1. CONTMCT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION /MSDIFICATION OF CONTRACT 3 of 3 l
2. (.MENOMENT/ MODIFICATION NO.
3. EFFECTIVE DATE 4 HEOUI$tTION/ PURCHASE REQ. NO-
6. PROJECT NO. (If applicatHel l

127 1/26/99 NMS 97-0091/26/99 s ISSUED BY CODE CODE U.S. Nuclear Regulatory Connission l

Division of Contracts and Prcperty Mgt.

Attn: T 7-1-2 W:shington DC 20555

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county. State and ZIP Code)

(x) 9A. AMENDMENT OF SOUCITATION NO.

Sc.h est Research Institute eB. DATED (SEE ITEM 11) 621 utebre Road, PO DraNer 28510 Sin utonio Tx 78228-0510 10A. MODIFICATION OF CONTRACT / ORDER NO.

Wesley C. Patrick, President, CNWRA 210 522-5158 TIN # 74-1070544 _

Con # NRC-02-97-009 108. DATED (SEE ITEM 13)

CODE lrACluTY CODE X

10-15-1987

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

] The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers [is extended [is not extended.

Off:rs must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

k) By completing items B and 15, and returning Copies of the amendment; (b) By acknowledging receipt Of this amendment of each copy of the offir submitted; Or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-KNOWLEDGMENT TO BE RECElVED AT THE PLACE DESIGNATED FOR THE RECElPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR 05'FER. If by virtue of this amendment you desire to change an Offer already sLbmitted, such change may be made b/ tregram or letter, provided each telegram or letter makes reference to the solicitation and this amenoment, and is received prior to the opening hour end d'te specified.

12. ACCOUNTING AND APPROPRIATION DATA Of requered)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

IX)

A. THl$ CHANGE ORDER t$ ISSUED PURSUANT TO: (Specify euthonty) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B THE ABOVE NUMBERED CONTRACT / ORDER is MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES touch se changes en paying office. appropnation date, etc.)

EET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103tb).

C. THis SUPPLEMENT AL AGREEMENT 15 ENTERED INTO PURSUANT TO AUTHORITY OF:

D. CTHER (Sp6 city type of modification and authonly) j x is not, []is required to sign this document and retUTn copies to the issuing of fice.

E. IMPORTANT: CDntractor

14. DESCRIPTION OF AMENCMENT/ MODIFICATION (Organared by UCF sect.on headings, mcluding schcitation/contracs subiect matter where feasiDieJ Please see attached.

c, ") A 1

'1 1 9901290394 990126 PDR CONTR NRC-02-97-OO9 PDR l

l Except a.a provided herem, all terms and condations of the document ref erenced in item 9A or 10A, as heestofore changed, remams unchanged and in full force end effect.

15A. NEAE AND TITLE OF SIGNER (Type os print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or pnnt)

Barbara D. Meehan 16e CONTRACTOR / OFFEROR 16C DATE SIGNED 168 UN!TED STATE OF AMERICA 1$C, DATE SIGNED BY

-; Vhd ljk t.i.-

_ Q i

~ (Egnature of Contracting Officeri'~

01 26 1999 (Egnature of person authonzed to angn)

STANDARD FORM 30 (REV 1483) l

  1. 7

.5

.. w g

j Description of Changes incorporated by Modification No.127 to NRC-02-97-009 Page 3 i

Job Code J5206 (Spent Fuel Dry Transfer)

Total FY97 obligation amount $25,000.

Total FY98 obligation amount $200,000.

Total FY98 deobligation amount $33,000 Total FY99 obligation amount $150,000 Cumulative Total of NRC Obligations for JC J5206 $342,000.

Job Code J5210 (Aluminum-Based Spent Fuels)

Total FY98 obligation amount $125,000.

Cumulative Total of NRC Obligations for JC J5210 $125,000 Job Code J5186 (TMl-2 Fuel Debris)

Total FY98 obligation amount $208,000.

Total FY98 deobligation amount $8,000.

Total FY99 obligation amount $100,000.

Cumulative Total of NRC Obligations for JC J5186 $300,000.

Job Code J5226 (Private Fuel Storage)

Total FY98 obligation amount $158,000 Total FY99 obligation amount $180,000.

Cumulative Total of NRC Obligations for JC J5226 $338,000 This modification does not obligate funds.

l l

J

-g r

rw yva-r-r w-rg-y-.

+

i J.

(

e;

- =

NRC-02-97-009 Modification No.127 Page 7 l

e.

Total amount authorized by Operations / Project Plans is as follows:

j j'

High-Level Waste Waste Solidification Systems t,

Job Code: D1035 Job Code: J5190 i>

Amount: $22,895,939.

Amount: $35,349.05 Job Code: L1793 Amount: $2,763.35 Tank Waste Remediation Spent Fuel (TMI-2 Fuel Debris)

Job Code: J5164.

Job Code: J5186 Amount: $1,755,048 Amount: $292,545 l

Spent Fuel (Dry Transfer).

