ML20203A426

From kanterella
Jump to navigation Jump to search
Informs of Arrangements Made with Frantz Re Operator Licensing Exam.Written Exam Scheduled for Wk of 990503. Forwards Ref Matl for RO & SRO Licensing Exam,Administration of Written Exam & Procedures & Facility Review of Exam
ML20203A426
Person / Time
Site: Reed College
Issue date: 02/04/1999
From: Isaac P
NRC (Affiliation Not Assigned)
To: Koblik S
REED COLLEGE, PORTLAND, OR
References
NUDOCS 9902100001
Download: ML20203A426 (12)


Text

,

., ., . . _ _ _4 . ,

1

% ; j '. m.

ye

) .

  • /

pt@ If '!

p[

p' W UNITED STATES s j-2 NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20566-0001

          • ,o February 4, 1999 Dr. Steven S. Koblik, President Reed College 3203 SE Woodstock Blvd.

Portland, Oregon 97202

Dear Dr. Koblik:

I made arrangements with Mr. Stephen Frantz, for the administration of operator licensing examinations at the Reed College reactor. The written and operating examinations are scheduled for the week of May 3,1999, in order to meet this schedule, please furnish the material listed in Enclosure 1, " Reference

= Material for Reactor / Senior Reactor Operator Lice'nsing Examinations" at least 60 days l prior,to the examination date to the following address:  ;

(U.S. Postal Service) (Overnight Delivery)

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission

-ATTN: Patrick Isaac ATTN: Patrick Isaac Mail Stop O-11 D-19 Mail Stop O-11 D-19 Washington, D.C. 20555 11555 Rockville Pike Rockville, MD 20852-2738 r- You are responsible for providing adequate space for proper conduct of the written-examination. Enclosure 2, " Administration of Written Examinations," describes our proce'ss for conducting these examinations.

. Enclosure 3 contains the Rules and Guidelines that will be in effect during the administration of the written examination. Please ensure that all applicants are aware of these rules.

. Your. review of the written examination will be conducted in accordance with the procedures specified in Enclosure 4, " Facility Review of Written Examinations."

Final, signed rbactor operator and senior reactor operator (icense applications certifying { ,

'that all training has been completed must be submitted at least.14 days before the first , g\

examination dates so that we will be able to review the training and experience of the LT s

' candidates, process the medical certifications, and process the applications, if our review V 1 cannot be completed in time to make a determination of applicant eligibility, the candidate

. may not be permitted to sit for the examination. Therefore, it is recommended that

. license applications be provided as soon as possible to ensure an appropriate level of review. ,

Q & U 9902100001 990204 E PDR ADOCK 05000280

, 1

Dr. Koblik February 4, 1999

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30,2000. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per msponse, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the information and Records Management Branch, T-6 F-33, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1019, or Internet e-mail pxi@nrc. gov. I l

Sincerely, l ORIGINAL SIGNED BY:

Patrick Isaac, Chief Examiner Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management ,

Office of Nuclear Reactor Regulation l Docket No. 50 288  !

l

Enclosures:

1. Reference Material for Reactor / Senior Reactor Operator Licensing Examinations
2. Administration of Written Examinations y
3. Procedures for Administration of Written Examinations j
4. Facility Review of Written Examinations

.c. I cc w/ enclosures: Mr. Stephen Frantz, Reed College

. DISTRIBUTION w/encis: DISTRIBUTION w/o encls.

Central Files SWeiss i l

PUBLIC MMendonca, PM

.' Docket File 50-288 PDND r/f Facility File (DMcCain)

DOCUMENT NAME: G:\SECY\lSAAC\ REED 90

. Te receive a copy of this document. Indicate in the bout "C' = Copy without attachrnent/ enclosure 'E' = Copy with attach.nent/ enclosure 'N' = No copy OFFICE PDND:N, lC HOLB,:LA 6 l .E PDND:M ,/ l_ l l NAME Pisaac [ l DMII) SWeissMW DATE 02/01/9h ~ 02/ %99 02 4 /99 OFFICIAL REdORD COPY

W Dr. Koblik February 4, 1999 This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30,2000. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the information and Records Management Branch, T-6 F-33, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1019, or Internet e-mail pxi@nrc. gov.

