Letter Sequence Other |
---|
|
|
MONTHYEARML20199K5761986-04-0404 April 1986 Proposed Tech Specs,Incorporating Operability & Surveillance Requirements for Fire Suppression Equipment in Compressor Room.Discussion,Justification & NSHC Encl Project stage: Other ML20199K5711986-04-0404 April 1986 Application for Amend to License DPR-40,incorporating Operability & Surveillance Requirements for Fire Suppression Equipment in Compressor Room Into Tech Spec Sections 2 & 3 Project stage: Request ML20199K5421986-04-0909 April 1986 Forwards Application for Amend to License DPR-40, Incorporating Operability & Surveillance Requirements for Fire Suppression Equipment in Compressor Room.Certificate of Svc Encl.Fee Paid Project stage: Request ML20202B5411986-07-0101 July 1986 Safety Evaluation Supporting Amend 98 to License DPR-40 Project stage: Approval ML20202B5341986-07-0101 July 1986 Amend 98 to License DPR-40,revising Sections 2 & 3 of Tech Specs to Incorporate Operability & Surveillance Requirements for New Fire Suppression Equipment in Compressor Room Project stage: Other ML20202B5121986-07-0101 July 1986 Forwards Amend 98 to License DPR-40 & Safety Evaluation. Amend Revises Sections 2 & 3 of Tech Specs to Incorporate Operability & Surveillance Requirements for New Fire Suppression Equipment in Compressor Room Project stage: Approval 1986-04-09
[Table View] |
|
---|
Category:OPERATING LICENSES & AMENDMENTS
MONTHYEARML20217B5201999-10-0606 October 1999 Amend 193 to License DPR-40,revising TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance Requirements for RCS Flow Rate ML20211L3441999-09-0202 September 1999 Corrected Tech Spec Page 2-50 to Amend 192 to License DPR-40.Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) ML20210G2131999-07-27027 July 1999 Amend 192 to License DPR-40,revising TS Sections 2.2 & 2.10. 2 to Relocate 3 cycle-specific Parameters to Core Operating Limits Repts ML20210D9861999-07-22022 July 1999 Amend 191 to License DPR-40,authorizing Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation Actuation Signal Closure Signal to Reactor Coolant Sys ML20205Q5791999-04-15015 April 1999 Amend 190 to License DPR-40,revising TS 5.2.f & TS 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20207E9761999-03-0303 March 1999 Errata to Amend 188 to License DPR-40,correcting Incorrect Page Number,Missing Parenthesis & Misspelled Word ML20198S3731998-12-31031 December 1998 Amend 189 to License DPR-40,revising TS 2.1.6 to Restrict Number of Inoperable Main Steam Safety Valves When Reactor Critical & Revising Associated Basis ML20198S4611998-12-31031 December 1998 Amend 188 to License DPR-40,revising TS 2.12, Control Room Sys, to Delete Limiting Condition for Operation & Surveillance for Control Room Temp ML20154M4841998-10-19019 October 1998 Amend 186 to License DPR-40,revising TS 2.3 to Increase Allowed Outage Times for SIT ML20154N2361998-10-19019 October 1998 Amend 187 to License DPR-40,revising TS 3.9 to Clarify Required Flow Paths for Auxiliary Feedwater Sys & Deleting Surveillance Requirement for Specific Auxiliary Feedwater Pump Discharge Pressure ML20217L0521998-03-23023 March 1998 Amend 185 to License DPR-40,revising TS to Implement 10CFR50,App J,Option B & to Allow Performance Based Changes in Conducting ILRT & Local Leak Rate Testing Types B & C & SER ML20203M4121998-02-0303 February 1998 Amend 184 to License DPR-40,revising TS to Reflect Administrative Changes ML20203A4131998-01-26026 January 1998 Amend 183 to License DPR-40,revises TS to Delete Requirements for Toxic Gas Monitoring Sys Contained in TS 2.22 & TS 3.1,table 3-3,item 29,for Toxic Chemicals Except Ammonia ML20203E0171997-12-10010 December 1997 Corrected TS Pages 3-7 & 3-12 to Amend 