Monthly Operating Rept for June 1986
ML20202G576
Person / Time
Site: Farley 
Issue date: 06/30/1986
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8607160006
Download: ML20202G576 (5)


Text

.

OPERATING DATA REPORT DOCKET NO.

50-348 DATE July 2,'1986 COMPLETED BY J.D. Woodard TELEPHONE (205)399-5156 s

OPERATING STATUS Notes

1. Unit Name:

Joseph M. Farlev - Unit 1

1) Cumulative data since June, 1986
2. Reportug Period:

12-1-77, date of commercial

3. t 'mW Thermal Power (MWt):

2652 operation 860

4. Nameplate Ratmg (Gross MWe):

829

5. Design Electncal Rating (Net MWe):

873.4

6. Maximum Dependable Capacity (Grosa MWe):

827.5

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A This Month Yr..to.Date Cumulative 720 4,343 75,215

11. Hours In Reportmg Period 720.0 4,294.6 53,927.7
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 720.0 4,283.7 52,689.3
15. Unit Reserve Shutdown Hours 0.0

. 0. 0 0.0

16. Gross Thermal Energy Generated (MWH) 1,888,407 11,045,883 133,917,425
17. Gross Electrical Energy Generated (MWH) 615,042 3,651,086 42,954,466
18. Net Electncal Energy Generated (MWH) 584,108 3,464.334 40.462.052
19. Unit Service Factor 100.0 98.6 70.1
20. Unit Availability Factor 100.0 98.6 70.1
21. Uni! Capacity Factor (Using MDC Net) 98.0 96.4 67.1 97.9 96.2 64.9
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 1.4 10.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Esch):

Refueling / maintenance outage, 10/4/86, approximate 1v eight weeks

25. If Shur Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 U[

8607160006 860630 f[

PDR ADOCK 05000348 R

PDR (iV77I

DOCKET NO.

50-348 I

UNIT DATI July 2, 1986 J. D. Woodard COMPLETED BY TELEPHONE (205) 899-5156 June St0NTII DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(31We Net) 813 t,

g7 g3i 811 813 33 2

~

~

-~~ i y - -

- --- - _ _.. - ---- g 9.

g 816 3

4 813 3

815 812 j

5 812 21 814 811 3

6 813 7

309 3

g 24 816 808 808' 9

25-801 810 10 808

,j Ig 808 27 811 808 811 12 3

809 l3 811 3

815 810 14 30 15 813 3g s

811 16 RISTRUGONS On this form:t. list the,ver:ge d:dy unit power levelin MW'e Net for each d y in the reporting month. Compute to

, the ne:re:t whole me;2 watt.

(9/77)

O

O O

O UNITSilU1 DOWNS ANI) POWER RElH)CIlONS DOCKET NO.

50-348 UNIT NAhlE J.M. Farley - Unit 1 DATE July 2.

1986 HEPORT hlONill June COktPl.ETEI)BY

_J.D. Woodard TEl.LPilONE (205) 899-5156

.k "i

Y so y:

6 rs

.c_

g y Liccusee Ev.

g1.

Cause & Cussective No.

Date

'"g

-j t2 8

g g a

.c g a:

Evens uT

n. ]

Action go s

M u

c6 ji$g Repost #

P8Cvent Recuricuce d

THERE WERE NO U: LIT SHUTI OWNS' )R SIGN FICANT POWER R. :DUCTIC iS DURING llE MONTIl 0F JUNE.

4 l

2 3

4 F: Forced Reason:

hic hod:

Exhibis G Insituctions S: Stheduled A-Equipment Failure (Explain) 1 Alanual for Pseparation of Data it.klaintenance of Test 2 Manual Scram.

Enity Sliccis for 1.icensee C Hefueling 3 Aulomatic Scram.

Event Repini (l.ER) File INUREG-D Regulatiny Restsiction 4 Other (Explain) 0161)

E-Operator Tsaining & license Examination F Adudaist:asive 5

i G Openalinnal linor (limplain)

Exhibis 1 - Same Source (9/77) 11 Olhes (Explain)

, Malling Address Atabimm Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald b

Sernor Vice President Flintndge Building

/\\lOb3lllaPower July 7,1986 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the June 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very tr lh 0 /]/l)

~

!j\\d / ' ~

C%

R. P. Mcdonald RPM /BCE:amh/F-2 Er. closures xc: Director, IE (10 copies)

Director, RII (1 copy) l sly

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 0

niaattivs st*4^av or oesaittons June, 1986 During the month of June, there were no unit shutdowns or significant power reductions.

The following major safety-related maintenance was performed in the month of June:

1.

Miscellaneous corrective and preventive maintenance was performed on diesel generators.

2.

The ID Service Water Pump was overhauled.

l O