_
'
February'6, 1998
.
,
_
'
4
t
e
_
Mr. B. D. denyon, President
and Chiet Nuclear Officer
Northeast Nuc;or Energy Company
A Box 128 -
6 korford, CT 0038b
SUBRCT:
MILLSTONE COMBINED INSPECTION REPORT NOS. 50 245/97-85;
~ 50-336/97-85;and 423/97 85
'
- Dear Mr. Kenyon:-
.This refers to the team inspection of licensed. operator performance and training conducted :
in six different weeks over the period from October 1. to December 12,1997_ at Millstone
Station, Units 1,2 and 3. The purpose of this inspection was to evaluate the performance-
of licensed operators during the simulator portion of their annual operating tests. - The
enclosed report presents the results of this inspection effort.
.
The team of region-based inspectors evaluated eleven crews of operators during 22
s simulator scenanos and the corrective actions for previously identified operator training-
- problems. Ten of eleven crews passed the operating test and the.one crew who failed the
-initial test _was properly remediated and passed a subsequent test.. In general, the crews
performed expected actions in a controlled, coordinateo manner that effectively mitigated -
the simulator events._ Also, the team reviewed your resolution of previous tra!ning
deficiencies and agreed with your resolutions as to which licensed operators'could
continue to. perform licensed dutie. Nonetheless, six of the nine items on Confirmatory .
Action Letter (CAL) 1-97-010 remain cpen and Startup lasues List (SIL) item 86 on
operator performance remains open pend:ng additional NRC reviews of Unit 3 operator
training.
In summary, the team did not identify any impediments to restart of the Millstone units,_
and NRC will conduct further assessments of crew and operator training and performance;
,
before it makes its restart decision for Unit 3.-
]
.,
!
f2Di p
y
9802190264 900206
.
'l.u
h
'
\\
- _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _
___
- o
. - .
0
Mr. B. D. Kenyon
2
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
Sincerely,
James T. Wiggins, Director
Division of Reactor Safety -
Docket Nos.- 50 245;50-336;50-423
cc w/ encl:
P. A. Loftus, Director - Regulatory Aff airs
M. H. Brothers, Vice President - Operations
l
M. Bowling, Jr., Unit 2 Recovery Officer
!
J. McElwain, Unit 1 Rocovery Officer
!
D. M. Goebel, Vice President, Nuclear Oversigot
J. A. Price, Unit Director - Millstone Unit 2
G. D. Hicks, Unit Director - Millstone Unit 3
M. J. Ross, Manager - Nuclear Training Assessment Group
.
D. Amerine, Vice President for Engineering and Support Services
P. D. Hinnenkamp, Director, Unit 1 Operations
F. C. Rothen, Vice President, Work Services
J. Stankiewicz, Training Recovery Manager
R. Johannes, Director.- Nuclear Training
'
S. J. Sherman, Audits and Evaluation
L. M. Cuoco, Esquire
J. R. Egan, Esquire
V. Juliano, Waterford Library
J. Buckingham, Department of Public Utility Control
S. B. Comley, We The People
State of Cennecticut SLO Designee
D. Katz, C^n is Awareness Network (CAN)
R. Bassilae, CAN
J. M. Block, Attorney, CAN
S. P. Luxton, Citizens Regulatory Commission (CRC)
Representative T. Concannon
E. Woollacott, Co-Chairman, NEAC
_
.- -
..
-
-
-
--
'
o+
'l
.
Mr. B. D. Kenyon
3
Distribution w/ encl:
Region i Docket Room (with.cany of concurrences)
Nucit,ar Safety information Center (NSIC)
PUBLIC
' FILE CENTER, NRR (with Qrigirlal concurrences)
NRC Resident inspector
. W.- Axelson, DRA
B. Jones, PIMB/ DISP
- M. Kalamon, SPO, RI
W. Lanning, Deputy Director of Inspections, SPO, RI
D. Screnci, PAO
W. Travers, Director,gA b
PO NRR
De J Grt Allo
Distribution w/enci (VIA E MAIL):
M. Callahan, OCA
R. Gall), HOLB, NRR
G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR
B. McCabe, OEDO
P. McKee, Deputy Director of Licensing, SPO, NRR
S. Reynolds, Chief, ICAVP Oversight, SPO, NRR
_
In'spection' Program Branch (IPAS)
DOCDESK
l
DOCUMENT NAME: A:\\ MIL 97207.FDR
To receive a copy of this document, Indicate in the box: 'C' = Copy without ottachment/ enclosure
"E" = Copy with
attachment / enclosure . "N* = No copy
OFFICE
Rl/DRS
l
Rl/DRS
l
Rl/DRP g l
Rl/OI
Rl/QRS
,
NAME
JD' Antonio
GMeyer
(L,.- JDui;r M ( p-
BLetts () gM JWQgins
DATE
O2/06/98
02/7 /98 W
02/@/98 ~j
O2/ 6/98' ' '
02T/,/98
'
OFFICIAL IECORD COPY
'
l
u
.