182 to License DPR-40,adding Words That Were Omitted from TS Pages ML20199L0441997-11-24024 November 1997 Amend 182 to License DPR-40,revising TSs to Correct & Clarify Several Surveillance Test Requirements for Reactor Protection Sys & Other Plant Instrumentation & Control Sys ML20137L6121997-03-27027 March 1997 Amend 181 to License DPR-40,revising Section 5.2 of TS to Relocate Controls for Working Hours to Updated Safety Analysis Rept ML20134N7651997-02-13013 February 1997 Amend 180 to License DPR-40,revises TS to Add Limiting Condition for Operation & Surveillance Test for Safety Related Inverters & Deletes Nonsafety Related Instrument Buses ML20133M6641997-01-15015 January 1997 Errata to Amend 179 to License DPR-40,revising Page 2-22 Which Incorrectly Stated Amount of Active TSP That Shall Be Contained in TSP Baskets ML20133C2741996-12-30030 December 1996 Amend 179 to License DPR-40,revising TSs to Increase Amount of TSP Dodecahydrate Located in Containment Sump Storage Baskets ML20129H3261996-10-25025 October 1996 Amend 178 to License DPR-40,changing Section 4.3.2 of TS to Allow Use of Zircaloy or ZIRLO Fuel Cladding & to Use Depleted U as Reactor Fuel Matl ML20128F6251996-10-0202 October 1996 Amend 177 to License DPR-40,modifying Paragraph 2.B.(2) W/Ref to 10CFR40 Allowing Use of Source Matl,In Form of Depleted or Natural U,As Reactor Fuel ML20129G2911996-09-27027 September 1996 Amend 176 to License DPR-40,revising Sections 2.18,3.14, 3.3 & 5.10 of TS to Relocate Snubber Operability Requirements to USAR ML20059J1671994-01-14014 January 1994 Amend 160 to License DPR-40,changes TS to Implement GLs 86-10 & 88-12 ML20059J2441994-01-14014 January 1994 Amend 159 to License DPR-40,revises TS to Change Setpoint Limit for degraded-voltage Protection Sys Referred to as offsite-power Low Signal ML20058G9301993-12-0303 December 1993 Amend 158 to License DPR-40,changing Operating License Expiration Date to 130809,or 40 Years After Date of Issuance of Operating License Rather than 40 Years from Date of Issuance of CP ML20058F5911993-11-22022 November 1993 Amend 157 to License DPR-40,revising TS to Implement Administrative Changes ML20059G6491993-10-29029 October 1993 Amend 156 to License DPR-40,revising TS 2.10.4 to Establish Limit for cold-leg Temp to Maintain Departure from Nucleate Boiling Ratio Margin During Power Operation Above 15% of Rated Power ML20057F7971993-10-13013 October 1993 Corrected Page 3-20d to Amend 155 to License DPR-40,deleting Word Region I from Item 15 ML20056E5401993-08-12012 August 1993 Amend 155 to License DPR-40,changing TS to Increase Fuel Storage Capacity in Spent Fuel Pool to 1083 Fuel Assemblies ML20056E5361993-08-10010 August 1993 Amend 154 to License DPR-40,changing TS 3.2 (Table 3-5) to Require Charcoal Filter Volumetric Flow Rate of Between 4500 & 12000 Cubic Feet Per Minute ML20056D6711993-07-26026 July 1993 Amend 153 to License DPR-40,increasing Max Bypass Pressure for SG low-pressure Signal Trip Setting from 550 Psia to 600 Psia ML20056C3671993-05-12012 May 1993 Corrected TS Page 2-35 to Amend 150 to License DPR-40, Replacing Word and W/Word or in Spec 2.7.2.m ML20128B8171993-01-26026 January 1993 Amend 149 to License DPR-40,makes Changes to TSs 5.5 & 5.8 to Reflect Implementation of Qualified Reviewer Program for Review & Approval of New Procedures & Changes at Plant ML20062G6611990-11-19019 November 1990 Amend 134 to License DPR-40,addressing Two Administrative Changes ML20062B6101990-10-12012 October 1990 Amend 133 to License DPR-40,modified Tech Specs to Increase Refueling Boron Concentration to 1900 Ppm & Revises Storage Requirements of Spent Fuel Pool Region 2 ML20055G0191990-07-0606 July 1990 Amend 132 to License DPR-40,revising