Ep '
Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 February 4,1999 10 CFR 55.45(b)
U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos.50-282 License Nos. DPR-42 50-306 DPR-60 Certification of Plant-Referenced Simulator Northern States Power Company hereby certifies the Prairie Island Nuclear Generating Plant simulator as a plant-referenced simulator per the requirements of 10 CFR Part 55, Section 55A5(b). Attached, in support of this certification, are completed and signed l
NRC Form 474's and the Prairie Island Simulator Certification Report.
in this letter we have made no new Nuclear Regulatory Commission commitments.
Please contact Jack Leveille (651-388-1121, Ext. 4142)if you require additional infomation related to the certification of the Prairie Island simulator.
Joel P. Sorensen Plant Manager l
Prairie Island Nuclear Generating Plant s
ph
/\\ !'
c:(see next page) 9902090236 990204 7
PDR ADOCK 05000282 4L P
PDR w
?.'
f USNRC NORTHERN STATES POWER COMPANY February 4,1999 l
Page 2 c: Regional Administrator-Region 111, NRC l
Senior Resident inspector, NRC NRR Project Manager, NRC J E Silberg Attachments:
- 1. NRC Form 474 for Prairie Island Unit 1
- 2. NRC Form 474 for Prairie Island Unit 2
- 3. Prairie Island Simulator Certification Report l
l l
l e
L-
)
r A
i 5
NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OM5; NO. 31so 0134 LJ PtCES: 04/31/se (s-95)
Esumsted bumen per respcnse to compy we sfus mandatory informauon conecoon request 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />. This rWormanon a used.to,o,artrfy a e mulaton c
co_e,ss,oga,mng man es.. to ih. n ma,on a, Reco,os M.e-er SIMULATION FACILITY CERTIFICATION
""x"P,' Co ',h""*"ed' "*f','"'efl*150&*L'""o'%Z and Budget, waarungton, DC 23503. NRC may not conduct or sponsor, and a person a not recured to respcrid to. a conection of rwormouon iness a aispisys a ctaroney vald OMB controi number ths TRUCTIONS: The form as to De fueo for NWha! cerufmabon, McaDon (if reqtared), and for any %. to a simulabon tacMy performance tesung plan mece ener rut,as submmat of such a plan Provide the followng nWormahon and check the appropnate bom to indcate reason for submittat FACILITf DOCFET NuMtfLM Prairie Island Nuclear Generating Plant Unit 1 50--282 LICENSEE DATE Northern States Power Company 2-5-99 This is to certify that 1.
The above named facdoty hcansee 'e useg s artiutation facihty consiahng soesty of pianteforenced simulator that meets lhe requrements of 10 CFR 55.d5.
- 2. Documentauon e evensow for NF.* revsow in accorcance we 10 CFR 55 45(b).
3 This simulanon facdaty meets the puscence contamed in ANSFANS1.51985 or ANSFANS3.5-1993. as endorsed by NRC Regidatory Guide 11a9.
If inere are any EXCEPTIONS to the carufsation of this item CHECK Nt'.HE [ ] and osacnbe fully on additional pages as necessary.
hAME gor other scenpAcaDon) AND LOCATION OF SIMutATION fACIUTY,
)
Prairie Island Simulator Prairie Island Training Center 1660 Wakonade Drive West i
Welch, MN 55089 1
L,,
SIMULATION FACIUTV PERFORMANCE TEST ABSTRACTS ATTACHED (For performance fests conducfodin me penott encing mm me cate atthes corescason.)
DESCRIPTION OF PLRFORMANCE TLSTING COMPLETLD. (Attach acaDonar pages as necessary and wennty me riem GescnpDon Derng con 0nuea.)
See attached Prairie Island Simulator Certification Report.
1 SIMULATION FACfLtTY PERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct of approximatsty 25'c/perbrmance lusta peryear er me buryear penact xy, commenemy am me ante of m,s cors# canon.)
j DLSCRIPTLON OF PLRFORMANCE TLSTING TO BL CONOuCTLD Vttaca nod lDonar pages as necessary anc metery the nem coscnpaon bemy conanueo.)
See attached Prairie Island Simulator Certification Report.
PERFORMANCE TESTING PLAN CHANCE. (For any moct# canon lo a perbrmance resang plan suerrstred on a prewous cerencanon.)
DLSCR6PTION OF PLRFORMANCE TESTING PLAN CHANGL LAttaca nagaDonalpages an necessary and mentity me nem coscnpean Demg conenuec.)
All scheduled testing (annual operability and malfunction) for the years 1995,1996, and 1997 was completed as scheduled. The 1998 annua! operability testing (with the exception of Real-time testing) was conducted in Mry as a baseline for the Acceptance Test Plan for the new hardware platform. The 1998 testing of Malfunctions was to have been done in December of 1998, following completion of the ATP Due to delays in the completion of the ATP,it was not possible to finish the ATP and complete the malfunction testing as scheduled. On January 5,1999, t was decided to complete the ATP and subsequently test these malfunctions on the new platform. Because of this, a portion of the 1998 Malfunctions have been deferred to 1999. These are noted in Appendix 6 as
- deferred". Real-time testing will be conducted on the new pintform prior to declaring it Ready For Training.
RECERTIFICATION IDescnbe conectwo accone taken, attach resuus of compoeted perbomance lesbag M eccordance am 10 CFR SS 4S(b)(5)(v).
(Attach elfdbonal pages as necessary and icernfy me item GescnpDon bomp con 0nuedJ Any fame statement or omiseen m snm cocument,incluaing ettachme tts, may te subject to crvd and cnminal sancuans. I cartsfy unoer penalty of perjury that the riformaban m trus document and attachments is true e.id correct
$1 GNAT
- L - Au7 0'DR MLSENTATIVE TITLE DATE WH77mser ayn m
m._.... cF R,.