Sincerely, ORIGINAL SIGNED BY:

Patrick Isaac, Chief Examiner Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-288

Enclosures:

1. Reference Material for Reactor / Senior Reactor Operator Licensing Examinations
2. Administration of Written Examinations
3. Procedures for Administration of Written Examinations
4. Facility Review of Written Examinations cc w/ enclosures: Mr. Stephen Frantz, Reed College

. DISTRIBUTION w/encls: DISTRIBUTION w/o encls.

Central Files SWeiss PUBLIC MMendonca, PM Docket File 50-288 PDND r/f Facility File (DMcCain)

DOCUMENT NAME: G:\SECY\lSAAC\ REED 90 T* r c4 e a copy of this document, indicate in the box: *C' = Copy without attachrnent/ enclosure "E" = Copy with attachrnent/ enclosure 'N' = No copy OFFICE PDND:([E), lC HOLB;LA El4 PDND:p[//), / l l l NAME Pisaac [ ' D@pr)'l SWeiss tNU DATE 02/01/9h 02/'h99 02 6 /99 _

OFFICIAL REdORD COPY f

[

l l

l l ,

Dr. Koblik I This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30,2000. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the information and Records Management Branch, T-6 F-33, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1019, or Internet e-mail pxi@nrc. gov.

Sincerely,

&?* v atrick is , Chief Examiner Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-288

Enclosures:

1. Reference Material for Reactor / Senior Reactor Operator Licensing Examinations
2. Administration of Written Examinations
3. Procedures for Administration of Written Examinations
4. Facility Review of Written Examinations cc w/ enclosures: Mr. Stephen Frantz, Reed College

. __. -_ . _. . . . . -_ . . . ~ _ .. . . . . . . . -

.____.m.__... _ _ _

~'

p. ,

f ( e .r

, iReed College - Docket No. 50-288 1

s

  • cc:. '

Mayor of City of Portlandt

-1220 Southwest 5th Avenue -

' Portland, OR 97204 =

' David Stewart Smith, Administ'ator '

! Oregon Office of Energy _

Energy Resources Division .

625 Marion Street, NE

, Salem, OR 97310 I.

+

a a

u

t.

.-?

l l

5 - _

. - ,. - - . . - , e r

w I

REFERENCE MATERIAL FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS (NON-POWER) l

?

1. Existing learning objectives, students handouts and lesson plans (including training  !

manuals, plant orientation manual, system descriptions, reactor theory, '

thermodynamics, etc.)

1 Training materials should include all substantive written material used for preparing i i

applicants for initial RO and SRO licensing. The written material should include 1

learning objectives if available and the details presented during lectures, rather than outlines. Training materials should be identified, bound, and indexed. Training materials which include the following should be provided:

l l

System descriptions including descriptions of all operationally relevant flow l paths, components, controls and instrumentation. System training material should draw parallels to the actual procedures used for operating and applicable system.

Complete and operationally useful descriptions of all safety-system interactions, secondary interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.

Training material used to clarify and strengthen understanding of emergency operating procedures.

2. Complete Procedure Index (including temporary procedures).

l 3. All administrative procedures as applicable to reactor operation or safety.

4. Allintegrated plant procedures, normal or general operating procedures and procedures for experiments.

S. All emergency procedures, emergency instructions, abnormal or special procedures.

l l

6. 5tanding orders or procedures changed by reactor supervision and important orders L or changes that are safety related and may supersedo the regular procedures.

L

7. Applicable procedures (procedures that are run frequently).
6. Fuel-handling and core-loading procedures and initial core-loading procedure, when appropriate.
9. Any annunciator / alarm procedures, as applicable.

ENCLOSURE 1 l

9

10. Radiation protection manual, radiation control manual or procedures.

.11. Emergency plan implementing procedures.

12.- Safety Analysis Report, Technical Specifications and interpretations, if available.

13. System operating procedures, including experiments.
14. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams, as applicable.

1 52 Technical Data Book, and/or plant curve information as used by operators and facility precautions, limitations, and set points for the facility.

16. Questions and answers specific to the facility training program which may be used in the written or operating examinations (voluntary by facility licensee).
17. Additional material as requested by.the examiners to develop examinations that meet the requirements of the Non-power Reactor Examiner Standards and Regulations.

The above reference material should be approved finalissues and so marked, if a facility has not finalized some of the material, the Chief Examiner should verify with the facility that the most complete, up-to-date material is available and that agreement has been

-reached with the licensee for limiting changes before the administration of the examination.