Tech Spec Pages 5-1, 5-5,5-8 & 5-19a to Incorporate Title Changes as Result of Reorganization & Partial Relocation of Emergency Planning Dept ML20248C0791989-06-0202 June 1989 Amend 122 to License DPR-40,extending Surveillance Interval by 25%,defining Regular Surveillance Intervals & Eliminating Need to Perform Surveillance on Inoperable Equipment ML20245L2831989-04-26026 April 1989 Amend 121 to License DPR-40,modifying Tech Specs to Change Containment Spray Sys Surveillance Testing Requirements to Provide Quantitative Value for Min Acceptance Criteria & Reducing Max Power Level on Figure 2-7 ML20245D2261989-04-14014 April 1989 Amend 120 to License DPR-40,changing Min Operating Requirements for Raw Water Pumps to Allow Operation W/One Inoperable Raw Water Pump When River Water Temp Below 60 F ML20235K8751989-02-14014 February 1989 Amend 119 to License DPR-40,deleting Paragraph 3.D & Modifying Tech Specs to Change Safety Injection & Refueling Water Tank Min Temp,Changing Title of Senior Vice President & Correcting Errors in Refs & Mailing Address ML20205S2381988-11-0303 November 1988 Amend 116 to License DPR-40,modifying Tech Specs to Provide Addition of Table of Contents for Tables & Figures & Correct Error to Location Ref in Section 2.19 ML20150A9921988-07-0101 July 1988 Amend 115 to License DPR-40,revising Section 5 of Tech Specs to Incorporate Recent Organizational & Job Title Changes & to Remove Onsite & Offsite Organizational Charts ML20150B2461988-06-28028 June 1988 Amend 114 to License DPR-40 Updating RCS pressure-temp Limits for Heatup & Cooldown to Reflect New Fluence Prediction Developed & More Limiting Chemistry Factor Associated W/Weld 3-410 ML20154A6691988-05-0404 May 1988 Amend 113 to License DPR-40,allowing Licensee to Use Annual Average (Rather than real-time) Meteorological Dispersion Factors to Calculate Doses & Corrects & Clarifies Some Parts of Tech Specs 2.9.1 & 5.9.4 ML20151S0471988-04-19019 April 1988 Amend 112 to License DPR-40,revises Tech Specs to Permit Extension for Next Due Date from 880430 to Refueling Outage Scheduled for Sept 1988 for Performing Insp of Diesel Generator 1 ML20235G8881987-09-24024 September 1987 Amend 111 to License DPR-40,incorporating Revised Surveillance Requirements for Diesel Generators Into Tech Specs,Per Generic Ltr 84-15, Proposed Staff Actions to Improve & Maintain Diesel Generator Reliability ML20215M1491987-05-0404 May 1987 Amend 109 to License DPR-40,modifying Tech Specs to Reflect Changes Necessary to Support Cycle 11 Operation ML20210C3921987-04-28028 April 1987 Amend 108 to License DPR-40,incorporating Revised Limiting Conditions for Operation & Surveillance Requirements for Steam Generator Isolation Signal ML20206B4651987-03-30030 March 1987 Amend 107 to License DPR-40,revising Tech Specs to Delete Hydrogen Fluoride Detectors from Tables 2-11 & 3-3 ML20197D4531987-03-26026 March 1987 Amend 105 to License DPR-40,changing Tech Specs by Deleting safety-related Snubber Lists,Per Generic Ltr 84-13 1999-09-02
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217B5201999-10-0606 October 1999 Amend 193 to License DPR-40,revising TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance Requirements for RCS Flow Rate ML20211L3441999-09-0202 September 1999 Corrected Tech Spec Page 2-50 to Amend 192 to License DPR-40.Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) ML20210G2131999-07-27027 July 1999 Amend 192 to License DPR-40,revising TS Sections 2.2 & 2.10. 