4.__a_s_._.._.o _ C..
follows BY DEUVERY IN PERSON ONE WHITE FUNT NORTH BY MAIL ADDRESSED TO-DIRECTOR, DFFICE OF NUCLEAR REACTOR REGULATION TO THE NRC OFriCE AT.
11858 RoCKVILLE PIKE U.S. NUCLEAR REGULATORY COMMISSION ROCKVILLE, MD WASH'NG*0N. DC 206854001 NR; FQHM did 6Mf5)
F NNILp QN htGYGLLp F ATLR e
r s
NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVEo SY OMa; NO. 31804138 EXPIRES: 08/3ttes Estnoted tusen per response to comply enth this mandatory informate coiseenon reeJost 120 hon TPus ydormaban a used to certsfy a saulation facday. Fonverd i
comrnerne regarding bureen.estynets to the informate and Recorcs Managemart SIMULATION FACILITY CERTIFICATION
"""*' F* rsst u 5 Nuc - Rouw.y Cenem-m. w-r.n
- t. oC 205s5 0001. mid to the Paperwork Reduchon Project (315o4138). Omco of Meegemas ed Budget. Wasningtort. DC 20$03. NRC may not corect or sponsor and a person a noi ro uned = r=,ond m. e coincuan of informouon un=es a doo ys a e,,ency
.e vehd OMC contrW number.
INSTRUCT 10Ns:
The form se to De fuso for rubas certsfcanon, recorofmeta (d regated), and for any cnenge to e simunauan faciety performance lastmg pien moos after vuual sammal of suon e piart Proviae in. foiiowng niformaim and aneck ins approo,$me hos io indicaie re. con for sutimitias.
FACiUTY DOCKET NUMBER Prairie Island Nuclear Generating Plant Unit 2 50 306 LICENSEE DATE Northern States Power Company 2-5-99 The a to casfy inee 1.
The above named facdity hcensee a using a sautaban facilsty consistmg solely of a pterweierenced snuestor that meets the requrements of 10 CFR $5.45.
- 2. Documentauon a evelaba for NRC revow m accordance wth 10 CFR 55.45(b1 3 This snutsuon facehty enests the guidance contened in ANSVANS3.5-1965 or ANSVANS 15-1993. as endorsed by NRC Regulatory Guide 1.149.
If there are any EXCEPTIONS to the cerurcanon of this dem. CHECK HERE [ ] and esecnbo fully on additional pages es necessary.
NAME for erner scenoAcaDon) AND LOCATION OF SNULATION FACILITY.
Prairie Island Simulator Prairie Island Training Center 1660 Wakonade Drive West Welche MN 55089 SwULATiON FACILITY PERFORMANCE TEST ABSTRACTS ATTACHED. (For peribnnance fests conducted m the pened ending afffs the date of ffws cerencacon.)
DESCRIPTlON OF PERFORMANCE 1ESTiNG COMPLETEO. (Attach 00$00ner pages as necessary and scenOff the Gem oescap00n peong conanued.)
See attached Prairie Island Simulator Certification Report.
$1MULATION FACIUTY PERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct of approximately 25* c/perftwmance fests per year br the bur year penod D, commenctng ufh the date of thus cerkAcehen.)
DESCRIPTION OF PERFORMANCE TESTSNG TO BE CONDUCTED (Attaca nombonalpages as necessary ano conoty the stem coscnpoon borng cononuec)
See attached Prairie Island Simulator Certification Report.
PERFORMANCE TESTING PLAN CHANGE. JFor any modArenon an e pedbemence sneeng plan suemified on a previosa cereAcatori.)
DESCRIPTION OF PERFQRMANCE TL8TlNG PLAN CHANGE (Attaca acetoner pages as necessary antiscenefy me seem oessnpean eeng cononusa.)
All scheduled testing (annual operability and malfunction) for the years 1995,1996, and 1997 was completed as scheduled. The 1998 annual operability testing (with the exception of Real-time testing) was conducted in May as a baseline for the Acceptance Test Plan for the new hardware platfctm. The 1998 testing of Malfunctions was to have been done in December of 1998, following completion of the ATP. Due to delays in the completion of the ATP,it was not possible to finish the ATP and complete the malfunction testing as scheduled. On January 5,1999, it was decided to complete the ATP and subsequently test these malfunctions on the new platform. Because of this.a poftlon of the 1998 Malfunctions have been deferred to 1999. These are noted in Appendix 6 as
- deferred". Real-time testing will be conducted on the new platform prior to declaring it Ready For Training.
RECERTIFICATION (Desenbe conoc#ve actons taken, affach susuits of complead perfbemance fes#ng in accordance esth 10 CFR 55.d5(b)(5)(v).
(Anach addibonal pages as necessary and idonefy the nem cInscorp00n bemg congnued.)
Any fame statement or omission m Ins occument, melucing attachments, may be subsect to crvil e,c anmmel sancuans. I cerufy unoer penalty of pequry inat the rWormation m rus I
document and attachments a true and correct SIGNAT
- AUTHORIZED RE ESENTATIVE TITLE DATE j
^
% J % afer MM
/
proccaramnce witn 10 CFR 65 6. Communmates, tna form snail De sammeo to the NRC as sollows.
aY DELIVERY IN PERSON ONE WHITE FUNT NORTH BY MAIL ADDRESSED TO-DIRECTOR, OFFICE OF NUCLEAR REACTOR REGULAftON TO THE NRC OFFICE AT.
11558 ROCKVILLE P!KE U.s. NUCLEAR REGUt.ATORY COMMISSION ROCKVILLE., MD l
WASH'NGTON, DC 305664 01 l
NRG M.eMM 474 g5-94 FRiNILD ON REGYaLa FAFER c
,