Forwards One Certified Copy of Listed Endorsements Re Nuclear Liability Insurance Policies for Seabrook Station
ML20202E722
Person / Time
Site: Seabrook 
Issue date: 02/11/1998
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To: Collins S
NRC (Affiliation Not Assigned)
References
NYN-98011, NUDOCS 9802190025
Download: ML20202E722 (15)


Text

. _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _

i.,,,

1 North North Adantic Enern Serda a.y aUn s

P.O. Ilox 300 Atlantic Seabr4 Nu 03m i

(603) 474 9521 The Northeast Utilities System February 11,1998 Docket No. 50-443 NYN-98011 Umted States Nuclear Regulatory Commission Attn: Mr. Samuel J. Collins Director, Office of Nuclear Reactor Regulation f

Washington, DC 20555-0001 l

i Seabrook Station

. Nuclear 1 iability Insurance Enclosed, please fmd one certified copy of each of the following endorsements to the below listed nuclear liability insurance pol.icies for Seabrook Station.

Endorsement to Certificates and Annual Premium Endorsement for Calendar fear 1998:

Poliev NumM N-0109 Advance Premium and Standard Premium Endorsement, Amendatory Endorsements and Certificate ofInsurance for Calendar Year 1998:

Poliev Number

'NW-0647 Increase in Limit of Liability Endorsement, Amendment to Condition 4, and Advance Prt.nium and Standard Premium Endorsement for Calendar Year 1998:

Policy Number NF-0296

\\

9802190025 980211 ff J

o, G 1

i O

United St:tes Nuclear Regul: tory Commission NYN 97026/Page two i

This infonfiation is provided in accordance with the requirements of 10 CFR 140.15. Should you have any questions concerning this response, please contact Mr. Terry L. liarpster, Director of 1.icensing Sen ices, ht (603) 773-7765.

Very truly yours, NORTil ATLANTIC ENERGY SERVICE CORP.

[

Ted C. Feigenbaum Sxecutive Vice President and ChiefNuclaur Officer 1

cc:

11. J. Miller, Regional Administrator C.W. Smith, Project Manager R. K. Lorson, NRC Senior Resident Inspector Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO CERTIFICATE NO. N -0109 Forming Part of Master Policy No.1 Nuclear Energy Liability Insurance (Secondary Financial Protection)

It is agreed that effective January 1,1998:

1.)

Item 4. (a) of the certificate is amended to read as follows:

Item 4. (a) -

Identification of primarv fmancial orotection applicable to the nuclear reactor and i

limit (s) ofliability thereof:

(1)

Facility Form Policy:

Nuclear Energy Liability Insurance Association's Policy NF-0296

$200,000,000 (2)

Master Worker Policy (Facility Worker Form):

Nuclear Energy Liability Insurance Association's Master Worker Policy NMWP-2 S200,000,000 11.)

Item 7. of the fxItificate is amended to read as follows:

It:m 7.

Maximum retrospective premium (exclusive of allowance for premium taxes) payable pursuant to Condition 2 of the Master Policy with respect to each nuclear incident: $79,275,000. THIS IS TO CERTIFY THAT THIS IS A TRUE COPY OF THE ORtGINAL CERTIFICA1E, BEARING THE NUMBER DESICN ATED HEREON, FOR INSURANCE COVERAGE UNDER THE MASTER POLICY-NUCLEAR ENERGY LIABILITY INSUR ANCE ($ AF[QBDED B SECONDAPY FINANCIAL PHOTECTIONh 603NSURANCEl

.3r hw U+

JOHNL. DUATTROCCHI bf^d( f"sll,

SENIOR VICE PRESIDENT UNDERWHITING Effective Date of AMERICAN NUCLEAR INSURERS

)

thi:2 Endorsement:

Jancary 1,1998 To torm a part of Certificate No.

N -0109 (12:01 A.M. Standard Time)

Issued to:

Seabrook Joint Owr.ers Data of Issue:

December 15,1997 For the s y ELibing compani)so I

It a" /

By A

'gg#

Endorsement No:

23 Countersignecib 1_

NE-S-22 (1/1/98)

NUCLEAR ENERGY LIABILITY INSURANCE

~

NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ANNUAL PREMlUM ENDORSEMENT i

CALENDAR YEAR 1998

1. APNUAL PREM1UM. It is agreed that the Advance Premium due the companies for the period designated ave is:

$7,500.00 4

THIS IS TO CERTIFY THAT THIS IF A TRUE COPY OF THE ORIGINAL CERTIFICATE. BEARING THE NUMBER DESIGNATED HEREON, FOR INSURANCE COVERAGE UNDEH THE MASTER POUCY NUCLAAA ENER BI SURANCE FINANGAL PROTEC

).