2 to Relocate 3 cycle-specific Parameters to Core Operating Limits Repts ML20210D9861999-07-22022 July 1999 Amend 191 to License DPR-40,authorizing Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation Actuation Signal Closure Signal to Reactor Coolant Sys ML20195B4371999-05-26026 May 1999 Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure- Temp Limits Rept ML20205Q5791999-04-15015 April 1999 Amend 190 to License DPR-40,revising TS 5.2.f & TS 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20205J7631999-03-31031 March 1999 Application for Amend to License DPR-40,increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate ML20207E9761999-03-0303 March 1999 Errata to Amend 188 to License DPR-40,correcting Incorrect Page Number,Missing Parenthesis & Misspelled Word ML20203A0991999-01-29029 January 1999 Application for Amend to License DPR-40,relocating Three cycle-specific Parameter Limits from FCS TS to COLR ML20198S4611998-12-31031 December 1998 Amend 188 to License DPR-40,revising TS 2.12, Control Room Sys, to Delete Limiting Condition for Operation & Surveillance for Control Room Temp ML20198S3731998-12-31031 December 1998 Amend 189 to License DPR-40,revising TS 2.1.6 to Restrict Number of Inoperable Main Steam Safety Valves When Reactor Critical & Revising Associated Basis ML20195K1771998-11-17017 November 1998 Revised Application for Amend to License DPR-40, Incorporating Addl Restrictions on Operation of MSSVs ML20154N2361998-10-19019 October 1998 Amend 187 to License DPR-40,revising TS 3.9 to Clarify Required Flow Paths for Auxiliary Feedwater Sys & Deleting Surveillance Requirement for Specific Auxiliary Feedwater Pump Discharge Pressure ML20154M4841998-10-19019 October 1998 Amend 186 to License DPR-40,revising TS 2.3 to Increase Allowed Outage Times for SIT ML20154A0661998-09-28028 September 1998 Application for Amend to License DPR-40,allowing Installation of Capability for Override of Containment Isolation Actuation Signal Closure Signal to Containment Isolation Valves for RCS Letdown Flow ML20217L0521998-03-23023 March 1998 Amend 185 to License DPR-40,revising TS to Implement 10CFR50,App J,Option B & to Allow Performance Based Changes in Conducting ILRT & Local Leak Rate Testing Types B & C & SER ML20217B8481998-03-18018 March 1998 Application for Amend to License DPR-40,changing TS 5.2 & 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20217B8181998-03-18018 March 1998 Application for Amend to License DPR-40,requesting Tech Specs Set Forth in App a to License Amended to Clearly Address Regulatory Requirements for Alternate Shutdown Panel & Auxiliary Feedwater Panel ML20217P1981998-03-0303 March 1998 Application for Amend to License DPR-40,revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20203M4121998-02-0303 February 1998 Amend 184 to License DPR-40,revising TS to Reflect Administrative Changes ML20199L7221998-01-30030 January 1998 Application for Amend to License DPR-40,requesting Deletion of Section 3.E, License Term from License ML20199L8911998-01-30030 January 1998 Application for Amend to License DPR-40,relocating pressure- Temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept (PTLR) ML20203A4131998-01-26026 January 1998 Amend 183 to License DPR-40,revises TS to Delete Requirements for Toxic Gas Monitoring Sys Contained in TS 2.22 & TS 3.1,table 3-3,item 29,for Toxic Chemicals Except Ammonia ML20203G4101997-12-11011 December 1997 Application for Amend to License DPR-40,adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20203E0171997-12-10010 December 1997 Corrected TS Pages 3-7 & 3-12 to Amend 182 to License DPR-40,adding Words That Were Omitted from TS Pages ML20199L0441997-11-24024 November 1997 Amend 182 to License DPR-40,revising TSs to Correct & Clarify Several Surveillance Test Requirements for Reactor Protection Sys & Other Plant Instrumentation & Control Sys ML20199K1221997-11-21021 November 1997 Application for Amend to License DPR-40,revising