Ack Receipt of Which Transmitted Changes to REP for Fort Calhoun Station Submitted Under Provisions of 10CFR50,Appendix E & 10CFR50.4(b)(5)(iii).NRC Approval Not Required
ML20202B520
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/06/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9802120037
Download: ML20202B520 (3)


Text

_

l

  • s eS U84 UNITt3 STATES
  • j

'4,

4 t

NUCLEAR REGULATORY COMMISSION f.

)

naciow ev

'4,, * * * *

  • o[

$11 RYAN Pl.AIA OMIVE,sulTE 400 AM LINGToN,1 E XA5 760119064 February 6, 1998 S. K. Gambhir, Division Manager Engineering & Operations Support Omaha Public Power District -

Fort Calhoun Station FC 2-4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-03g9

SUBJECT:

CHANGES TO THE FORT CALHOUN STATION RADIOLOGICAL EMERGENCY PLAN This letter acknowledges receipt of your "LIC-97-0090, Forwards Listed EPIP & RERP Changes for Plant.Epip FC-EPF-21 Revised to Change Map Indicating Replacement of Lagoon W/ Parking Lot & Also to Indicate Placement of 161kV & [[power source" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Towers|letter dated May 22,1997]], which transmitted changes to the Radiological Emergency Plan for the Fort Calhoun Station submitted under the provisions of 10 CFR 50, Appendix E and 10 CFR 50.4(b)(5)(ill).

Based on your determination that the changes do not decrease the overall effectiveness of your emergency plan and that it continues to meet tha standards of 10 CFR 50.47(b) and the requirements of Appendix E to Part 50, NRC approval is not required. Our initial review of these changes indicates that they are in accordance with 10 CFR 50.54(q). Implementation of thesa changes will be subject to inspection to confirm that they have not decreased the overall effectiveness of your emergency plan.

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.

Sincerely, Blaine Murray, Chief Plant Support Branch Division of Reactor Safety Docket No.:

60 2BS License No.: DPR-40

'I h

^ T20035 L(IJll$UMI!I 9902120037 990206

~

PDR ADOCK 05000283 F

PDR

/

Omaha Public Power District 2-cc:

Jarnos W. Tills, Mariager Nuclear Lloonsing Omaha Public Power District Fort Calhoun Station FC 2-4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.

Winston & Strawn 1400 L. Street, N.W.

Washington, D.C. 20005-3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007

_m

=

==

s i

g

,e &

c Omaha Public Power District 3-DISTR BUTION:

i 08t2 $0 46) -

Regional Administrator DRS Director DRS Deputy Director DRS-PSB DRP Director Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

Resident inspector MIS System (Elko)

RIV File DRS Action item File (97-E-0021) i i

1 DOCUMENT NAME: G:\\DRSLTRS\\FC9804EP. LOO TAC #XO3391 G:\\DRSLTRS\\FC9804EP. MOO To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No ayy RIV;PSB C:DRS\\PSB THAndrews:nh @ BMurray b 02/$98 02Fj98 i

OFFICIAL RECORD COPY

.. ~. -

-