. _ _ _ _ _ _ _

Februar) 6, 1998 Mr. J. E. Cr:ss President Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077

SUBJECT:

CHANNEL CAllBRATION OF NEUTRON FLUX CHANNELS, BEAVER VALLEY POWER STATION, UNIT NOS.1 AND 2

Dear Mr. Cross:

It has recently been brought to our attention that Duquesne Light Company's (DLC's) ongoing review of technicel specification (TS) surveillance requirements has identified certain i

l inconsistencies in the channel calibration requirements applicable to the neutron flux channels in the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) TSs. The TS definition of channel calibrations requires that channel calibratior.s shall include the sensors.

DLC's review has noted an inconsistency in that the channel calibration requirements for the t

Power Range, Neutron Flux High Setpoint includes a notation (notation 6) to the effect that the neutron detectors may be excluded from channel calibration. However, the other neutron flux l

channels do not include this notation.

l Our review has determined that neutron detectors were not intended to be included in the channel calibrations of any of the neutron flux chwanels at BVPS-1 or BVPS-2 since it would be impractical to perform a channel calibration that would include the neutron detectors. We have concluded that the failure to include notation 6 in the channel calibration surveillance requirements of the other neutron flux channels was an oversight, which should be corrected by prompt submittal of a license amendment. We also note that exclusion of the neutrori detectors from the channel calibration requirements for all neutron flux channels is included in the NRC's

" Improved Standard Technical Specifications for Westinghouse Plants," (NUREG-1431, Revision 1).

Please contact the NRC Project Manager for BVPS-1 and BVPS-2, Donald S. Brinkman, at (301) 415-1409, if you have any questions regarding this issue.

Sincerely, J. Stolz /s/ for John A. Zwolinski, Acting Dire:: tor Division of Reactor Projects - t/II Office of Nuclear Reactor Regulation Docket Nos. 50-334/50-412 cc: See next page t

D P, L l h DISTRIBUTION Docket File WBeckner

,om PUBLIC JWermiel PDI 2 Reading OGC JZwolinski ACRS mn JStolz CHeht, RGN-l ec ["1 r r"-- b UDgy mg 1 M OOO E d b W DBrinkman PEselgroth, RGN-l M

MO'Brien her wo OFFICE PDI 2/PM PDI-2/LA OTSB/BC, HICE}/BC RDI-2/D DRPE/D f,,,

e NAME DBrinkmaNrhJMO'bb WBecYne JWhiel klz I

k mo DATE L / 4 /98 M / k/98 h /b/98 Z /6 /98 1/ b/98 1/b98 OFFICIAL RECORD COPY DOCUMENT NAME: BVCHANN. GEN g

,. 3.,

- i.

.e a

s g.?

Mtog y

y t

UNITED STATES i

j NUCLEAR RECULATORY COMMISSION

's

'e WAsHINGTuN, D.C. $ma =1

,,,,,8 February 6, 1998 Mr. J. E. Croes President Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077

SUBJECT:

CHANNEL CAllBRATION OF NEUTRON FLUX CHANNIELS, BEAVER VALLEY POWER STATION, UNIT NOS.1 AND 2 Dear Mr. Cross-it has recently been brought to our attention that Duquesne Light Company's (DLC's) ongo review of technical specification (TS) surveillance requirements has identified certain incor.sistencies in the channel calibration requirements applicable t') the neutron flux channels in the Beaver Val;ey Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) TSs. The TS definition of channel calibrations requires that channel calibrations shallinclude the sensors.

DLC's review has noted an inconsistency in that the channel calibration requirements for the Power Range, Neutron Flux High Setpoint includes a notation (notation 6) to the effect that the neutron detectors may be excluded from channel calibration. However, the other neutron flux channels do not include this notation.

Our review has determined that neutron detectors were not intended to be int'lude channel calibrations of any of the neutron flux channels at BVPS-1 or BVPS-2 since it would be impractical to perform a channel calibration that would include the neutron detectors. We '

concluded that the failure to include notation 6 in the channel calibration surveillance requirements of the other neutron flux channels was an oversight, which shou;d be correcte prompt submittal of a license amendment. We also note that exclusion of the neutron detectors from the channel calibration requirements for all neutron flux channels is included in the NRC's

" Improved Standard Technical Specifications for Westinghouse Plants,"(NUREG-1431 Revision 1).

Please contact the NRC Project Manager for BVPS-1 and BVPS-2, Donald S. Bnnkman, at (301) 415-1409, if you have any questions regardhg this issue.

Sincerely, Y//

( J hn A. Zwolinski, Act g ector ivision of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation Docket Nos. 50-334/50-412 cc: See next page A

,./

D J. E. Cross Beaver Valley Power Station, Units 1 & 2 Duquesne Light Company cc:

Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge Pennsylvania Department of 2300 N Street, NW.

Environmental Resources Washington, DC 20037 ATTN: Michael P. Murphy Post Office Box 2063 Director-Safety and Licensing Harrisburg, PA 17'120 Department (BV-A)

Duquesne Light Company Mayor of the Borrough of Beaver Valley Power Station Shippingport PO Box 4 Post Office Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner Roy M. Smith West Virginia Department of L6bor Regional Administrator, Region i U.S. Nuclear Regulatory Commission l

Building 3, Room 319 475 Allendale Road Capitol Cumplex King of Prussia, PA 19406 Charleston, WVA 25305 Resident inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 29B 180 East Broad Street Shippingport, PA 15077 Columbus, OH 432fS-0573 Director, Pennsylvania Emergency Duquesne Light Company Management Agency Beaver Valley Power Station Post Office Box 3321 PO Box 4 Harrisburg, PA 17105-3321 Shippingport, PA 15077 ATTN: S. C. Jain, Vice President Ohio EPA-DERR Nuclear Services (BV-A)

ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Co nmittee Sierra Club 433 Orlando Avenue State College, PA 16803 Duquesne Light Company Beaver Valley Power Station PO Box 4 Shippingport, PA 15077 ATTN: R. L. Grand, Divie ae President, Nuclear Opera,.-

! oup and Plant Manager (BV-SC r,

~