Tech Specs 5.19 by Incorporating Editoral Changes & Two Exceptions to NEI-94-01,Rev 0, Industry Guideline for Implementing Performance-Based Option of 10CFR50,App J ML20217G4541997-10-0303 October 1997 Application for Amend to License DPR-40,revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20196J0781997-07-25025 July 1997 Application for Amend to License DPR-40,allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance & Implementing Option B of 10CFR50,App J ML20137Y1591997-04-17017 April 1997 Application for Amend to License DPR-40,requesting Rev to Administrative Controls Consistent w/NUREG-1432 Standard TS for Combustion Engineering Plants.Tech Specs Encl ML20137L6121997-03-27027 March 1997 Amend 181 to License DPR-40,revising Section 5.2 of TS to Relocate Controls for Working Hours to Updated Safety Analysis Rept LIC-97-0049, Application for Amend to License DPR-40,incorporating Addl Restrictions on Operation of MSSVs1997-03-26026 March 1997 Application for Amend to License DPR-40,incorporating Addl Restrictions on Operation of MSSVs ML20138L4341997-02-20020 February 1997 Application for Amend to License DPR-40,requesting to Update TS Re Rev to Position Titles & Relocation of Controls for Personnel Working Hours ML20134N7651997-02-13013 February 1997 Amend 180 to License DPR-40,revises TS to Add Limiting Condition for Operation & Surveillance Test for Safety Related Inverters & Deletes Nonsafety Related Instrument Buses ML20133M6641997-01-15015 January 1997 Errata to Amend 179 to License DPR-40,revising Page 2-22 Which Incorrectly Stated Amount of Active TSP That Shall Be Contained in TSP Baskets ML20133C2741996-12-30030 December 1996 Amend 179 to License DPR-40,revising TSs to Increase Amount of TSP Dodecahydrate Located in Containment Sump Storage Baskets ML20134N8491996-11-20020 November 1996 Application for Amend to License DPR-40,requesting Administrative Revisions to Paragraph 3,Table of Contents, Tech Spec 2.15 & Section 5 of Appendix a ML20129H3261996-10-25025 October 1996 Amend 178 to License DPR-40,changing Section 4.3.2 of TS to Allow Use of Zircaloy or ZIRLO Fuel Cladding & to Use Depleted U as Reactor Fuel Matl ML20129E4921996-10-24024 October 1996 Application for Amend to License DPR-40,TS 4.3.2, Reactor Core & Control, Allowing Use of Either Zircaloy or ZIRLO Cladding ML20129C2491996-10-22022 October 1996 Application for Amend to License DPR-40,revising TS 4.3.2, Reactor Core & Control & Adding Ref to WCAP-12610 in TS 5.9.5b ML20128F6251996-10-0202 October 1996 Amend 177 to License DPR-40,modifying Paragraph 2.B.(2) W/Ref to 10CFR40 Allowing Use of Source Matl,In Form of Depleted or Natural U,As Reactor Fuel ML20129G2911996-09-27027 September 1996 Amend 176 to License DPR-40,revising Sections 2.18,3.14, 3.3 & 5.10 of TS to Relocate Snubber Operability Requirements to USAR ML20117B8771996-08-23023 August 1996 Application for Amend to OL Revising Paragraph 2.B of License to Allow Use of Source Matl as Reactor Fuel ML20115F9971996-07-15015 July 1996 Application for Amend to License DPR-40,revising Description of Reactor Core & Control & Adding Westinghouse Topical Rept List of Analytical Methods,Used to Determine Core Operating Limits ML20112D3151996-05-31031 May 1996 Application for Amend to License DPR-40,adding LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6951996-05-20020 May 1996 Application for Amend to License DPR-40,clarifying Surveillance Test Requirements in TS 3,1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5871996-05-17017 May 1996 Application for Amend to License DPR-40,relocating Operability Requirements for Shock Suppressors (Snubbers) from TS to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20097C3031996-02-0101 February 1996 Application for Amend to License DPR-40,allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool ML20100C0161996-01-22022 January 1996 Application for Amend to License DPR-40 Revising TS Re Requirement for Placing Sirw Tank low-level Channels in Bypass Rather than Trip ML20094N8571995-11-16016 November 1995 Application for Amend to License DPR-40,adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses 1999-09-02
