Forwards Request for Addl Info Re 971015 Proposed Rev to Millstone Unit 3 Tss.Proposed Amend Would Affect Nominal Trip Setpoints & Allowable Values for RTS Instrumentation Trip Setpoints Table 2.2.1
ML20202E200
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/09/1998
From: Andersen J
NRC (Affiliation Not Assigned)
To: Bowling M, Loftus P
NORTHEAST NUCLEAR ENERGY CO.
References
TAC-M99796, NUDOCS 9802180093
Download: ML20202E200 (4)


Text

,. January 9 .1998-

,, .=

Mr. M:rtin L.i Bowling -

~ ;. .RIcov:ry Officer Millstone Unit 2 '

. Northeast Nuclear Energy Company clo Ms. Patricia A. Loftus RECEIVED Director - Regulatory Affairs _-

P.O. bun 1'28 19,"8 jfjl l [ pg p 0 2_

Waterforo, CT 06385-PUBLIC DOCUhEN(noon -

SUBJECTi - REQUEST FOR ADDrliO.NAL INFORMATION REGARDING AN OCTOBER 1L, 1997, PROPOSED REVISION TO TECHNICAL SPECIFICATIONS (TAC NO. M99796) -

1

Dear Mr. Bowling:

By .790|letter dated October 15,1997]] Northeast Nuclear Energy Company (NNECO) requested l changes to the Millstone Unit 3 Technical Specifications. The proposed amendment would i I1 af'ect nominal trip setpoints and allowable values for Recc.or Trip System (RTS).

Instrumentation Trip Setpoints Table 2.2-1, and Engineered Safety Features Actuation System

(ESFAS) Instrumentation Trip Setpoint Table 3.3-4. In addition, the proposed amendment'

. would (1) decrease the reactor tr:p setpoint for tlie reactor coolant pump (RCP) low snaft speed .

(underspeed trip setpoint) from 95.8 percent to 92.4 percent of rated speed, (2) make editorial L

. changes, ard (3) change the Bases to reflect the new methodology.

L ,

L 4The NRC staff has completed a preliminary review of your request and has identified several i L

issues 1.iat require acM4ional information. Please respond to the enclosed request for-1 additional informatioia expeditiously in order for the staff to complete its review in a timely -

manner.-

Sincerely, ,

M MN rsen, Project Manager Special Projects Office _ Licensing

_ Office of Nuclear Reactor Regulation Docket No. 50-423 =

Enclosure:

As stated - ~

lcc w/ encl: See next page.

s Distribution- _ _

g Docket File ; LBerry ACRSi

. PUBLIC g ). 4

1. SPO-L Reading JAndersen PMcKee _Qt'd

_ SPO Reading. WTravers OGC~ . 3, J JDurr, RI DOCUMENT NAME:G:WNDERSEN/99796.RAI ~

To receive a cop f of this document. Indicate in the box "C" cop, Wo attachlenci"E" cchy wisttachtenci"N" no copy OFF!CE : SPO-L-PM [ 'SPO-L-LA g MC d h DD _

NAME JAndersenh LBorry h dicKM  !

DATE / / 9198 [1 1 /38 198-- \# Vh8

-OF 9 ente =ea =to,FICIAL RECORD COPY g y - ga lllll l.iI.llllll lll l'

'~

Nor' ssi Munies Energy Company Millstone Nuclear Power Station

. Unit 3 cc:

Mr. William D. Meinert L,llian M. Cuoco, Esquire - Nuclear Enginaer Senior Nuclear Couasal Massachusetts MunicipalWholesale Northeast Utilities Service Company Electric Company

- P. O. Box 270 P. O. Box 426 Hartford, CT 06141-0270. Ludlow, MA 01056 Mr. Kevin T. A. McCarthy, Director Joseph R. Egan, Esquire Monitoring and Radiation Division Egan & Associates, P.C.

Department of Environmental Protection 2300 N Street, NW 79 Elm Street Washington, D.C. 20037 .

