UNITED STATES
}
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. Sue 664001
%,...../
NORTHEAST NUCLEAR ENERGY COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY AND WESTERN MASSACHUSETTS ELECTRIC COMPANY DOCKET NO. 50-336 MILLSTONE NUCLEAR POWER STATION. UNIT 2 b
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 212 License No. DPR-65 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment filed by Northeast Nuclear Energy Company, et al. (the licensees) dated September 3,1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulation *;
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and ali applicable requirements have been satisfied.
9902230302 980123
~
PDR ADOCK 05000336 P
2.
Accordingly, the license is amended to authorize changes to the Updated Final Safety Analysis Report and add paragraph 2.C.(5) to Facility Operating License No. DPR-65 as follows:
(5)
Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 212, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the additional conditions.
3.
The license amendment is effective as of its date of issuance to be implemented within 30 days from the date of its issuance. Implementation of the amendment is the incorporation in the Updated Final Safety Analysis Report of the changes to the description of the facility as described in Attachment 3 of the licensee's application dated September 3,1997, and the staff's Safety Evaluation attached to this amendment.
FOR THE NUCLEAR REGULATORY COMMISSION i
Phillip F. McKee Deputy Director for Licensing Special Projects Office Office of Nuclear Reactor Regulation Attachments:
- 1. Pages 4 and 5 of the license
- 2. Appendix B - Additional Conditions Date of Issuance:
January 23, 1998 l
1 Pages 4 and 5 are attached as a convenience for the composite license to reflect this change.
i-
- A 4
j.
'(3)
Fire Preiectiori f
. The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report and as approved in the SER dated September 19,1978, and supplements dated October.
21,1980, November 11,1981, October 31,1985, April 15,1986, January 15, 1987, April 29,1988, July 17,1990, and November 3,1995, subject to the I
following provisions.
i i
The licensee may make changes to the approved Fire Protection Program without i
prior approval of the Commission only if those changes would not adversely affect -
the ability to achieve and maintain safe shutdown in the event of a fire.
(4)
Physical Protection The licensee shall fully implement and maintain in effect all provisions of the j
Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to 4
' provisions of the Miscellaneous Amendments and Search Requirements revisions i
to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).' The plans, which contain Safeguards information l
protected under 10 CFR 73.21, are entitled: " Millstone Nuclear Power Station Physical Security Plan," with revisions submitted through March 29,1988;
" Millstone Nuclear Power Station Suitability, Training and Qualification Plan," with revision submitted through July 21,1986; Millstone Nuclear Power Station Safeguards Contingency Plan," with revisions submitted through October 30,
+
1985. Changes made in'accordance with 10 CFR 73.55 will be implemented in j.
accoroance with the schedule set forth therein.-
i I
- (5)
Additional Conditions j;
The Additional Conditions contained in Appandix B, as revised through Amendment No. 212 are hereby incorporated in the license. The licensee shall j
operate the facility in accordance with the additional conditions.
d i:
}
Amendment No. (J,75,197, i
Att,AGA,212 i
l-l
. l (6)
Relocated Technical Soecifications The licensee shall relocate certain technical specification requirements to licensee-controlled documents as described below. The location of these requirements shall be retained by the licensee.
a.
This license condition approves the relocation of certain technical specification requirements to licensee-controlled documents (Technical Requirements Manual), as described in the licensee's application dated May 20,1997, as supplemented on September 23,1997 The approval is documented in the staff's safety evaluation dated Nove 'ber 19,1997.
]
This license condition is effective as of its date of issuance 's i Amendment No. 210 and shall be implemented 90 days fro,n the date of issuance. Implementation shallinclude the relocation of technical specification requirements to the appropriate licensee-controlled document as identified in the licensee's application dated May 20,1997, as supplemented on September 23,1997.
D.
This amended license is effective as of its date of issuance and shall expire at midnight, July 31,2015.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by Roger S. Boyd Roger S. Boyd, Acting Director Division of Reactor Licensing Office of Nuclear Reactor Regulation
Enclosures:
- 1. Incomplete PreoperationalTest items Which Must be Completed
- 2. Change No. 4 to Technical Specifications Contained in Appendix A to DPR-65
- 3. Appendix B l
Date of issuance: September 26,1975 T'
Amendment No. 210, 212
APPENDIX B ADDITIONAL CONDITIONS FACILITY OPERATING LICENSE NO.DPR-$5 Northeast Nuclear Energy Company shall comply with the following conditions on the schedules noted below:
Amandment Implementation Number Additional Conditions Date
]
212 This amendment authorizes the licensee to 30 days from the include in the Updated Final Safety date of issuance Aralysis Report (UFSAR) changes to the description of the facility, implementation of this amendment is the updating of the UFSAR to reflect the changes in Attachment 3 of the licensee's application dated g
September 3,1997, and evaluated in the staffs Safety Evaluation dated January 23, 1998.
Amendment No. 212