[Table view] |
Text
,
r ate
[ o,, UNITED STATES E o NUCLEAR REGULATORY COMMISSION
- E WASHINGTON. D. C. 20555 o t
% .... /
OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION, UNIT N0. 1 AMENDMENT TO FACILITY OPERATING L-ICtNSE Amendment No.98 License No. OPR-40
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Omaha Public Power District (the licensee) dated April 9, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
~
8607100325 860701 PDR P ADOCK 05000285 PDR
l t
- 2. Accordingly, Facility Operating License No. DPR-40 is amended by changes to the Technical Specifications as indicated in the attachment to this i
license amendment, and paragraph 3.8. of Facility Operating License No.
DPR-40 is hereby amended to read as follows:
i B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 98 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications, t
- 3. This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION ihhdA 0Av
- e Ashok C. Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B
Attachment:
Changes to the Technical i Specifications Date of Issuance: July 1, 1986 i
i i
t t
_ _ . _ _ . ~ . _ _ . . _ _ . . . . . . . . _ _ , . . . - _ _ . _ _ . . . _ . _ - . _ _ , _ _ _ _ _ . , . ~ . . _ . _ , _ _ , _ - _ . , . _ _ . _ . . _ , _ _ - . _ . - -
ATTACHMENT TO LICENSE AMEN 0 MENT NO. gg FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Revise Appendix "A" Technical Specifications as indicated below. The revised pages are identified by amendment number and contain vertical lines indicating
- the area of change.
i
\
4 Remove Pages Insert Pages 2-91 2-91 i 3-81 3-81 i
3-83 3-83 i ,
4 4
4 I
i' i
i i
4 4
}
i 0
4
-r. . _ . _ _ . _ - . . - , _ _ . .
2.0 LIMITIf4G C0t4DITI0t45 FOR OPERATION 2.19 Fire Protection System (Continued)
(3) The provisions set forth in Section 2.19(2) do not apply to time periods during which Containment Integrated Leak Rate Tests are being performed.
(4) Fire suppression water system shall be operable, except during system testing, jockey pump maintenance or training (not to exceed 7 consecutive days) with both fire pumps, each with a minimum capacity of 1800 gpm, with their discharge aligned to the fire suppression header and automatic initiation logic for each fire pump.
- a. With less than the above required equipment:
(i) restore the inoperable equipment to operable status within 7 days.
(ii) if equipment is not restored to operable status within 7 days, prepare and submit a report to the Nuclear Regulatory Commission, pursuant to Section 5.9.3. i of the Technical Specifications, within the next 30 days, outlining the plans and procedures to be used to provide for the loss of the system and the cause of the malfunction.
- b. With no fire suppression water system operable:
(i) establish a backup fire suppression water system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
(ii) notify the Nuclear Regulatory Commission, pursuant to Section 5.9.2.a of the Technical Specifications, outlining the cause of the malfunction, the actions taken, and the plans and schedule for restoring the system to operable status.
(iii) If (i) above cannot be fulfilled, place reactor in Hot Standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in Cold Shutdown within the following thirty (30) hours.