Hartford, CT 06106-5127 '

Mr. F. C. Rothen Regional Administrator, Region i Vice President 4Vork Services U.S. Nuclear Regulatory Commission Northeast Utilities Service Company 475 Allendale Road P. O. Box 128 King of Prussia, PA 19406 Waterford,CT 06385 First Selectmen Emest C. Hadley, Esquire Town of Waterford 1040 B Main Street -

Hall of Records P. O, Box 549 200 Boston Post Road - West Waraham, MA 02576

, Waterford, CT 06385 Mr. John Sekingham Mr. Wayne D. Lanning Department of Public Utility Control j

. Deputy Director ofInspections Electric Unit

.Special Projects Offee 10 Liberty Square 475 Allendale Road New Britain, CT 06051 King of Prussia, PA 19406-1415 Mr. Ja nes S. Robinson Michael H. Brothers . Manager, Nuclear investments and Vice President - Operations Administration Northeast Nuclear Energy Company -

New England Power Company P. O. Box 128 25 Research Drive Waterford, CT_06385 Westborough, MA 01582 Mr. M. R. Scully, Executive Director Mr. D. M. Goebel Connecticut Municipal Electric Vice President - Nuclear Oversight

.. Energy Cooperative Northeast Utilities Service Company 30 Stott Avenue P.O. Box 128 Norwich, CT 0e360 Waterford, CT 06385

- Mr. David Ameri'io Detnrah Katz, President Vice President - Nuclear Engineering Citizens Awareness Network and Support _

P.O. Box 83 Northeast Utilities Service Company Shelbume Falls, MA 03170 P. O. Box 128

- Waterford, CT 06385 t

i . , ..

. Northeast Nuclear Energy Company Millstone Nuclear Power Station Unit 3 cc:

Senior Resident inspector Mr. Daniel L. Curry Millstone Nuclear Power Station Project Director clo U.S. Nuclear Regulatory Parsons Power Group Ir+c.

Commission 2675 Morgantown Road P. O. Box 513 Recding, PA 19607 Niantic, CT 06357 Mr. Don Schopfer Mr. Allan Johanson, Assistant Director Verification Team Manager Office of Policy and Management Sargent & Lundy Policy Development and Planning Division 55 E. Monroe Street 450 Capitol Avenue - MS# 52ERN Chicago, IL 6C603 P. O. Box 341441 Martford, CT 06134-1441 Mr. J. P. McElvdeln Vice President (Acting) - Millstone 3 C16zens Regulatory Commission Northeast Nuclear Energy Company ATTN: Ms. Susan Perry Lu: ton P.O. Box 128 180 Great Neck Road Waterford, CT 06385 Waterford, CT 06385 '

l Mr. G. D, Hicks The Honorable Terry Concannon Unit Director - Millstone Unit 3 Co-Ch.ir Northeast Nuclear Energy Company Nuclear Energy Advisory Council P.O. Box 128 Room 4035 Waterfore, CT C8385 Legislative Office Building Capitol Avenue Hartford, CT 06106 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's PMn Road Simsbury, CT 06070 -

Little Harbor Consultan'.s, Inc.

Millstone -ITPOP Project Office P. O. Box 0630 Nian'ic, CT 06357-0630 Mr. B. D. Kenyon Chief Nucisar Officer - Millstone Northeast Nuclear Energy Company P. O. Box 128 Waterford, CT 06385 l

e REQUEST FOR ADDITIONAL INFORMATION MILLSTONE NUCLEAR POWER STATION. UNIT ?

QQCKET NO. 50-423 TAC M99796 (1). - Proposed Limiting Condition ior Operatioa (LCO) statement 2.2.1 does not reflect its heading requirement and does net refor to the table that lists the setpoints. Plea -

justify.

(2) Instrument operability requirements are stated in LCO 3.3.1, why lo it needed twice

-(proposed LCO 2.2.1 and existing LCO 3.3.1)? Please justify.

4 (3) in the current Technical Specifications (TS), if the reactor trip system instrumentation or interlock setpoint is less conservative than the allowable value, the TS require adjusting th3 setpoint consistent with the trip setpoint value of Table 2.2-1 and determining within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that equation 2.2-1 was satisfied for the affected channe', or declaring the enanne.1 inoperable and following the action in T Sie 3.3.1. For the proposed amendment, the Bases state that if the value is wund to be in excess of allowable value, but within the administratively controlled limit, the channel is onerable and must be calibratad per the plant procedure. As such, the channel operability is controlled by an administrative procedure and not by TS. Please justify.

Enclosure l

, J