e OPERATING DATA REPORT DOCKET NO. 50-364 DATE July 2, 1986 COMPLETED BY J.D..Woodard TELEPHONE 120s)899-5156 OPERATING STATUS

1. Unit Name: J seph M.

Farlev - Unit 2 Notes June, 1986

1) Cumulative data since
2. Reporting Period:

2652 7-30-81, date of commer-

3. Licensed Thermal Power (MWt):

860 cial operation

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 829 872.2
6. Maximum Dependable Capacity (Gross MWe): 829.2
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 'i) Since Last Report, Give Reasons:

N/A N/A

9. Power Level To Which Restricted,If Any (/ANet MWe):

N

10. Reasons For Restrictions,If Any:

This Month Yr to.Date Cumulative

11. Hours In Reporting Period 720 4,343 43,128
12. Number Of Hours Reactor Was Critical 707.4 3,240.3 42,046.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On.Line 701.4 3,164.2 36,556.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gmts The rrol Ener;v Gene.-ted (MWH) 1.744.613 7,878,899 92,113,449

~17. Gross Electrical Energy Generated (MWH) 575,400 2,612,786 30,335,474

18. Net Electrical Energy Generated (MWH) 546,374 2,465,484 28,754,724
19. Unit Service Factor 97.4 72.9 84.8
20. Unit Availability Factor 97.4 72.9 84.8 2!. Unit Capacity Factor (Using MDC Net) 91.5 68.5 82.1 91.5 66.5 80.4
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 2.6 1.9 4.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each):

N/A N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 5/06/81 5/08/81 INITIAL ELECTRICITY 5/24/81 5/?5/81 COMMERCIAL OPER ATION 8/01/81 7/30/81 1

8607160088 860630 (9/77)

/

PDR ADOCK 05000364 R

ppg

-N JOSEPH M. FAaLEY NUCLEAa PLANT UNIT 2 O

NianirivE sunaiaY or oeEniT1oNs June, 1986 l

During the month of June, there was one unit shutdown which occurred on June 8, 1986.

Both motor-generator sets supplying power to the control rod drive systen malfunctioned. This removed the source of power to the grippers of the c3ntrol rod drive mechanisms and allowed all the i

control rods to fall into the core.

This resulted in a high negative flux rate which caused the reactor trip breakers to open. The unit returned to operation on June 9.

The following major safety-related maintenance was performed in t.e h

month of June:

1.

Miscellaneous corrective and preventive maintenance was performed on diesel generators.

1 O

.i

DOC)GT NO.

50-364

  • ,.s UNIT 2

DAH.

Juiv 9 1986 D. Woodard COMPLETED BY (205) 899-5156 TELEPHONE June 5tOtG11 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL plWe-Net)

Olwe-Net) 824 791 37 g,

829 2

13 826

- - gry

_.__..._..._..g9_.

826 3

825 4

825 a

816 5

21 8') 2 822 6

810 g

676 824 7

g g

159 24 825 824 9

209 25-10 749 26 823 819 823 Ig 27 818 821 12 821 13 798 J

684 821 14 30 682 IS 3g l

16 741 INSTRUGONS On this form:. list the svenge daily unit puwer levelin MWe Net for each cisy in ;he reporting munth. Compute to

, the neare:t whole me;2 watt.

1 (9/77)

O 1

1 x_--.--_,__,-

. -., ~

50-364 UNITSilu1 DOWNS ANDPOWER REDUCI10NS DOCKET NO.

_J.M.

Farley - Unit 2 UNIT NAME DATE July 2.

1986 REPORT MONill June COMPLETED BY l D. Woodard ~~

TELEPilONE (205) 899-5156 w.

h c

re o se No.

Dani:

E N

3$g h'k h*

b Cause & Coerective

[

hy 0

6j g]

A'8I'"' I" vcut E

$Mf N#P*II j

PICycus l(ccutscoce O-d Both mo' tor-generator (M) sets supplying power to the control rod drive system malfunctioned. This removed the source of power 006 860603 F

18.6 A

4 86-007-00 AA MG to the grippers of the control rod drive mechanisms and allowed 'all the control rods to fall into the core. This resulted in a high negative flux rate which caused the reactor trip breakers to open.

The 2A M set lost its field which caused the output voltage to go to zero. The output breaker of the 2B M set opened due to the actuation of a directional overcurrent relay (IRV). The reason for the loss of output of the 2A MG set has not been determined. The 28 M set should not have tripped. However, a plunger was found to be out of adjustment on an auxiliary relay of the IRV on the "C" phase of the 28 NG set.

This caused the output breaker on the 28 MG set to open when the 2A MG set stopped generating.

To prevent recurrence of this type of event, the IRVs on all MG sets at FNP have been checked and re-adjusted as required. The appropriate procedures will be revised to include the additional tasks necessary to check the auxiliary relays on the IRVs.

I 2

3 4

F: Fusced Reason:

Method:

Exhibia G. Insisuciions S: Scheduled A-Equipment Failuse(Explain) 1-Manual for Pseparaison of Data B. Maintenance oi Tess 2 Manual Scram.

Ent y sheces for I.iccusee C Refuchng 3 Automatic Scram.

Evens Repost (I ER) file INllREG-D Regulasmy Resmciion 4 Othes (Explain) 0161)

E-Opesator Tsaining A license Examination F Administrative 5

G Opciational Essos (1:xplain)

Exhibis 1 - Same Somee (9/77) ll Othes (Emplain)

CaiHng Address Alibims Power Comptny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPbwer treaj.m m

~

July 7,1986 i

Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the June 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Your very trul,

R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)