ML20202C255

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. IST Plan Includes Nine Relief Requests Which Require NRC Review & Approval
ML20202C255
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/01/1997
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202C262 List:
References
W3F1-97-0265, W3F1-97-265, NUDOCS 9712030294
Download: ML20202C255 (2)


Text

,,

7-A

{

Ente gy perations. ine.

\\M

.j KacrA LA~c0G6 Tel 504 739 0242 Er C. Ewing. til 13,ygoger n neu a, uws 3

W3F1-97-0265 A4.05 PR December 1,1997 U.S. Nuclear Regulatory Commission ATTN' Document Control Desk Washington, D.C. ?0555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Inservice Testing Plan Second 10 Year Interval, Revision 0 Gentlemen:

in accordance with the ASME Boiler and Pressure Vessel Code,Section XI,1989 Edition, paragraph IWA-1400(c), enclosed is an approved copy of the Waterford 3 Inservice Test (IST) Plan for the Second 10 Year Interval. The IST Plan includes nine (9) relief requests which require NRC review and approval.

Should you have any questions regarding the plan or relief requests, please contact Glenn Robin at (504) 739-6633.

Very truly yours, n

)

[

E.C. Ewing Director Nuclear Safety & Regulatory Affairs ECE/DMU/tjs Attachment lllhllhllllllllll((lllll 9712030294 971201 on Apocn o y

iia i i

~. =...

b.

r?u~;;

t; n

'. Inservice Testing Plan.-

Second 10 Year interval, Revision 0 l

W3F1-97-0265

Page 2 :

December 1,- 1997 -

. cc:

E.W.' Merschoff, NRC Region IV.

C.P. Patel, NRC-NRR J. Smith N.S. Reynolds :

'NRC Resident inspecters Office i;

9 g.

t

[

4 J

d<

4 1

x l

-