Spent Fuel (CIS)

{

Job Code: J5206 Job Code: D1035 Amount: $342,000 Amount: $450,000.

I i:

Aluminum-Based Spent Fuel Spent Fuel (PFS)

Job Code: J5210 Job Code: J5226 Amount: $125,000 Amount: $302,497

]

1 Total amount authorized: $26,201,141.40 f.

The total award fee available, the award fee eamed thus far and the evaluation period applicable thereto are as follows:

Evaluation Period Available Award Fee Award Fee Eamed 17 9/27/97-9/25/98 $598,989

$581,021 18 9/26/98-9/24/99 19 9/25/99-9/29/00 20 9/30/00-9/28/01 21 9/29/01-9/27/02 Section C - Description / Specifications / Work Statement I

C.1 Statement of Work for Operation of the Center for Nuclear Waste Raoulatory Analyses C.1.1 Concept for CNWRA Support to NRC j

C.1.1.1 Nuclear Waste Policy Act of 1982 The Nuclear Waste Policy Act of 1982 as amended (NWPA) sets forth the policy of the United States with regard to the management, storage and disposal of this nation's i

high-level radioactive waste from commercial and defense activities. The NWPA t

charges the Department of Energy (DOE) as the lead Federal Agency to manage the

o Description of Changes incorporated by Modification No.127 to NRC-02-97-009 Page 2 The purpose of this modification is to increase the authorized funds, show the award fee pool and fee earned for evaluation period 17, and to revise the list of the Project Officers.

Accordingly, the following revisions are made:

l i

Section B.2.C.e is revised to show the new authorized amounts as shown on the attached change page 7.

j i

Section B.2.C.f is revised to show the available award fee and award fee eamed for evaluation period 17 as shown on the attached change page 7.

Section G.3.1.C is revised to change the Project Officers for the Hanford Tank Waste System and for the Spent Fuels Project Office as shown on attached change page 29.

All other terms and conditions of this contract, including the ceiling amount for the second renewal period of $87,611,477.00, remain the same.

A summary of new obligations for the second renewal period of this contract is given below:

Job Code D1035 (HLW)

Total FY97 Obligation amount $445,000 (see Spent Fuel (CIS) below)

Total FY98 Obligation amount $10,792,270 (Note that this reflects the $19,000 which was obligated on Mod.123, but not reflected in this summary)

Total FY99 Obligation amount $11,862,000.

Cumulative Total of NRC Obligations for JC 1035 (HLW) $23,099,270.

Job Code D1035 (Spent Fuel (CIS))

Total FY97 obligation amount $200,000 Total FY98 obligation amount $250,000 2

Cumulative Total of NRC Obi;gations for JC 1035 (SP CIS) $450,000.

Job Code J5164 (Tank Waste Remediation)

Total FY98 obligation amount $250,000 Total FY99 obligation amount S285,000 Cumulative Total of NRC Obligations for JC J5164 $535,000.

/,' f NRC-02-97-009 Modification No.127 Page 29 Waste Solidification Systems Jack Parrott None (Operations Plan)

Hanford Tank Waste System Michael Tokar (Operations Plan)

Subtask 3.1.2 and 3.2.2 Robert Shewmaker Subtask 3.1.4 Rex Wescott Subtask 3.1.6 Lydia Chang Subtask 3.2.1 Makuteswara Srinivasan Spent Fuels Project Office Mark Delligatti (Operations Plan)

TMI-2 Fuel Debris Michael Raddatz Dry Transfer System Steve Baggett J

Central Interim Storago J. Randall Hall Private Fuel Storage None DOE Aluminum-Based Spent Nuclear Fuels Disposition Program (Operations Plan)

Charles Greene None G.3.2 - Technical Assistance HLW and TWRS Sponsors A.

The individuals listed in "C" below are hereby designated as Technical Assistance HLW and TWRS Sponsors The individual Technical Assistance HLW and TWRS Sponsors have overall technical responsibility for the work placed at the CNWRA, within their respective areas, as detailed in paragraph C. below and are responsible for: (1) identifying, prioritizing and recommending work to be placed at the CNWRA; (2) monitoring the CNWRA's progress to ensure that work completed is commensurate with resources expended and is on schedule including surveillance and assessment of performance, and recommending to the NRC CO changes in requirements; (3) interpreting the scope of work as required; (4) performing technical evaluations as necessary; (5) performing technical reviews and acceptances as required; and (6) assisting the CNWRA in the resolution of technical problems encountered during performance. Within the purview of this authority the Technical i

Assistance Sponsors are authorized to review all costs requested for reimbursement by the CNWRA which are associated to their particular program area and submit recommendations for approval, disapproval, or suspension for supplies / services required under the contract to the NRC CNWRA PM. The NRC CO is responsible for directing or negotiating any changes in terms, conditions, or amounts cited in the contract and elements.

B.

The Technical Assistance Sponsors are not authorized to approve or request any action which results in or could result in an increase in contract cost; or terminate the contract, settle any claim or dispute arising under the contract or issue any unilateral directive whatsoever.