ML20202B772

From kanterella
Jump to navigation Jump to search
Forwards Revised Vallecitos Nuclear Ctr Radiological Contingency Plan. Changes Mostly Editorial or Reflect Changes in Position Titles.Change of GE Test Reactor OL to Possess Only Status Also Included
ML20202B772
Person / Time
Site: 07000754
Issue date: 06/16/1986
From: Cunningham G
GENERAL ELECTRIC CO.
To: Cunningham R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20202B777 List:
References
27109, NUDOCS 8607100405
Download: ML20202B772 (1)


Text

76-759 RETURN TO 396-SS

,f ret GENERAL $ ELECTRIC NUCLEAR ENERGY BUSINESS OPERATIONS GENERAL ELECTRIC COMPANY

  • VALLECITOS NUCLEAR CENTER e PLEASANTON, CAUFORNIA 94566 h

June 16, 1986

..i ecEm 3

'86 JUN 20 P4 :01.4 Mr. Richard E. Cunningham, Director

[$

Division of Fuel Cycle and Material Safety v.g_

Office of Nuclear Material Safety and Safeguards tE.FEEtGtd,,IM N U.S. Nuclear Regulatory Commission Washington, D.C.

20555

References:

1) License SNM-960, Docket 70-754.
2) "Vallecitos Nuclear Center Radiological Contingency Plan";

November, 1982; Revised March, 1983.

Dear Mr. Cunningham:

Enclosed are revised pages for the radiological contingency plan for the Vallecitos Nuclear Center.

The changes are for the most-part editorial or changes in position titles.

In addition, the revisions reflect the change of the General Electric Test Reactor from an operating license to a posse :s only status and the change in the frequency of criticality alarm tests.

None of the revisions reduce the effectiveness of the plan.

Sincerely, G. E. Cunnin'g am Senior Licensing Engineer (415) 862-4330 l

/ca p t?;/

Enclosures y

m l

usNac l

9:

JUN 191986 ) {2 NMSS Mall SECTION g

_-n DOCKET CLERK

/

.BWY. O t hi U l

\\

l A

w \\ to

\\Lv(Wt i-t l

fp 8607100405 860616 PDR ADOCK 07000754 j

C PDR l

4 MP

[

]