Forwards Revised Rev 24 to Emergency Plan Implementing Procedure EP 7.0, Emergency Facilities & Equipment. Two Copies of Tables 7-1,7-2 & 7-3 Inadvertently Issued in Rev 24
ML20203B002
Person / Time
Site: Point Beach  
Issue date: 07/10/1986
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20203B006 List:
References
CON-NRC-86-66 VPNPD-86-303, NUDOCS 8607170384
Download: ML20203B002 (1)


Text

.

I Wisconsin Electnc roara couessr 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 VPNPD-86-303 NRC-86-66 July 10, 1986 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention:

Mr. J. W. Miller, Chief Operating Reactors, Branch 3 Gentlemen:

DOCKETS 50-266 AND 50-301 EMERGENCY PLAN PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Gentlemen:

Enclosed are three copies of revisions to the Point Beach Nuclear Plant Emergency Plan Procedures.

These revisions consist of replacing EP 7.0, " Emergency Facilities and Equipment", Revision 24, which was inadvertently issued with two copies of Tables 7-1, 7-2, and 7-3.

We regret any inconvenience this may have caused you.

Very truly yours, C. W. gay Vice President Nuclear Power Enclosures Copies to NRC Resident Inspector Incident Response Center, Region III f