Forwards Response to Transmitting Violations Noted in Insp Repts 50-456/97-20 & 50-457/97-20.Commitments Made by Util in Attachment Listed.W/O Encl
ML20202D105
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/04/1998
From: Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-456-97-20, 50-457-97-20, NUDOCS 9802130119
Download: ML20202D105 (2)


Text

_

i..m m..n w e. e i # ,,o .,m m n>

g iIf Jul% t H at* ( ECD (TJf Hig \tJtis m -

iI.5$.IS'o a,n, SAFEGUARDS INFORMATION

1eisis.w eco NO. 4 February 4,1998 SECURITY MARKING DOES NOT APPLY WHEN THIS LETTER IS SEPARATE FROM THE ENCLOSURE Document Control Desk US Nue
ear Regulatory Commission Washington, D.C. 20555

Subject:

Reply to Notice of Violation NRC Inspection Report Nos: 50-456(457)/97020 Braidwood Nuclear Power Station Units 1 and 2 NRC Docket Numbers 50-456 and 50-457

Reference:

J. A. Grobe letter to T. J. Tulon dated January 7,1998, transmitting Notice of Violation from Inspection Report 50-456(457)/97020 During the Security inspectica conducted Novemi er 17-21,1997, two Severity Level IV violations were identified. These violations are docurr.ented in the reference specified above. Comed's response to the violations is included in the attachment to this letter.

Braidwood Security Managen. ant has worked hard to ensure above average security support to the Station. To address the attentiveness issue, stand-down meetings were held with all Security Force personnel. These meetings emphasized the importance of being attentive-to-duty, perception of being inattentive, and the steps to take if an employee believes they may not be fit.for-duty. Additionally, the Supervisor's role, in helping employees maintain attentiveness, was re-emphasized. These actions were taken to assure that each employee understands the importance or maintaining attentiveness, the negative impact of a perception ofinattentiuness, and that they can take steps to avoid becoming inattentive, without penalty.

The following conunitments were made in the attachment to this letter:

a Security contractor management will develop a training seminar that addresses the everallissue ofinattentiveness. This seminar shall discuss past failures and provide employees with simple and effective alternatives to avoid inattentiveness problems.

The seminar entitled " Stand and Call" will be presented to all Security employees

(

/

during the flat quarter of 1998. All subsequently hired employees will receive this training prior to being assigned regular duties.

I i SAFEGUARDS INFORMATON SECURITY EARKING DOES NOT APPLY WHEN THIF N0. 4 . . LETTER IS SEPARATE FROM THE ENCLOSURE 9802130119 980204 PDR AECCK 05000456 k' hky l hh fhff j'f[j(((([f((

PDR 1 , , ,

~

Comed SAFEGUARDS INFORMATION NO. 4 Document Control Desk SECURITY MARKING DOES NOT APPLY WHEN TiiIE '

Page 2 LETT.ZH IS SEPARATE FROM THE ENGLOSURE If your staff has any questions or comments concerning this letter, please refer them to 1 Terrence Simpkin, Braidwood Regulatory Assurance Supenisor, at (815) 458-2801, extension 2980, s

-A Ti thy J. Tulon S te Vice President Braidwood Nuclear Gene 6ating Station Attachment cc: A.B. Beach, NRC Regional Administrator, Region III S. Bailey, Project Manager, NRR C.J. Phillips, Senior Resident Inspect y F. Niz% lek, Division of Engineering, Office a:Wc. 98012tjt. doe SAFEGUARDS INFORMATION N0. 4 SECURITY 11ARKING DOES NOT APPLY WHEN THI5 LETTER IS SEPARATE FROM THE ENCLOSURE