Requests That Issuance of Amend for Lgs,Unit 1 Be Deferred to Facilitate Implementation Prior to Startup from Refueling Outage 8
ML20202G458
Person / Time
Site: Limerick 
Issue date: 01/29/1999
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9902050188
Download: ML20202G458 (3)


Text

Ctation Support Department a

s 2_

v PECO NUCLEAR reco soero, cemnee, oes chesterbrook Boulevard A Unit of PECO Energy Wayne, PA 19087 5691 January 29,1999 Docket Nos. 50-352 License Nos. NPF-39 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Unit 1 Request to Defer Implementation of Proposed Technical Specifications Change Request No. 98-08-0 increase Safety Relief Valve Setpoint Tolerance From 11% t013%

Dear Sir / Madam:

By letter dated January 12,1999, PECO Energy Company submitted Technical Specifications (TS) Change Request No. 98-08-0, in accordance with 10CFR50.90, requesting an amendment to the TS (Appendix A) for Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2. The proposed changes involve revising TS Section 3/4.4.2, " Safety / Relief Valves," and TS Bases Sections B 3/4.4.2, B 3/4.5.1 and B 3/4.5.2, to increase the allowable as-found main steam Safety Relief Valve (SRV) code safety function lift setpoint tolerance from i1% to i3%.

In our January 12,1999 letter, we requested that, if approved, the amendments to the LGS,

/

Units 1 and 2, TS be issued by May 5,1999, and become effective within 30 days of issuance in order to support startup activities associated with the upccming LGS, Unit 2, refueling outage (2R05).

In order to support implementation of the proposed TS changes, the cycle specific core reload

))

analysis, which is performed for each unit prior to each refueling outage, must be updated to reflect the effects of including the 13% SRV setpoint tolerance change. The LGS, Unit 1, analysis will not be completed until its next refueling outage (1R08) currently scheduled for April, 2000.

Therefore, since the core reload analysis for Unit 1 is not expected to be completed until 1R08 commences (scheduled April,2000), we are requesting that the issuance of the amendment for LGS, Unit 1, be deferred to facilitate implementation prior to startup from 1R08. This request is being submitted under affirmation, and the required affidavit is enclosed.

9902050188 990129 E

ADDCK 050003S2[(

PDR PDR P

~ '..., y

. N,

..E January 29,1999 -

Page 2 -

1 ff you have any questions, please do not hesitate to contact us.

- Very truly yours, n-arrett D. Edwards Director-Licensing Enclosure '

cc:

.H. J. Miller, Administrator, Region I, USNRC (w/ enclosure)

A. L. Burritt, USNRC Senior Resident inspector, LGS (w/ enclosure)

R. R. Janati, PA Bureau of Radiological Protection (w/ enclosure) t A

s.

COMMONWEALTH OF PENNSYLVANIA ss.

  • COUN'TY OF CHESTER J. J. Hagan, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy, the Applicant herein; that he has read the foregoing request to defer issuance of the proposed amendment request to Facility Operating License Nos. NPF-39 for Limerick Generating Station, Unit 1, conceming Technical Specifications Change Request No. 98-08-0,

" Increase Safety Relief Valve Setpoint Tolerance From 11% to 13%," and knows the contents thereof; and j

that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

)

.I i

1 i

y_

ice hesident.

J Subscribed and sworn to before me this I day of 99.

/

Notyty Public NOTARIAL SEAL CAPIOL A. WALTON, Notary Putse j_PhHedelphia. PNia. Coug n;.y yg. oa __

z