ADMINISTRATION OF WRITTEN EXAMINATIONS

1. A single room must be provided for administration of the written examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility personnel during the written examination.
2. Minimum spacing is necessary to ensure exemination integrity as determined by the Chief Examiner (i.e., one applicant per table, with a three-foot space between tables).
3. Acceptable arrangements should be made by the facility if the applicants are to have lunch, coffee or other refreshments. These arrangements shall comply with item 1 above and must be reviewed by the examiner and/or proctor.
4. The facility licensee provides pads of 81/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination. The examiner distributes these pads to the applicants as needed.
5. Applicants may bring pens, pencils, calculators or slide rules into the examination room. Only black ink or dark pencils should be used for writing answers to questions.
6. No wall charts, models, and/or other training materials can be presert in the examination room. No other equipment or reference material will be allowed unless provided by the examiner.

7 .~ The facility staff is provided with a copy of the written examination and answer key af ter the last candidate has handed in his written examination. The facility staff will then have five (5) working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner.

l ENCLOSURE 2

l l

l l

PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS l

1. Verify candidate identity.
2. Pass out examinations and all handouts. Remind applicants not to review examination untilinstructed to do so.

' READ THE FOLLOWING INSTRUCTIONS VERBATIM:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have not received or given assistance in completing the examination. This must be done after you complete the examination.

READ THE FOLLOWING INSTRUCTIONS:

1. Restroom trips are to be limited and only one applicant at a time may leave. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of cheating.
2. Use black ink or dark pencil only to facilitate legible reproductions.
3. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
4. Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
5. Before you turn in your examination, consecutively number each answer sheat.
6. The point value for each question is indicated in [ brackets] after the question.
7. If the intent of a question is unclear, ask questions of the examiner only.
8. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition, turn in all scrap paper.
9. Ensure allinformation you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediatel/ following the examination.

ENCLOSURE 3

. , , . .- . ..~ . . .. . .. .

- . - . . ~ . , - - - . .. -

3. ,

2-

)

10. To pass the examination, you must achieve a grade of 70 percent or greater in each category. . j l

H- ~ 11. There is a time limit of three (3) hours for compleiien e the examination. l 1

12. When you have completed and turned in your examination, leave the examination 1

[: area (DEFINE THE AREA). If you~are observ'ed in'this area while the examination is ,

still in progress, your license may be donied.or revoked. l 1

I

)

1 t

t

)

1 1

1 l

1 j'.

6 l

-: i 1

1 i

l ' ' .

i.

< t j

> 1

' l i

ENCLOSURE 3  ;

).$,- . ,, x

's si. s s 4 .. ,,,

t FACILITY REVIEW OF WRITTEN EXAMINATIONS c

1. At the option of the Director, Non-Power Reactor and Decommissioning Project Directorate (PDND), the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or at an NRC office. The Chief Examiner will coordHate the details of the review with the facility.

An NRC examiner will always he present during the review. The examination or written notes will NOT be retained by the facility.

Whenever this option of examination review is utilized, the facility reviewers will sign the following statement prior to being allowed access to tht examination.

1

a. Pre-Examination Security Agreement {

l I acknowledge that I have acquired specialized knowledge l concerning the examination scheduled for at l as of the date of my signature below. I agree that I will not I knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.

Signature /Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.

b. Post-Examination Security Agreement I did not, to the best of my knowledge, divulge any information concerning the examinations administered during the week of

_ at or any instruction to those applicants who were administered the exami,ution from the date i entered into this security agreement until the completion of examination administration.

Signature /Date ENCLOSURE 4

l l

l l

1 l

2. Regardless of whether the above examination review option is exercised, immediately )

following the administration of the written examination, the facility staff is provided a i marked-up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes made to questions during the examination i administration.

If the facility did not review the examination prior to its administration, they will have  ;

five (5) working days from the day of the written examination to submit formal I comments. If the facility reviewed the examination prior to its administration, any 1 additional comments must be given to an examiner prior to his/her leaving the '

facility. These comments will be addressed to the Chief Examiner by the Reactor Supervisor. Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case basis. This may cause delays in grading the examinations.

3. The following format should be used for submittal of specific comments:
a. Listing of NRC question, answer and reference
b. Facility comment / recommendation
c. Reference (to support facility comment)

NOTES: 1. No change to the examination will be made without submittal of a reference to support the facility comment. Any supporting documentation that was not previously supplied, should be provided.

2. Comments made without a concise facility recommendation will not be addressed.
4. A two-hour post examination review may be held at the discretion of the Chief l Examiner, if this review is held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.