Forwards Insp Repts 50-336/97-84 & 50-423/97-84 on 970915- 19.No Violations Noted.Testing of fire-related Safe Shutdown Components Were Found to Be Inadequate
ML20202G574
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/09/1998
From: Ruland W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bowling M, Loftus P
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20202G578 List:
References
50-336-97-84, 50-423-97-84, NUDOCS 9802200172
Download: ML20202G574 (3)


See also: IR 05000336/1997084

Text

%

'

i

,

,

!

February 9, 1998

i

Mr. M. L. Bowling, Recovery Officer, Unit 2

'

c/o Patricia A. Loftus, Director Regulatory _

,

Affairs for Millstone Station

l

PO Box 128

l

Waterford, CT 06385

Dear Mr. Bowling:

l

i

SUBJECT: NRC COMBINED INSPECTION 50 336/97 84:50 423/97 84

i

On September 19,1997, the NRC completed an inspection at your Millstone 2 & 3 reactor

!

facilities. The enclosed report presents the resulte of that inspection.

As documented in the enclosed report, the implementation of your Unit 3 licensing

commitment to specify fire protection actions in the emergency procedures has been

ineffective. We also found your testing of fire-related safe shutdown components to be

inadequate, equipment testing had not been performed, equipment modifications had not

been completed. and that not all the safe shutdown modifications had been approved by

'

your Plant Operations Review Committee.

Our inspection also determined that your own audits found significant problems. We

agrend with the conclusions of your own Nuclear Oversight Audit Package

A24057/A1t5119,which stated "...there is a lack of attention to the Fire Pretection

Program at Millstone," arid further concluded "...it cannot be established that Unit 3 could

perform a safe shutdown."

We note that you have initiated corrective actions for a number of the fire protection

problerns you have identified, and that you still have some fire protection problems under

evaluation. These issues will be identified as unresolved matters in our report and will be

evaluated later under NRC's Enforcement Policy.

We found that you have taken several positive initiatives regarding the fire protection

program with the recent approval and issuance of the Unit 3 safe shutdown equipment

surveillance test procedures and the revised fire protection program manual.

The significant issues list item regarding fire protection will remain open pending an

additional alternate safe shutdown program review by NRC prior to unit start up.

\\

N3

-

ll

1, I lil,li,Ill 1.1-

,,.

c

9902200172 990209

-y

t

gDR

ADOCKOS00g3]6

C

,

.

_ _ _._ _. __.__ _ _ - - _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _

__

_ _

,

.

Mr. M. L. Bowling

2

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

ORIGINAL SIGNED BY:

William H. Ruland, Chief

Electrical Engineering Branch

Division of Reactor Safety

l

Docket Nos. 50 336,50-423

Enclosure: NRC Combined Inspection Report 50 336/97.d4:50 423/97 84

cc w/ encl:

j

B. Kenyon, President and Chief Executive Officer

'

M. H. Brothers, Vice President Operations

J. McElwain, Unit 1 Recovery Officer

D. M. Goebel, Vice President, Nuclear Oversight

G. D. Hicks, Unit Director Millstone Unit 3

J. A. Price, Unit Direptor Millstone Unit 2

D.- Amerine, Vice President for Engineering and Support Services

P. D. Hinnenkamp, Director, Unit 1 Operations

F. C. Rothen, Vice President, Work Services

R. Johannes, Director Nuclear Treining

S. J. Sherman, Audits and Evaluation -

L. M. Cuoco, Esquire

J. R. Egan, Esquire

V. Juliano, Waterford Library

J. Buckingham, Department of Public Utility Control

S. B. Comley, We The People

State of Connecticut SLO Designee

D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN

J. M. Block, Attorney, CAN

S. P. Luxton, Citizens Regulatory Commission (CRC)

Representative T. Concannon

E. Woollacott, Co Chairman, NEAC

-_

3

.

.

t

.

Mr.B. D. Kenyon

3

Dlatribution w/ encl:

Region l Docket Room (with gony. of concurrences)

Nuclear Safety information Center (NSIC)

- PUBLIC

FILE CENTER, NRR (with DIlainal concurrences)

NRC Resident inspector

H. Miller, RA/W. Axelson, DRA, ORA

,

B. Jones, PIMB/ DISP

'

M. Kalamon, SPO, Rl

W. Lanning, Deputy Director of Inspections, SPO, RI

W. Travers, Director, SPO, NRR

l

W. Ruland, DRS

'

J. Durr, DRP

R. Fuhrmeister, DRS

D. Vito, ORA

DRS File

Disulbution w/rinct IVIA E MAIL):

J. Anderso. PM, SPO, NRR

M. Callahan, OCA

R. Corrola, NRR

B. McCabe, OEDO

j.

S. Dembek, PM, SPD, NRR

G. imbro, Deputy Director of ICAVP Oversight, SPO, NRR

.

D. Mcdonald, PM, SPO,' NRR

P. McKee, Deputy Director of Licensing, SPO, NRR

S. Reynolds, Chief, ICAVP Oversight, SPO, NRR

D. Screnci, PAO

Inspection Program Branch (IPAS)

COCDESK

DOCUMENT NAME: A:\\ MIL 9784. INS

T3 teceive a copy of thle document,Indcate in the boa: 'C' = Copy without attachment / enclosure

'E' = Copy with attachment /enolosure

'N' =

N) copy

OFFICE

Rl/DRS

l

Rl/DRS

6

Rl/DRP

l

l

l

NAME

RFuhrmeister

WRuland/4&A JDurr 41)

DATE V4Hb96/SS 26A/ovp 02/*//98

02/7/98

02/ /98

02/ /98

d*e4

OFFICIAL RECORD COPY