Informs of Planned Insp Effort Resulting from Surry Plant Performance Review & General Time Frame of Planned Insp. Details of Insp Plan for Next 6 Months Encl
ML20202C860
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/17/1997
From: Haag R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
References
IEIN-88-004, IEIN-88-4, NUDOCS 9712040083
Download: ML20202C860 (5)


Text

'

November 17. 1997-South Carolina Electric & Gas Company ATTN: Mr. Gary J. Taylor V. ice Pres 1 dent. Nuclear Operations

. Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville SC 29065

SUBJECT:

PLANT l'ERFORMANCE REVIEW (PPR)

SUMMER NUCLEAR STATION

Dear Mr. Taylor:

On October 17, 1997, the regional staff completed the semiannual Plant Performance Review (PPR) of Sumer Nuclear Station.

The staff con:lucts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by regional management to facilitate planning and allocation of inspection resources. The PPRforSummerNuclearStationinvolvedtheparticipationofalltechnical divisions in evaluating inspection results and safety performance information for the period March - September 1997.

PPRs provide regional management with i

a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Summer Nuclear Station PPR review and the general time frame of planned inspections plus the exact dates of team inspections.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.

The enclosure details our inspection plan for the next six months.

Individual inspections are identified by the month (s) in which we intend to conduct the inspection.

Exact dates are not provided for non-team inspections because experience has proven that we must often change dates as the result of higher priority requirements and conflicts at your site or other sites.

You will be contacted three-six weeks prior to individual inspections

= to confirm dates.

The rationale or basis for each inspection outside the core ins)ection program is provided so that you are aware of the reasons for

- emplasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature.

The NRC's general policy for reactor inspections is that each ins)ection shall be announced, except when announcing the inspection could reasona)ly--

compromise the objectives of the inspectors. Therefore. some specific inspections, such as in the security and radiological proter. tion areas, may not be announced.

art of the regional initiative inspection program, we plan to conduct As$owupins lsix months. pections of fire barrier penetration. seal issues during the next fol l

The issues are discussed in Information_ Notice (IN) 8 04.

N901d 0FFICIAL, COPY

&N M7 ru3 u

... -. ~. ~.. -

r SCE&G 2

" Inadequate Qualification and Documentation of Fire Barrier Penetration Seals." and IN 8B-56. " Potential Problems with Silicone foam Fire Barrier Penetration Seals " The specific plants that will be inspected have not yet been determined. We will notify you separately if the inspections are scheduled at your facility in the next 6 months.

We will inform you of any changes to the inspection plan.

If you have any questions, please contact me at 404 562 4500.

Sincerely.

Orig signed by Robert C. Haag Robert C. Haag. Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No. 50-395 License No. NPF 12

Enclosure:

Inspection Plan cc w/ enc 1:

R. J. White Nuclear Coordinator (Mail Code 802)

S.C. Public Service Authority c/o Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065 J.- B. Knotts Jr.. Esq.

Winston and Strawn 1400 L Street. NW Washington, D. C.

20005-3502 Chairman Fairfield County Council P. 0. Drawer 60 Winnsboro SC 29180 Virgil R. Autry. Director Radioactive Waste Management Bureau of Solid and Hazardous Waste Management S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 cc w/ enc 1: See page 3

(-

SCE&G d

cc w/ encl:

Continued R. M. Fowlkes. Manager Operations (Mail Code 303)

South Carolina Electric & Gas Company

'<;rgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065 April Rice. Manager Nuclear Licensing & Operatina Enerience (Mail Code 83D)

Sout1 Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. D. Box 88 Jenkinsville. SC 29065 Distribution w/ encl:

A. Johnson. NRR R. Gibbs, Ril P. Fillion. RIl D. Jones. L I W. Stansberry. Ril R. Aiello. RIl-PUBLIC NRC Resident inspector U.S. Nuclear Regulatory Commission Route 1. Box 64 Jenkinsville. SC 29065

/

ni ni.e

/

yrier ni n,

ni m

ni sis w et f' 9 -- -

l l[

f Q }G detisi.

mt (cener iir erre ietson cenristensen Treet, es 1 / 97 11 /# 7 / 97 11_/[7/97 11/ /1 / 97 11 l' 1 / 9' twt 11/ /7 t 97 11 / \\

/ J) kI lts)

No vts O

[Ul No i N

his) wo vis e

C(ty?

orflCIAL kECORD COPY 65 cam we G:\\SUMLET.97

~

V. C. SUMMER INSPECTION PLAN f

INSPECTION PROCEDURE /

TITLE / PROGRAM AREA N'JMBER DC PLANNED INSPECTION TYPE OF INSPECTION TEMPOPARY INSTRUCTION INSPECTORS DATES IP71001 LICENSED CPEPATOR 3

12/1/97 EXAMS REQ'JALIFICATION PROGRAM EVALUATION IP 84750 RADI0 ACTIVE WASTE 1

JANUARY 1998 CORE - WATER TREATMENT &

CHEMISTRY EFFLUENT &

ENVIRONMENTAL MONITORING IP 62707 MAINTENANCE RULE 1

JANUARY 1998 REGIONAL INITIATIVE - FOLOS ON MAINTENANCE RULE IMPLEMENTATION IP 40500 EFFECTIVENESS OF 3

3/2/98 CORE LICENSEE CONTROLS IN IDENTIFYING, RESOLVING AND PREVENTING PROBLEMS IP 81700 DHYSICAL SECURITY 1

MARCH 1998 CORE PROGRAM FOR POWER REACTORS IP 93809 SAFETY SYSTEM 4

3/30/98 CORE - AUXILIARY ENGINEERING 4/13/98 FEEDWATER SYSTEM INSPECTION (SSEI)

IP 64704 FIRE PROTECTION 1

APRIL 1998 CORE PROGRAM Enclosure

A IfiSPECTION PROCEDURE /

TITLE / PROGRAM AREA NUMBER OF PLANNED INSPEC' ION TYPE OF INSPECTION TEMPORARY INSTRUCTION INSPECTORS DATES IP 71714 COLD WEATHER 1

PRIOR TO AND REGIONAL PREPARATIONS DURING COLD INITIATIVE - FOCUS WEATHER OUTSIDE HEAT TRACING V. C. Sumer 2 of 2