COPY.

JOHN SENIOR VI E PRESIDENT UNDENINIWTW4 AMERICAN NuttEAR 500Up01W Effective Date of this Endorsement: January 1,

1998 To form a part of Certificate No.

N -0109 (1201 AM Standard Time)

Issued to: Ceabrook Joint Owners Date of Issue:

August 5,

1997 For the s scribing c anies p "d*

II.

IY W sy iFre

.t

?

f/

Endorsement No:

24 Countersign by i

.~

l NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMlUM AND STANDARD PREMlUM ENDORSEMENT -

CALENDAR YEAR 1998

1. ADVANCE PREMUM. It is agreed that the Advance Premium due the companie9 for the period designated above is: $23,100.00 l
2. STAPOARD PREMUM AND RESERVE PREMUM: In the absence of a changa in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan,-the Standard Premium is said Advance Premium and the Reserve Premium is:

$17,325.00

! e This is to certify that this is a true copy of the original endorsement having the endorsement number and being made part of the Certificate of Insurarce bearing the number designated hereon for insurance coverage under the Nuclear Energy Lia ity Facility ers Form). No i rance is tsfiorded h hi,i, Sartor L[,..

ing John L Q American N rInsurers

?

Effective Date of this Endorsement: January 1,

1998 To form a part of Certificate No.

N'N -0647 -

(12:01 A.M. Standard Time)

Issued to: Seabrook Joint Ownera Date of Issue:

December 4,

1997 For the u scribing co anies By Y

I' e lW W PYesident Endorsement No:

3 Countersign by NS-36

1 NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION AMENDATORY ENDORSEMP,i[

lt is agreed that:

1.

Item I of the Declarr.tions is hereby amended to read as follows:

Item 1.

Named Insureds and Addresses:

Seabrook Joint Owners P. O. Box 300 Seabros, NH 03784 "Seabrook Joint Owners" means the companies listed below:

North Atlantic Energy Corporation The United Illuminating Company Massachusetts Municipal Wholesale Electric Company New England Power Company The Connecticut Light & Power Company Canal Electric Company Montaup Electric Company New Hamp:; hire Electric Cooperative, Inc.

Vermont Electric Generation and Transmission Cooperative, Inc.

Taunton Municipal Lighting P',t Hudson Light and Power Det c at EUA Power Corrmation 2.

Only with respect to this Certificate, Paragraph E, " AUTHORIZATION OF THE FIRST NAMED INSURED" of Section XIII of the policy of which this Certificate forms a part is amended to read:

Except with respect to compliance with the obligations imposed on the insured by the section of this policy entitled " INSURED"S DUTIES IN CASE OF CLAIMS OR SUITS", "SUBROGATION" AND " SUIT", the North Atlantic Energy ServiceSprpqrMiQ4his PJ@tMiRdp/bl%f rfgFrgy other t

9f insured in all matters pertaining to this insorkneement having the endorsement number and being made part of the Certifi%te of incurartce bearing the number designated hereon for insurance coverage under the Nuclear Effrctive Date of aq,WNWh W b h w ner afforded hereunds.it of Cett!#cate N95' NTV40

/

/c-u this Endorsement:

January 1,1998 sTgfomra pa 12:01 A.M. Stendard Time John L'Obattrocchi, M M W.Underwrinng American Nucieer insurers issued to:

Seabrook Joint Owners Data of issue:

December 15,1997 Forthe pribing compan I-Ud By" j;.!: PRESIDENT)

Endorsement No:

1 Countersign [d by*

NUCLEAR EMERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION AMENDATORY ENDORSEMENT The following are included as Additional Insureds under this policy, but only with respect to their interests in Unit I as described in the Facility Lease dated August 1,1990 betweer. Meridian Tn'st Company and the United Illuminating Company.'

' Unit I as described in the schedule to this endorsement.

1.

