ML20202G428
| ML20202G428 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 02/06/1998 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Franz J IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| Shared Package | |
| ML20202G435 | List: |
| References | |
| 50-331-98-02, 50-331-98-2, EA-98-003, EA-98-044, EA-98-3, EA-98-44, NUDOCS 9802200127 | |
| Download: ML20202G428 (3) | |
See also: IR 05000331/1998002
Text
_ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ - _
_ - __ - - _ _
.
..
..
- -
_(1g"8:oq\\
UNITED STATES
NUCt. EAR REGUL.ATORY COMMISSION
'
7,
REGION m
,
E
f
not wARRENVillE ROAD
- f
UsLE, ILUNotS 60r232-4351
February 6, 1998
EA 98-003
EA 98-044
' Mr. John F. Franz, Jr,
Vice President, Nuclear
IES Utilities Inc.
200 First Street S.E.
P. O. Box 351
Cedar Rapids, IA 52406-0351
SUBJECT: NOTICE OF VIOLATION AND NRC INSPECTION REPORT
NO. 50-331/98002(ORP) -
Dear Mr. Franz:
On February 4,1998, the NRC completed a routine safety inspection at your Duane Arnold
Energy Center (DAEC) facility. The enclosed report presents the results of that inspection.
During this six-week inspection period, your conduct of activities at the DAEC facility was
characterized by professional operations with appropriate focus on safety, sound maintenance
,
practices, and good teamwork among departments.
!
We are concemed, however, about four violations of NRC requirements that were identified. The
first three violations occurred when the limiting condition for operation of several containment
isolation valves was exceeded. This occurred over two years and there were three specific
examples identified. Also of concern is that your detailed review of this issue was not initiated
until after the inspectors communicated their concems on your compliance with Technical
Specifications on several occasions. In the fourth violation, the NRC inspectors identified that
your testing of the control building chiller la November 1997 did not meet 10 CFR 50.59
requirements.
These violations are cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding the violations are described in detail in the enclosed report. Please note that you are
required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
\\
I
aonnea
ll ll I.lll.l!I.l!I.I.I.I ll
..
.
9002200127 980206
ADOCK 05000331
0
l
J
_ _ _ _ _
J. Franz
2-
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
G. E. Grant
l
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.: 50-331
License No.: DPR-49
Enclosures:
1.
2.
Inspection Report
No. 50-331/98002(DRP)
cc w/encis:
L. Root, President and
Chief Operating Officer
G. Van Middlesworth,
Plant Manager
K. E. Paveler, Manager,
Regulatory Performance
Chairperson, Iowa Utilities Board
i
Distribution:
Docket File w/encls
PUBLIC IE-01 w/encls
CAA1 w/encls (E Mail)
>
Project Mgr., NRR w/encls
Deputy RA w/encls
A. b. Beach w/encls
Rill PRR w/encls
Rill Enf. Coordinator w/encls
DRS (2) w/encis
TSS wiencls
DOCDESK (E-Mail)
DRP w/encls
J. Lieberman, OE w/encls
J. Goldberg, OGC w/encls
R. Zimmerman, NRR w/encls
SEE PREVIOUS CONCURRENCES
DOCUMENT NAME: R:\\lnsprpts\\ powers \\duan\\DUA98002.DRP
To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci "E" = Copy
with attach /enci "N" = No copy
OFFICE
Rlli
Rlli
Rlli
Rlll
NAME
DuPont:dp
Clayton
Lanksbury
Grant (kbA
DATE
02/
/98
02/
/98
02/
/98
02/ h /
OFFICIAL RECORD COPY
I
______l
__
- - _ _ -
.
.
..
2 ,,_
2
_
- in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, anti your response will be placed in the NRC Public Document Room.
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
- Docket No.: 50 331
License No.: DPR-49
Enclosures:
1,
2.
Inspection Report
No. 50 331/98002(DRP)
cc w/encis:
L Root, President and
l'
Chief Operating Officer-.
G. Van Middlesworth, .
Plant Manager-
K. E. Peveler, Manager,
. Regulatory Performanca
Chairperson, Iowa Utilities Board
Distribution:
Docket File w/encls
SRI DAEC_w/encls
PUBLIC IE-01 w/encls
CAA1 w/ encl > (E-Mail)
Project Mgr., NRR w/encls -
- Deputy RA w/encls
A. B.' Beach w/encis -
Rlli PRR w/encls -
Rill Enf. Coordinator w/encls
DRS (2) w/encls
TSS w/encls
DOCDESK (E-Mail)
- DRP w/encls
J. Lieberman, OE w/encls
4
J. Goldberg, OGC w/encls
R. Zimmerman, NRR w/encls
_
DOCUMENT NAME: R:\\insprpts\\ powers \\duan\\DUA98002.DRP
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E" = Copy
wgittach/enci "N" = No copy
OFFICE
Rlli '
Rlli
C
Rill
_ ,
_- Rill
NAME
-DuPont:dp k
ClaytoOMb .
LankN
Grant
DATE-
028/98'
02/h98 $
02/4/98
02/ /98