e-JUL 151996 Docket No. 50-289 MEMORANDUM FOR: Harry Kister, Chief Projects Branch No. 1 FROM:
Allen R. Blough, Chief Reactor Projects Section IA
SUBJECT:
TMI-1 STATUS REPORT FOR THE PERIOD JULY 3 - 11, 1986 Enclosed is the TMI-1 weekly status report from the NRC Resident Office at TMI-1 for the subject period. The NRC staff continued to monitor routine plant operations at full power.
TMI-1 status reports are intended to provide NRC management and the public with highlights from an NRC regulatory perspective of TMI-1 activities for the previous week.
Subsequent inspection reports will address many of these topics in more detail.
~
Origina1 Signed By:
Allen R. Blough, Chief Reactor Projects Section IA Branch 1, DRP
Enclosure:
As stated cc w/ enclosure.
F. Miraglia, NRR W. Travers, NRR J. Thoma, NRR J. Partlow, IE T. Gerusky, BRP/ DER, Commonwealth of Pennsylvania-R. Benko, Governor's Office of Policy, Commonwealth of Pennsylvania Tiil Alert Susquehanna Valley Alliance Friends & Family of TMI 1
Public Document Room Local Public Document Room 8607210075 860715 DR ADOCK 05000289 PDR OFFICIAL RECORD COPY TMI-1 WEEKLY STATUS REPORT -
11/29/80 JTEE051
}
(?
2.
Harry Kister 2
bec w/ enclosure:
K. Abraham, RI P. Lohaus, RI R. Starostecki, RI H. Kister, RI R. Conte, RI (20 cys)
W. Baunack, RI s -
Region I Docket Room (w/ concurrences)
I i
I T
y M
h :DRP RI:DRP RI:Q RI
- Conte, Blough
' Kister ppL
)
7/11/86 7/// /86 7//4/86 i
3
6 ENCLOSURE TMI-1 STATUS REPORT FOR THE PERIOD JULY 3 - 11, 1986 1.
Plant Status As of 8:00 a.m. on July 11, 1986, TMI-1 was operating at 100 percent power and at normal reactor coolant temperature (579 F) and pressure (2155 psig).
2.
Facility Operations Summary At the start of the period, the plant was operating at 100 percent power and continued to operate at 100 percent during the reporting period.
No significant operational problems were identified during the report period.
3.
Items of Special Interest There were no items of special interest from a regulatory perspective.
4.
NRC Staff Status During the Period During this report period work veek, the NRC staff on site consisted of the senior resident inspector and one resident inspector.
They were as-sisted by a region-based inspector.
The other two resident inspectors were on military / annual leave through most of this report period.
The NRC staff at TMI-1 was comprised of the following personnel during the period:
W. Baunack, Project Engineer R. Conte, Senior Resident Inspector C. Hix, Secretary D. Johnson, Resident Inspector