Meridian Trust Company, Attention Corporate Trust Department,35 North Sixth Street, Reading, Pennsylvania 19601, in its individual capacity and in its capacity as Owner Trustee under the Trust Agreement, dated as of August 1,1990, among Meridian Trust Company in its individual capacity and as Owner Trustee and Financial Leasing Corporation as Owner Participant (the " Trust Agreement"), and as owner of an undivided interest in Unit No.1 of the Seabrook Nuclear Power Plant.

2.

Financial Leasing Corporation, c/o Bankers Leasing & Financial Corp.,2655 Campus Drive, San Mateo, CA 99403, Attention: Ken P. Uyeda, as Owner Participant under the Trust Agreement, dated as of August 1,1990, among Meridian Trust Company as Owner Tnistee and Financial Leasing Corporation as Owner Participant (the " Trust Agreement"), and as owner of an undivided interest in Unit No.1 of the Seabrook Nuclear Power Plant.

3.

The Bank of New York,101 Barclay Street, New York, New York 10286, in its individual capacity and in its capacity as Indenture Trustee under the Indenture of Mortgage and Deed of Trust, dated as of August 1,1990, among Meridian Trust Company as Owner Trustee, The United Illuminating Company and The Bank of New York as Indenture Trustee.

It is acknowledged that the United Illuminating Company has waived their right of recovery against the above Additional Insureds for Loss to which this policy applies.

The Insurers will provide the above Additional Insureds thirty (30) days written notice prior to the effective date of the Insurers' cancellation of the polic{.his is to certify that this is a true copy of the original dorsement having the endorsement number and bemg made part of the Certificate of insurance bearin0 the number degnated hereon for insurance coverage under the Nuceer Energy uability falicy (Facility yVorkers Form). No insurance is afforded hereunder.

)

9

'~

John L da Senior Eff:ctive Date of this Endorsement:

January 1,1998 b'Mf Certificate No. NW -0647 12:01 A.M. Stanc.ard Time issued to:

Seabrook Joint Owners Data of Issue:

December 15,1997 Forthe s b rib!ng compan By JL l

h.m s U

( (p PRESIDENT

[

Endorsement No:

2 CoJntersign tfy

SCilEDULE UlS DESCRIPTION OF UNIT 1 SITE A certain tract ofland, but not the improvements and buildings located thereon, situated in Seabrook, County of Rockingham, State of New Hampshire bounded and described as fcilows:

Beginning at the westerly end of a stone wall at the easterly side of U S. Route 1, Lafayette Road, so-called, and at the southwesterly corner ofland now or formerly of Paul Dich'er; thence, running, North 83

  • 37' 30" East,170.34 feet along said stone wall to a drill hole; thence, North 80* 37' 15" East,225.37 feet along said stone wall to a drill hole; thence, North 79' 08' 45" East,128.34 feet along said stone wall to a drill hole at a corner of stone walls; thence South 5* 28' 25" East, 75.71 feet, along a stonc wall to a drill hole at the casterly end of said stone wall; thence, South 79* 09' 35" East. 48.94 feet; thence, North 74' 08' 45" East, 279.38 feet to a hub; thence, South 11
  • 49' 10" East,123.7 feet; thence, North 81
  • 34' 05" East,43','.1 i feet; thence, North 56' 41' 40" East,184.58 feet; thence North 61
  • 29' 30" Ea.,37.22 feet; thence, North 60' 27' 10" East,147.31 feet to an iron pipe; thence, North 56* 55' 25" East,452.19 feet; thence, North 13* 08'05" West,597.3 feet to land now or formerly of teonard J. Nangle, et ux., the last thirteen courses being along land of said Dichter; thence, North 76* 5 l' 50" East,408.6 feet;;hence, North 81
  • 06' 15" East,56.3 feet; thence, North 77* Ol' 05" East,481 feet; thence, northeasterly by a curve to the right with a radius of 3,000 feet, a distance of 745.98 feet to the Seabrook-Hampton Falls Town line, the last four courses being along land of said Nangles; thence, South 15' 02' 15" East,8.74 feet; thence, South 75
  • 10' 15" East,752.18 feet to land now j

or formerly of Boston & Maine Corporation, the last two courses being along said Town Line; thence, South l

17' 4 l' 55" West,48.91 feet; thence, South 89* 18' 00" East,17.25 feet; thence, South 17' 4l' 55" West,

