Discusses 990111 Telcon Held Between Uec Personnel & NRC Staff on Subject of Current Operating Cycle 10 Axial Offset Anomaly Condition
ML20202C368
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/26/1999
From: Mel Gray
NRC (Affiliation Not Assigned)
To: Randolph G
UNION ELECTRIC CO.
References
TAC-MA4458, NUDOCS 9901290396
Download: ML20202C368 (3)


Text

_ . _ __

l ,* *

% UNITED STATES # O

!y l

  • p

! 'j NUCLEAR REGUL.ATORY COMMISSION WASHm0 ton, D.C. 30006 0001 I

k*****,/s January 26, 1999 i

r I

! Mr. Garry L. Randolph l- Vice President and Chief Nuclear Officer l l

Union Electric Company l Post Office Box 620 l Fulton, Missouri 65251

SUBJECT:

OPERATING CYCLE 10 AXtAL OFFSET ANOMALY - CALLAWAY PLANT, UNIT 1 (TAC NO. MA4458) i

Dear Mr. Randolph:

On January 11,1999, a telephone conference call was held between Union Electric Company

(UE) personnel and the NRC staff on the subject of the current Operating Cycle 10 axial offset L anomaly (AOA) condition at Callaway Plant. During the telephone conference, UE personnel l characterized the current AOA condition and its causes. UE personnel also identified a range of options currently under consideration by UE management that would ensure adequate reactor shutdown margin is maintained as required by the Callaway Technical Specifications.

l Some of the options being considered would require procedure changes and associated reviews in accordance with 10 CFR 50.59. UE personnel further suggested a meeting with the staff, if necessary, in the near future to discuss the options under consideration.

A meeting with the staff is not required at this time. However, if UE management identifes a j safety issue with an option under consideration, the staff will want to meet with UE personnel

! prior to implementation of the option associated with the safety issue. The staff would also be willing to meet with UE personnel on this subject in the near future if, in the course of selecting an option, UE performs the associated 10 CFR 50.59 evaluation and identifies an unreviewed /

safety question. In this case, such a meeting would be scheduled after the amendment d_

application was received.

For your planning purposes in scheduling the completion of 10 CFR 50.59 evaluations D associated with options under consideration, please be advised that, in the event the evaluations identify an unrevowed safety question, your subsequent amendment application l should be submitted to the staff for approval as soon as possible. If such an application, including a risk informed analysis, were submitted by the end of this month, the staff would make available resources to complete its review of the submittal, using the normal public notification process, by mid-March 1999. This information was communicated to A. Passwater, D. Shafer and T. Moser of your staff on January 14,1999.

t

],

O ') ? * ,

~. a u 1.<; y,.

9901290396 990126 PDR ADOCK 05000483 hf ff

., l l

e j Mr. Garry'L. Randolph January 26, 1999 j If you have any questions, please contact me at (301) 415-3021. l l  ; Sincerely, Original Signed By l

Mel Gray, Project Manager l Project Directorate IV-2 i Division of Reactor Projects - til/IV )

Office of Nuclear Reactor Regulation  !

Docket No. 50-483 DISTRIBUTION:

Docket File cc: See next page PUBLIC PDIV-2 Reading OGC,015B18 EAdensam WBateman MGray EPeyton TCollins ACRS, TWFN MChatterton KBrockman, RIV LYandell, RIV j DGraves, RIV  !

  • For previous concurrences see attached ORC D_OCUMENT NAME: Ltr4458 OFC PDIV-2/PM PDIV-2/LA NRR:SRXB*

NAME MGra / E TCollins DATE 1/.M /98 1/Q(c/98 1 /25/98 OFFICIAL RECORD COPY l

a' s

I Mr. Garry L. Randolph 3 January 26, 1999 cc:

Professional Nuclear Mr. Otto L. Maynard Consulting, Inc. President and Chief Executive Officer 19041 Raines Drive Wolf Creek Nuclear Operating Corporation Derwood, Maryland 20855 Post Office Box 411 John O'Neill, Esq.

Shaw, Pittman, Potts & Trowbridge Mr. Dan 1. Bolef, President 2300 N. Street, N.W. Kay Drey, Representative Washington, D.C. 20037 Board of Directors Coalition for the Environment Mr. H. D. Bono 6267 Delmar Boulevard Supervising Engineer University City, Missouri 63130 i Quality Assurance Regulatory Support '

Union Electric Company Mr. Lee Fritz Post Office Box 620 Presiding Commissioner Fulton, Missouri 65251 Callaway County Court House 10 East Fifth Street U.S. Nuclear Regulatory Commission Fulton, Missouri 65151 Resident inspector Office 8201 NRC Road Mr. Alan C. Passwater, Manager Steedman, Missouri 65077-1302 Licensing and Fuels Union Electric Company Mr. J. V. Laux, Manager Post Office Box 66149 Quality Assurance St. Louis, Missouri 63166-6149 Union Electric Company Post Office Box 620 Fulton, Missouri 65251 Manager- Electric Department Missouri Public Service Commission 301 W. High Post Office Box 360 Jefferson City, Missouri 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Ronald A. Kucera, Deputy Director l Department of Natural Resources l P.O. Box 176 Jefferson City, Missouri 65102