!

License Nos. DPR-02; DPR 19; DPR-25

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-010/97019(DRP);

50-237/97019(DRP);

50-249/97019(DRP)

cc w/ancis:

O. Kingsley, Nuclear Generation Group

Distribution:

President and Chief Nuclear Officer

Docket File w/enci

M. Wallace, Senior Vice

OC/LFDCB w/enci

President, Corporate Services

PUBLIC IE-01 w/enci

E. Kraft, Vice President

A. Beach w/ encl

BWR Operations

Deputy RA w/ encl

Liaison Officer, NOC-BOD

Rill Enf. Coord. w/enci

D. A. Sager, Vice President,

SRI Dresden w/enci

Generation Support

PM, NRR w/enci

D. Farrar, Nuclear Regulatory

PM, Unit 1, NRR w/enct

Services Manager

DRP w/ encl

1. Johnson, Licensing

TSS w/enci

Operations Manager

DRS (2) w/ encl

Document Control Desk Licensing

Rlli PRR w/ encl

T. Nauman, Station Manager Unit 1

RAC1 (E-Mail)

M. Heffley, Station Manager Units 2 and 3

CAA1 (E-Mai:)

F, Spangenberg, Regulatory Assurance

DOCDESK (E-Mail

Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

State Liaison Officer

Chairman, Illinois Commerce

Commission

DOCUMENT NAME: G:\\DRES\\DRE97019.DRP

To feceive a copy of ttdo docu,nont. Indcate in the boa *C' = Copy vdthout attachment /encloewe *E' = Copy with attachment / enclosure

  • N* = No copy

OFFICE

Rill

N

Rlll

!

Rlli

/t/ Rill

l

,

l

NAME

Lerch\\et W M

Ring / / % t.-

Gavuta W

Grant (itG

DATE

11/tG97

11/k/97

11/.'J/9'i '

\\7 M () O

'

OFFICIAL RECORD COPY'

l -

__