[

414.9 feet; thence, South 86* 29' 10" East,17.02 feet; thence, South 17' 4l' 55" West,839.26 feet; thence, North 81* 37' 45" East,73.5 feet, the last six courses being along land now or formerly of said Bosten &

Maine Corporation; thence, North 81

  • 37' 45" East,541.4 feet; thence, casterly by a curve to the right with a radius of 1,114.25 feet, a distance of 774.44 feet; thence, South 58' 32' 50" East,100 fect; thence, North 69' 13' 45" East,551.99 feet; thence, South 71
  • 03' 04" East,374.64 feet; thence, North 82* 14' 50" East, 538 feet; thence, South 17' 00' 10" East, 583.73 feet; thence, South 55
  • 27' 10" West,1,190.67 feet; thence, South 63' 07' 45" West,414.01 feet; thence, North 34' 00' 45" West,1,126.3 feet; thence, North 55' 59' 15" East, 377.5 feet; thence, North 35' 43' 45" East,33.71 feet; thence, North 58' 32' 50" West,90.65 feet; thence, westerly by a curve to the IcR, with a radius of 989.25 feet, a distance of 687.56 feet; thence, South f,1
  • 37' 45" West,602.56 feet to the northeasterly corner ofland now or formerly of said Boston & Maine Corporation; thence, South 81
  • 37' 45" West, 73.5 feet, by land now or formerly of said Boston & Maine Corporation; thence, South 82
  • 02' 00" West,1,994.29 feet to the northeasterly corner ofland now or formerly of Edmond R. Marshall, et ux.; thence, South 81
  • 34' 05" West,664.69 feet, along land of said Marshalls to land naw or formerly of John Cairo, et ux.; thence, North 4' 35' 45" West,10.49 fe thence, South 8 l' :'4' 05" West,458.5 feet; thence, South 70' 03' 45" West,52.44 feet; thence, South 8l' 34' 05" West, 463.42 feet I

to the casterly side of said U.S. Route 1, the last four courses being along land of said Cairos; thence, northerly by a ctuve to the right with a radius of 1,643.49 feet, a distance of 195.55 feet; thence, North 4' 7' 35" East, 85.21 feet to the point of begiring, the last two courses being along said U.S. Route 1.

The above described tract is shown as Lot 1 on a plan entitled " SUBDIVISION PLAN OF LAND PROPERTIES INC. A PUBLIC SERVICE CO. OF N.H. SEABROOK, N.H." dated December 5,1978 and recorded in the Rockingham County Registry of Deeds, Plan No. D8560.

UlS-1 g

4 The Unit i Site also includes those certain rights and casements (relating to certain realty in the towns of Scabrook, Hampton Falls and Hampton, County of Rockingham, State of New Hampshire but not the

- improvements and buildings located on such realty pursuant to such rights and casements) enumerated on pages four and fwe of the &co of Public Scnice Comp my of New Hampshire (hereinafter "PSNH") and Properties, Inc. (hereinafter "Pl") to the Participants, excluding PSNH, dated September 12,1979 and recorded in the Rockingham County Registry of Deeds, Book 2348, Page 287 (the "PSNH Deed"), subject to the limitations enumerated in the PSNH Deed.

The Unit I site is subject to the right and casement of PSNH, its successors and assigns, resened in the PSNH Deed '.o construct, repair, rebuild, operate, patrol and remove overhead and underground lines consisting of wires, cables, ducts, manholes, poles and towers together with foundations, crossarms, braces, anchors, guys, grounds and other equipment for transmitting electric current and/or intelligence over, under and across land of PSNH, PI or the Participants; provided, however, that the said righ's reserved shall be exercised in a manner that will not interfere with the construction, operatica and maintenance of the Units (as that term is defmed in the Seabrook Agreement).

The Unit i Site, including the rights, e.sements and permissions referenced above, is subject to covenants, agreements, ccnditions, restrictions, rights-of way and other interests of record, to the extent that the same are now in force and appliccible; prov/ded. however, such covenants, agreements, conditions, restrictions, rights-of way and other ir.terests shall apply only to the property to which they applied when originally granted or resen'ed. Said covenants, agreements, conditions, restrictions, rights-of-way and other l

interests are more particularly described in the PSNH Deed.

