ML20202C560

From kanterella
Jump to navigation Jump to search
Forwards Rev 11,Issue 2 to Physical Security Plan,Rev 1, Issue 2 to Safeguards Contingency Plan & Rev 3,Issue 2 to Training & Qualification Plan.Revs Are Submitted IAW 10CFR50.4(b)(4)(iii).Without Encl
ML20202C560
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/21/1999
From: Von Suskil J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9902010101
Download: ML20202C560 (2)


Text

___-_-

i l

en a a l

Vica President

=

1 Limerick Generatog Station PECO NUCLEAR esmone c-Po Box 2300 A Unit of FECO Energy S

Sa

a. PA 19464-0920 610 718 3000 / Fax 610 718 3008 Pager 1800 672 2285 #0271 Internet address: jvonsuskil@peco-onergycom 10CFR50.54(p)

January 21,1999 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.S. Nuclear Reguletory Commission ATIN: DocumentControlDesk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Submittal of Revisions to the Physical Security Plan, Issue 2, Revision 11 Safeguards Contingency Plan, Issue 2, Revision 1 Training and Qualifications Plan, Issue 2 Revision 3

Dear Sir:

This letter submits, in accordance with 10CFR50.4(b)(4)(iii), three (3) controlled copies of the revised Limerick Generating Station (LGS) Physical Security Plan, Safeguards Contingency Plan and Training & Qualifications Plan. The changes are detailed in the summary of Plan revisions.

These revisions have been submit'ed in accordance with 10CFR50.54(p)(2), and have been determined not to decrease the effectiveness of the LGS Physical Security Plan, Safeguards Contingency Plan and Training & Qualification Plan. The revisions to the LGS Security Plans address job title changes and changes in the Station organizational structure.

KOho$$52 PDR_

1 y100 Fo J

1 i 1 >

January 21,1999 Docket Nos. 50-532

)

50-535 License Nos. NPF-39 NPF-85 In accordance with 10CFR73.21, we request that the enclosed revisions to the ILS Physical Security Plan, Safeguards Contingency Plan and Training and Qualification Plan, which contain Safeguards Information be withheld from public disclosure and protected as described in 10CFR73.21. This revision is numbered as follows:

Physical Security Plan,Januaaf 1999, Issue 2, Revision 11 Sateguards Contingency Plan, January 1999, Issue 2, Revision 1 l

l Training and Qualification Plan, January 1999, Issue 2, Revision 3 Very truly yours, l

hnt N

mes D. von Suskil Enclosures H. J. Miller, Administrator, Region I, USNRC (2 w/ attachments) cc l

A. Burritt, USNRC Senior Resident Inspector, LGS (w/o attachments) bec:

(w/o attachments)

G. R. Rainey CB 63C-3 M. P. Gallagher.

G M L 5-1 J.J. Hagan CB 62C-3 G. D. Edwards CB 62A-1 l

. T. A. Moore SSB 2-4 l

H. F. McNa.lly, Jr.

TSC1-2.

PA DER BRP Inspector SSB 24 I

(2/ attachments)

J. A.Slaymaker PBAPS, SC 1-1 i

6

.