Forwards Rev 8 to EP for Us Goelogical Survey Triga Reactor (Gstr) Facility.Rev Consists of Three Changes All in Section 4.7.1,page 15 of Plan
ML20202G125
Person / Time
Site: U.S. Geological Survey
Issue date: 01/29/1999
From: Fouch T
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202G130 List:
References
NUDOCS 9902040313
Download: ML20202G125 (2)


Text

-. . . -. --. . . . . - .

h I[hWi

, H United States Department of the Interior l

4" t~ GEOLOGICAL SURVEY 1

.. BOX 25046 M.S. 9// I DENVER FEDERAL CENTER DENVER, COLORADO 80225-0046 IN Ri t't ) A t il R l u January 29, 1999 Document Control Desk U.S. Nuclear Regulatory Commission l Washington DC 20555, i

Sirs:

' Enclosed is Revision 8 of the Emergency Plan for the U.S.

Geological. Survey TRIGA Reactor (GSTR) Facility (License R-113, Docket 50-274). The plan was revised without prior NRC approval as permitted by 10 CFR 50.54 (q) . The revisions. consist of the

.following,three changes, all in Section 4.7.1, page 15 of the plan:

-1. .In the middle-of the first paragraph, the sentence:

~

"First-responding crews are given training in the radiation hazards that might be encountered during an emergency.by the

-Reactor' Health Physicist" was changed to read:

"The Reactor Health Physicist trains the first-responding fire

and rescue crews in the radiation hazards that might be encountered during an emergency."

/f')

/

Basis: The. term "first-responding crews" is vague and difficult to: interpret. Defining the' crews as the fire and rescue crews

q. ;

clarifies who iscreceiving the training; LThe-sentence was also rearranged to improve its readability.

< 2 '. The subsequent sentence ends by stating:

~ ...and retraining sessions will be conducted at intervals not to i"

. exceed.two;(2). years."

This was changed to read:

1' "

... and. retraining sessions will be conducted at biennial intervals not to exceed-30 months."

9902040313

~

' 9' ~ %)1' hDR ADOCK 05 274 4

tDa i

Basis: The original intent was that the retraining be performed on a nominal 2 year frequency. Exercises with offsite organizations are performed biennially, not to exceed 30 months.

The retraining is performed as a part of those exercises and therefore the frequency should be thetsame. Agreements with outside organizations are also updated on a biennial basis, not to exceed 30 months.

3. In the third paragraph, the original sentence read:

"The Reactor Health Physicist provides training related to the L ' transport of injured personnel who are contaminated."

p This was changed to read:

"The Reactor Health Physicist assists the ambulance crew if transportation of injured, contaminated personnel is required."

Basis: The original sentence does not specify who receives the training or what frequency is required. We believe it is of more value'to have the Health; Physicist present and assisting the ambulance crew as needed.

These changes were reviewed and approved by the facility's Reactor Operations Committee. The committee believed that all i ' changes submitted do not decrease the effectiveness of the Emergency Plan. It is our belief that all changes submitted j herein ' are permitted by 10 CFR 50.54 (q) without prior NRC approval. Revision 8 of the Emergency Plan will therefore be implemented on January 31, 1999.

Please contact'the Reactor Supervisor (Tim DeBey) at (303) 236-4726 if you have'any questions regarding the revision or need 1

'further details. l 1

Sincerely, n -

N )

Thomas D. Fouch Reactor Administrator l

l~

L Copy to:

l Tim DeBey L

l-t n