The Unit i Ete, including the rights, casements and permissions referenced above, is subject further to all of the terms and provisions of the Seabrook Agreement (it being the intention of the parties to expressly l

set forth herein that the benefits and burdens of the Seabrook Agreement run with the land, namely the Unit i Site, and benefit and burden the undivided interests in common in and to the Unit i Site of the Participants, as d: fined in the Seabrook Agreement, and their successors and assigns), a copy of the Seabrook Agreement being on file with the New Hampshire Public Utilities Commission at Concord, New Hampsitire, and a copy of said agreement being en file at PSNH's general offices at 1000 Elm Street, Manchester, New Hampshire, including all amendments thereto which rre filed either with the New Hampshire Public Utilities Commission or at Public Senice Company of New Hampshire's general offices.

Each grantee of the Unit 1 Site by its acceptance of such conveyance, waives, on behalf ofitself and its successors and assigns, any right to panition the Unit 1 Site or the Property Intercsts (as that tenn is defined in the Scabrook Agreement) or any part thereof(whether by partition in kind or by sale and disposition of the proceeds thereof) so long as the Property Interests are used or useful for an electric generating unit, or for the term set forth in Paragraph 31.1 of the Seabrook Agreement, whichever is less, and agrees not to commence during such period any action of any kind seeking any form of partition with respect thereto whether pursuant to a remedy at common law or under any statute and waives the benefit of all laws and decisions now or hereafter enacted or decided authorizing such partition.

UlS-2 j

a

NUCLEAR ENERGY LIACILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION NUCLEAR ENERGY LIABILITY POLICY (Facility Worker Form) herein called the MASTER WORKER POLICY CERTIFIC ATE O F INSU R ANCE Certificate No. NW - 0647 Date ofissue December 15 19 97 This is to certify that the insureds named in item I of the Declarations hereof, hereinafter called the

" Named Insureds", have obtained insurance under the Mas'er Worker Policy issued by Nuclear Energy Liability insurance Association on behalf ofits members. The insurance is subject to all of the orovisions of this " Certificate" and the Master Worker Policy.

I DECLARATIONS Item 1.

Named Insureds a-

$ ddresses:

Seabrook Joint Owners P. O. Box 300 Seabrook, NH 03784 Item 2.

Certificate Coverage Period:

Beginning at 12:01 a.m. on January 1,1998, Eastern Standard Time and continuing through the effective date of cancellation or termination of this Certificate.

NMWPC-2 Page1 of3 l

g

Item 3.

. Description of the Facility:

Location:

All of the premises including the land and all buildings and structures located on an area of approximately 896 acres on th_e western shore of Hampton Harbor, on a point ofland called "1 ne Rocks," in the vicinity of two small tidal estuaries, the Browns River and the Hunts Irland Creek in the township of Seabrook, Rockingham County, New Hampshire.

Typ:: Power Reactor Operator of the Facility:

Nor'h Atlantic Ene gy Service Corporation Facility Form inception Date: December 15,1985 (12:01 A.M. Standard Time)

Item. 4, Amount ofinsurance Avatilable:

The amormt ofinsurance afforded by the Muter Worker Policy through -

this Certificate shall be determined by_ Section Vill of the Master Worker Policy and all of the other provisions of the policy relating theseto.

Item 5.

Advance Premiurx

$ 23,100.

2

' APPLICATION OF CERTIFICATE Thh Cenaicate applies only to bodily injury to a worker which (1) is caused by the nuclear energy hazard j

en or after the Facility Srm Inception Date stated in Item 3 abeve, (2) is first reported to the companies on or after 12:01 a.m. on January 1,1998, Eastern Standard Time and (3) is discovered and for which written claim is made against the insured, not later than one year after the end of the Certificate Coverage Period.-

NMWPC-2 Page 2 of 3

IN WITNESS WHEREOF, the companies subscribing the Master Worker Policy have caused this Certificate to be executed and attested on their behalf by the President of Nuclear Energy Liability Insurance Association and duly countersigned by an authorized representative.

For the Subscribing Companies of NUCLdAR ENERGY LIABILITY INSURANCE ASSOCIATION George D. Turner " resident OlW W l*

I.

9,

(

\\f. O

'A 6pfGN%:8 Countersigned by:

(Authorized Representative) s This is to certify that this is a true copy of the original Certificate bearing the number designated hereon, for insurance coverago ureder the Nuclear Energy Liability Policy (Facility Workets Tprm) hereir) called the Master Worker Pohey.

