Davis Besse Nxlear P,wer Staten a
$501 North State Route ?
m Oak Harter Oro43449 9:00 7
.lohn K. Wood 419 249 M30 Vco l'rvsorkvst b aclear far 4'9 3218337 Docket Number 50-346 License Number NPF-3 Serial Number 2513 February 18, 1998 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
- Semiannual Fitness For Duty Report, July - December,1997 Ladies and Gentlemen:
Pursuant to 10 CFR 26.71(d),"RecoiCeeping Requirements," Toledo Edison submits its semiannual Fitnest For-Duty (FFD) report for the period of July through December 1997 for the Davis Besse Nuclear Power Station, Unit 1. provides Toledo Edison's FFD Program Performance Data. Attachment 2 novides a summary of management actions taken by Toledo Edison based on positve FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.
Should you have any questions or require additional information, please contact Mr. James L.
Frects, Manager - Regulatory Affairs, at (419) 321-8466.
Since ly, C,#
I TK/s
-I Attachraents ec:
A. G. Ilansen, NRC Project Manager A. B. Beach, Regional Administrator, NRC Region til S. J. Campb.;ll, DB 1 Senior Resident inspector Utility Radiological Safety Board R R l'E H WR 9002240169 990219
- '^*c DR ADOCK 03000346 PDR
Dockct Number 50 346 License Number NPF 3 Serial Number 2513 Attachment.1 Toledo Edison Fitness For Duty Report July - December 1997 4
. ~ - -.,, _.,... - -,
Dock:t Numb:t 50 346 Lic:ns? Number NPF 3 Serial Number 2513 Fitness for Duty Program Performance Data Personnel Subject to 10CFR T.6 Toledo Edison December 31.1997 Company 6 Months Ending Davis-Gesse (419)321 8466
' ocation Phone J L Freets. Manaaer Reaulatory Affairs Contact Name Qutoffs Screen / Confirmation (nalml)
Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Oplates 300/300 Alcohol (%BAC) 0.04 Long Term Short Term Testing Results Licensee Emoloyees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 774 0
71
~ #
Categories Tested Positive Tested Positive Tested Positive Pre-Access 13 0
64 4
Post Accident 0
0 0
0 Observed Behavior 1
1 4
0
~
Random 212 0
7 1
Follow-up 5
0 1
0 Other 100 0
1 0
Total 331 1/1 77 4/5 Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Optates Amphe-Phency.
Alcohol Refusal tamines clidine to test Licensee Employees 0
0 0
0 0
1 0
~
Long Term Contractors 0
0 0
0 0
0 0
Short-Term Contractors 4
0 0
0 0
1 0
Total 4
0 0
0 0
2 0
6
4 Docket Number 50-346 o
License Number NPr 3 Serial Number 2513 TOLEDO EDISON MANAGEMENT ACTIONS RELATING TO FITNESS FOR DUTY Toledo Edison Contractor Personnel Personnel Referred to EAP 1
N/A Management Sanctions 1
5 Toledo Edison does not perform onsite initial..ug screening tests; therefore there are no unconfirmed positive results on w hich to base management actions.
TOLEDO EDISON FITNESS-FOR DUTY REPORTS There were no Fitncss-For Duty reports submitted during this reporting period (July - December 1997).