ML20203A731

From kanterella
Jump to navigation Jump to search
Ack Receipt of Topical Rept EMF-92-116(P), Generic Mechanical Design Criteria for PWR Fuel Designs
ML20203A731
Person / Time
Issue date: 02/02/1999
From: Frank Akstulewicz
NRC (Affiliation Not Assigned)
To: Mallay J
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20203A724 List:
References
TAC-M84245, NUDOCS 9902100087
Download: ML20203A731 (1)


Text

..

. _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ , _ _ - _ _ _ _ - - - _ _ - _ - _ _ _ _ _ _ _ _ = _ _ _ _ _ _ _ _ _ _

Kat j 4 UNITED STATES

5 NUCLEAR REGULATORY COMMIS810N WASHINGToM, D.C. asseHeet

%, * * * *

  • February 2, 1999 Mr. James F. Mallay, Director Regulatory Affairs Siemens Power Corporation 2101 Hom Rapids Road '

- P. O. Box 130 Richland, WA 99352-0130

SUBJECT:

ACCEPTANCE FOR REFERENCING OF SIEMENS POWER CORPORATION TOPICAL REPORT EMF-92-116(P): " GENERIC MECHANICAL DESIGN CRITERIA FOR PWR FUEL DESIGNS,"(TAC NO. M84245) 4

Dear Mr. Mallay:

The staff has reviewed the subject report submitted by Siemens Power Corporation (SPC) by letter c' Tugust 3,1992, and your responses dated June 29, August 23, and November 16, 1994, January 31 and October 12,1995, June 30,1997, and January 14,1998, to our requests for additionalinformation. On the basis of our review, the staff has found the subject report to be acceptable for referencing in license applications to the extent specified and under the limitations stated in the enclosed report and U.S. Nuclear Regulatory Commission (NRC)-

technical evaluation. The evaluation defines the basis for acceptance of the report.

The staff will not repeat its review of the matters described in SPC Topical Report EMF-92-11E(P) and found acceptable when the report appears as a reference in license applications, except to ensure that the material presented applies to the specific pla'nt involved.

NRC' acceptance applies only to the matters described in SPC Topical Report EMF-92-116(P).

In accordance with procedures established in NUREG-0390, the NRC requests that SPC publish accepted versions of the report, proprietary and non-proprietary, within 3 months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract and an -A (designating accepted) following the report identification symbol.

Should our acceptance criteria or regulations change so that our conclusions as to the acceptability of the report are no longer valid, applicants referencing this topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued applicability of the topical report without revision of their respective documentation.

Sin rely,

,}

kst eting Chief Generic issues and Environmenta ojects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation

Enclosures:

SPC Topical Report EMF-92-116(P) Safety Evaluation 9902100087 990202 PDR TOPRP EMVEXXN C PDR  ;

- _ - _ _ _ _ _ _ _ _ _ .