Notice of Partial Denial of Amend 219 to License NPF-3. Proposed Changes to Listed TSs Were Denied in Part.Proposed Changes to TS 4.8.2.3.2.e Was Denied
ML20202C620
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/03/1998
From: Hansen A
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20202C606 List:
References
NUDOCS 9802120296
Download: ML20202C620 (3)


Text

tavu-ul-e UNITED STATES NUCLEAR REGULATORY COMMISSION TOLEDO EDISON COMPANY CENTERIOR SERVICE COMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY DAVIS-BESSE NUCLEAR POWER STATION. UNIT 1 DOCKET NO. 50-346 NOTICE OF PARTIAL DENIAL OF AMENDMENT T0 FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING The U.S. Nuclear Regulatory Commission (the Coumission) has partially denied a request by Toledo Edison Company, Centerior Service Company, and The Cleveland Electric Illuminating Company (the licensees) to amend Facility Operating License NPF-3 issued to the licensees for operation of the Davis-Besse Nuclear Power Station, Unit 1, located in Ottawa County, Ohio. Notice of C.onsideration of Issuance of the amendment was published in the FEDERAL REGISTER on January 2, 1997 (62 FR 132).

The purpose of the licensees' amendment request was to revise Technical Specification (TS) Section 3/4.8.1, "A.C. Sources," TS Section 3/4.8.2, "Onsite Power Distribution Systems," TS Table 4.8.1, " Battery Surveillance Requirements," and the associated bases. Surveillance requirements were modified to account for an increase in the fuel cycle. Administrative changes were also made.

The proposed changes to TS 4.8.1.1.1.b, TS-4.8.1.1.2.d, TS 4.8.2.3.2.d and TS 4.8.2.3.2.f were denied in part. The proposed change to TS 4.8.2.3.2.e was denied. The licensees requested to remove the restriction "during P

P

shutdown' from these TSs. These removals were deated because these removals would be inconsistent with current staff positions.

The NRC staff has concluded that part of the licensees' request cannot be granted. The licensees were notified of the Comission's partial denial of the proposed change by letter dated February 3,1998.

By March 11, 1998

, the licensees may demand a hearing with respect to the partial denial described above. Any person whose interest may be affected by this proceeding may file a written petition for leave to intervene. A request for hearing or petition for leave to intervene must be filed with the Secretary of the Comission, U.S. Nuclear Regulatory Comission, Washington, DC 20555, Attention:

Rulemakings and Adjudications Staff, or may be delivered to the Comission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, by the above date.

A copy of-any petition should also be sent to the Office of the General Counsel,-U.S. Nuclear Regulatory Commission, Washington, DC 20555, and to Jay E. Silberg, Esquire, Shaw, Pittman, Potts and Trowbridge, 2300 N Street, NW.,-Washington, DC 20037, attorney for the licensees.

For further details with respect to this action, see (1) the application for amendment dated October 28, 1996, as supplemented by letters dated August 19 and October 16,1997, and (2) the Comission's letter to the licensees dated February 3,1998.

These documents are available for public inspection at the Comission's Public Document Room and at the local public document room located-at the University of Toledo, William Carlson Library, Government Documents Collection, 2801 West Bancroft Avenue, Toledo, OH 43606.

f

s'

,e Dated at Rockville, Meryland, this third day of February 1998.

FOR THE NUCLEAR REGULATORY C0mi!SSION Allen G. Hansen, Project Manager Project Directorate III Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

  • 0 o e o Mr. J;hn K. Wood Vice President - Nuclear, Davis-Besse tenterior Service Company c/o Toledo Edison Company Davis-Besse Nuclear Power Station' 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

ISSUANCE OF AMENDMENT NO.

AND PARTIAL DENIAL OF AMENDMENT TO FACILITY OPERATING LICENSE N0. NPF DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. M97391)

Dear Mr. Wood:

The Commission has issued the enclosed Amendment No.

to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station (DBNPS), Unit 1.

The amendment revises the Technical Specifications (TSs) in response to your application dated October 28, 1996, as supplemented by letters dated August 19 and October 16, 1997.

This amendment revises TS Section 3/4.8.1, "A.C. Sources," TS 'ection 3/4.8.2, "0nsite Power Distribution Systems," TS Table 4.8.1, " Batter 3 ;urveillance Requirements," and the associated bases.

Surveillance requirements have been modified to account for the increase in the fuel cycle, consistent with Generic letter 91-04, " Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle," dated April 2,1991.

Administrative changes were also made.

As set forth in the enclosed Safety Evaluation, the proposed changes to TS 4.8.2.3.2.e and TS 4.8.2.3.2.f have been denied in full, and the proposed changes to TS 4.8.1.1.1.b, TS 4.8.1.1.2.d and TS 4.8.2.3.2.d have been denied in part.

Notice of Partial Denial is enclosed.

Notice of Issuance and Notice of Partial Denial will be included in the Commission's next biweekly Federal Reaister notice.

Sincerely, Allen G. Hansen, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-346 DISTRIBUTION:

Enclosures:

1.

Amendment No, to Docket File GHill (2)

License No. NPF-3 PUBLIC PD3-3 R/F 2.

Safety Evaluation OGC WBeckner, TSB 3.

Notice of Partial Denial ACRS EAdensam (EGA1) cc w/encis: See next page RSavio GGrant, RIII SMitra THarris (TLH3, SE only)

DOCUMENT NAME:

G:\\DAVISBES\\DB97391.AMD

  • See previous concurrence To receive a copy of this document. Indicate in the box: 'C" = Copy without enclosures *E" = Copy with enclosures "fl* = No copy g

0FFICE PD33-PM l E PD33-LA lE EELB-BC l C OGC ; /} /

NAME AHansen(F6 EBarnhillth JCalvo /H C.

lj/ '

DATE

//5/W i/14/0X

/ /d / '/P p /p / 4 (

OFFICIAL RECORD COPY l

~

, s.

e Dated at Rockville, Maryland, this third day of February 1998, FOR THE NUCLEAR REGULATORY COMMISSION 1

Original signed by:

Allen G. Hansen, Project Manager Project Directorate III-3 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

{

DISTRIBUTION:

Docket File PD3-3 R/F RSavio OGC DOCUMENT NAME:

G:\\DAVISBES\\DB97391.BWI

  • See previous concurrence To receive a copy of this document, Indicate in the boa: "C" = Copy without attachtnentlenclosure
  • E' = Copy with attachment / enclosure
  • N* = No copy g

0FFICE LA:PDIII-3 (l. PM:PDIII-3 _

C OGC

, /, f NAME EBarnhill h/i AHansen F J CBarth * (V DATE

/ /19/9f I tts /e,g 1/22/98 0FFICIAL RECORD COPY

.J