(5) The sprinkler system in the Diesel Generator Rooms, the sprinklers above the steam driven auxiliary feedwater pump, the sprinkler / spray nozzle system in the compressor room, and the deluge system in the personnel corridor between fire areas 6 and 20 shall be operable except during system testing. If inoperable:
- a. Within one hour establish a continuous fire watch with backup fire extinguishing equipment for those areas in which redundant systems or components could be damaged; for other areas, establish an hourly fire watch patrol, i
i Amendment tio. /E,EJ,98 2-91 4
3.0 SURVEILLANCE REQUIREMENTS 3.15 Fire Protection System (Continued)
- 3. Verify that each fire pump starts automatically on low fire system pressure to maintain the fire suppression water system pressure >100 psig.
- e. At least once per 3 years by performing a flow test of the system in accordance with Chapter 5, Section 11 of the Fire Protection Handbook, 14th Edition, published by the National Fire Protection Association using a clean water source.
- f. At least once per year by visually inspecting the strainer on the discharge side of the fire pumps to verify operability.
(3) The sprinkler system in the Diesel Generator Rooms, the sprinklers above the steam driven auxiliary feedwater pump, the sprinkler / spray nozzle system in the compressor room, and the deluge system in the personnel corridor between fire areas 6 and 20 shall be demonstrated to be oprable:
- a. At least once per 18 months
- 1. By visual inspection of the spray / sprinkler headers to verify their integrity.
- 2. By visual inspection of each spray / sprinkler nozzle to verify no blockage and no obstruction of the spray area.
- 3. By performing a system functional test which includes simulated automatic actuation of the system and verifies that all automatic valves actuate to their correct position.
- b. At least once per 3 years by performing an air flow test through each open head spray / sprinkler header and verifying each open
, head spray / sprinkler nozzle is unobstructed.
(4) Each fire hose station designated in Table 2-8 shall be verified to be operable:
- a. At least once per month by visual inspection of the station to assure all equipment is available and the system pressure (as determined at the jockey pump pressure gauge) is within limits,
- b. At least once per 18 months by removing the hose for inspection and reracking and replacing any degraded gaskets in the couplings.
- c. At least once per 3 years by:
- 1. Partially opening the hose station valves to verify valve operability and no blockage.
Amendment No. 40, D ,98 3-d1
3.0 SURVEILLANCE REQUIREMENTS 3.15 Fire Protection System (Continued) l
- b. At least once every 6 months by verifying each halon storage tank pressure and weight or level.
- c. At least once every 18 months by:
- 1. Verifying the system, including associated ventilation dampers (if applicable), is actuated by a simulated test signal. Manual and automatic test signals will be alternated every 18 months.
- 2. Visual inspection of spray headers to verify integrity.
- 3. Visual inspection of all nozzles to ensure no blockage.
- d. At least once every three years by performing an air flow test through each header and nozzle to assure no blockage.
(9) Battery powered smoke detectors in control room cabinets and consoles shall be demonstrated OPERABLE by performance of an operational test performed using a built-in test device at least semi-annually.
Basis The fire protection system provides a means for detecting, alarming, and extinguishing plant fires. The system is divided into the fire detection subsystem and fire extinguishing subsystem.
The fire detection subsystem is an instrumentation system which alarms control room operators of a fire, indicating fire location on a panel in the control room, and providing local indication from the detector in the affected zone.
The fire extinguishing system includes the sprinklers which protect the Diesel Generator Rooms. Also included are the hose stations which protect the immediate vicinity outside the entire plant, hose cabinets inside the intake structure, and other miscellaneous equipment.
Maintaining the operability of the fire protection system under various operating conditions is eesential to insure the integrity f various nuclear safety-related plant systems and equipment. The above surveil-lance measures aid in accomplishing this objective.
Specification 3.15(2)f provides a surveillance program that insures that silt and other material in the river water will not prevent the delivery of water to areas protected by fire water suppression systems.
1 l
Amendment No. 40,$3,gg 3-83
__-.- - . _ - .