Insuraope ta afforded John L'Qilattrocchi,"Senfot

.this copy," f,;Z, g

American Nuclea'irsurers 4Jrderwriting NMWPC-2 Page 3 of 3

NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION INCREASE OF LIMIT OF LIABILITY ENDORSEMENT (After Prior Increase)

It is agreed that:

1.

The limit of the companies' liability stated in Item 4 of the declarations as amended by the Increase of Limit of Liability Endorsement (s) listed below is further amended to read $200_000.000; but in the event that any payments have heretofore been made by the companies for loss or expense covered by the policy, each of those limits ofliability including the limit ofliability as amended by this endorsement is reduced in accordance with Condition 3 of the policy by the total amount of 7

those payments, except to the extent that any such reduced limit of liability may have been previously restored in accordance with a Restorat on of Limit of Liability Endorsement.

2.

The increase in the limit ofliability provided by this endorsement applies ordy with respect to obligations assumed or expenses incurred because of bodily injury, property damage, environmental damage or evacuation of the public caused, during the period from the eff-ctive date of this endorsement to ne date of termination of the policy, by the nuclear energy h:wd.

3.

The original limit ofliability stated in item 4 of the declarations, the limit (s) ofliability stated in the Increase of Limit of Liacility Endorsement (s) listed below and the amended limit ofliability stated in paragraph I above shall not be cumulative, and each payment made by the companies after the effective date of this endorsement for any loss or expense covered by the policy shall reduce by the amount of such payment each of those limits ofliability, regardless of which limit ofliability applies with respect to the bodily injury, property damage, environmental damage er evacuation of the public out of which such loss or expense arises.

Previous increase of Limit of Liability Endorsement (s)

Endorsement No.(s): 11,26 and 65 This is to certify that this is a true copy of the original Endorsement having the endorsement number and beitig mada part of the Nu ear Foergy Unbility Policy (Facility Forrn) as des-ignated h eo. N ' 4.. rance is a d hereunder.

-~

uno t s.no vo %.

/

Effective Date of 4---

==

1 this Endorsement:

January 1,1998 To form a part of Policy No.

NF -0296 (12.01 A.M. Standard Time)

Issued to:

Seabrook Joint Owners Date of issue:

December 15,1997 For the subs

'ng com nies By Mk I*

IW h

O PresidentWh&

Endorsement No:

70 Countersigned by

NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION AhiENDMENT OF CONDITION 4 It is agreed that with respo to bod:!y injury, property damage, environmental damage or evacuation of the public caused after the effective date of this endorsement by the nuclear energy hazard, the figure

"$183,480,000" stated in Condition 4 of this policy is amended to read "$200,000,000" io ( ertify that this is - *ue copy of the oiiginal

., n wment having the enoo.sement number and being rr.ade part vi me Nt 'icar Energy Liability Policy (Facility Form) as des-gnated b oon.

urance is aff ' ed hereunder.

l.4.%&k/ A

~

g/

um t o o mson,w=

Eff:ctive Date of this Endorsement:

January 1,1998 To form a part of Policy No.

NF -0296 (12:01 A.M. Standard Time)

Issued to:

Seabrook Joint Owners D:te of issue:

December 15,1997 For the subs. ing com anies By hL L-

/W h6 President Endorsement No:

71 Countersigned by J

I i

NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMlUM AND STANDARD PREMlUM ENDORSEMENT CALENDAR YEAR 1998

.1.

ADVANCE PREMlUM. It is agreed that the Advance Premium due the companies for the period designated above is: $434,465.00

2. STANDARD PREMlUM.aND RESEVE PREMUM In the absence of a change in the Advance Premium iridicated above, it is agreed that, subject to the proviaioms of the Industry Credit Rating Plan, the Standard Pretnium is said Advance Premimn and the Reserve Premiuin is: $333,008.00 f

This is to certify that this is a true copy of the original Endorsement hav >ig the endorsement number and part i

of the Nuc atEne sbihty Poli ilhy ignaied be on.

rance x o, Am.nc.n w w Effectivo Date of this Endorsement: January 1,

1998 To form a part of Policy No, ff -0296 (12.01 A.M. Standard Tirne)

Issued to: Seabrook Joint Owners Date of Issue:

November 24, 1997 For the o scribing c

.anies I' +

/W By side e">

/

l Endorsement No:

72 Countersigne NE-36 i